Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 24 Online
» 3766 Today
» 4463 Yesterday
» 29648 Week
» 52619 Month
» 399043 Year
» 3425896 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D286 25/07/1960  
TOPS (Tops) 40086 03/1974  

Locomotive Specifics
Class as Built 40
Subclass/Rebuild History
ClassFrom
4025/07/1960
Wheel Arrangement 1Co-Co1
Builder English Electric Vulcan Foundry
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Stone OK4625
Multiple Fitting Blue Star
Other Details Disc Route Indicators
To Service 25/07/1960 to Gateshead (52A)
Withdrawn 23/01/1985
Time in Service 24 yrs, 5 mths , 29 dys
Cut Up m/e 02/1985
Cut At Locomotive Works (Doncaster)
Information Life expired/surplus
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GNP All over Green including front of cab 25/07/1960
GFYE Green with full yellow cab front or nose by 06/1969
BFYE BR Blue bodywork, full yellow cab front by 04/1970

Allocations - WIP
Code Subsequent Codes Name From Date
52A   Gateshead (New) on 25/07/1960
55H   Neville Hill 4w/e 26/02/1966
50A   York (North) 4w/e 26/02/1966
52A   Gateshead 4w/e 25/03/1967
50A   York (North) 4w/e 07/10/1967
52A   Gateshead 4w/e 25/05/1968
55B   York (North) w/e 06/05/1972
GD   Gateshead w/e 29/02/1976
     Withdrawn on 23/01/1985

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
18/07/1969   Air Brakes fitted        

Configuration - WIP
Date Configuration Description Additional Diagram Source
25/07/1960 vb Vacuum brakes, Steam heat      
18/07/1969 xb Dual brakes, Steam heat      

Fires
Date of Fire Severity Damage Source of Fire Material Details Location
19/02/1970 Severe   Electrical overloads or arcs Electrical insulation Passenger working  
13/10/1970 Not severe   Brake block sparks Fuel or lubricating oil sprays or leaks Freight working  


Summary
Start Event Details Source See Also
25/07/1960 To Service To service as British Railways number D286
Built at English Electric Vulcan Foundry
Allocated to Gateshead (52A)
Livery applied: All over Green including front of cab
   
26/02/1966 Allocation Reallocated to Neville Hill (55H)    
26/02/1966 Allocation Reallocated to York (North) (50A)    
25/03/1967 Allocation Reallocated to Gateshead (52A)    
07/10/1967 Allocation Reallocated to York (North) (50A)    
25/05/1968 Allocation Reallocated to Gateshead (52A)    
06/1969 Livery Change of livery to Green with full yellow cab front or nose    
18/07/1969 Modification Modification: Air Brakes fitted    
04/1970 Livery Change of livery to BR Blue bodywork, full yellow cab front    
06/05/1972 Allocation Reallocated to York (North) (55B)    
03/1974 Renumbered Renumbered to 40086    
29/02/1976 Allocation Reallocated to Gateshead (GD)    
23/01/1985 Withdrawn Condemned as 40086    
02/1985 Scrapped Broken up by Locomotive Works: Doncaster    

prev prev