Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 19 Online
» 2603 Today
» 5000 Yesterday
» 28637 Week
» 127282 Month
» 329946 Year
» 3356799 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D329 18/01/1961  
TOPS (Tops) 40129 03/1974  

Locomotive Specifics
Class as Built 40
Subclass/Rebuild History
ClassFrom
4018/01/1961
Wheel Arrangement 1Co-Co1
Builder English Electric Vulcan Foundry
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Stone OK4625
Multiple Fitting Blue Star
Other Details Split Headcode Box
To Service 18/01/1961 to Crewe North (5A)
Withdrawn 24/05/1984
Time in Service 23 yrs, 4 mths , 6 dys
Cut Up m/e 08/1984
Cut At Locomotive Works (Doncaster)
Information Power unit damage
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GNP All over Green including front of cab 18/01/1961

Allocations - WIP
Code Subsequent Codes Name From Date
5A   Crewe North (New) on 18/01/1961
1B   Camden w/e 28/01/1961
1A   Willesden w/e 09/01/1965
5A   Crewe North w/e 20/02/1965
1A   Willesden w/e 17/04/1965
1E   Bletchley w/e 02/10/1965
WL   Western Lines (LMR) on 18/04/1966
D05   Stoke Division on 17/06/1968
D09   Manchester Division w/e 09/11/1968
     Withdrawn on 24/05/1984

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
by 06/01/1970   Steam heat boiler isolated        
04/1970   EQ Brakes Added        
by 30/08/1970   Steam heat boiler isolated        
03/1974   Air Brakes fitted        
03/1974   EQ Brakes Removed        
by 03/1978   Modified headcode box (black blinds with 2 marker lights)        

Configuration - WIP
Date Configuration Description Additional Diagram Source
18/01/1961 vb Vacuum brakes, Steam heat      
by 06/01/1970 vi Vacuum brakes, Isolated boiler      
04/1970 vi Vacuum brakes, Isolated boiler EQ Brakes    
by 30/08/1970 vi Vacuum brakes, Isolated boiler EQ Brakes    
03/1974 xi Dual brakes, Isolated boiler      


Summary
Start Event Details Source See Also
18/01/1961 To Service To service as British Railways number D329
Built at English Electric Vulcan Foundry
Allocated to Crewe North (5A)
Livery applied: All over Green including front of cab
   
28/01/1961 Allocation Reallocated to Camden (1B)    
09/01/1965 Allocation Reallocated to Willesden (1A)    
20/02/1965 Allocation Reallocated to Crewe North (5A)    
17/04/1965 Allocation Reallocated to Willesden (1A)    
02/10/1965 Allocation Reallocated to Bletchley (1E)    
18/04/1966 Allocation Reallocated to Western Lines (LMR) (WL)    
17/06/1968 Allocation Reallocated to Stoke Division (D05)    
09/11/1968 Allocation Reallocated to Manchester Division (D09)    
06/01/1970 Modification Modification: Steam heat boiler isolated    
04/1970 Modification Modification: EQ Brakes Added    
30/08/1970 Modification Modification: Steam heat boiler isolated    
03/1974 Modification Modification: Air Brakes fitted    
03/1974 Modification Modification: EQ Brakes Removed    
03/1974 Renumbered Renumbered to 40129    
03/1978 Modification Modification: Modified headcode box (black blinds with 2 marker lights)    
24/05/1984 Withdrawn Condemned as 40129    
08/1984 Scrapped Broken up by Locomotive Works: Doncaster    

prev prev