Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 26 Online
» 2784 Today
» 5000 Yesterday
» 28818 Week
» 127463 Month
» 330127 Year
» 3356980 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D2299 11/10/1960  

Locomotive Specifics
Class as Built 04
Subclass/Rebuild History
ClassFrom
3' 7" engines11/10/1960
Wheel Arrangement 0-6-0
Builder Drewry Car Co. Ltd.
Works Number 2680
To Service 11/10/1960 to Lincoln (40A)
Withdrawn 11/01/1970
Time in Service 9 yrs , 3 mths
Cut Up m/e 02/1984
Cut At C F Booth (Rotherham)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
40A   Lincoln (New) on 11/10/1960
40B   Immingham w/e 23/07/1966
40A   Lincoln w/e 02/03/1968
52A   Gateshead w/e 20/07/1968
     Withdrawn on 11/01/1970

Configuration - WIP
Date Configuration Description Additional Diagram Source
11/10/1960 v Vacuum brakes      


Summary
Start Event Details Source See Also
11/10/1960 To Service To service as British Railways number D2299
Built at Drewry Car Co. Ltd., Works Number 2680
Allocated to Lincoln (40A)
   
23/07/1966 Allocation Reallocated to Immingham (40B)    
02/03/1968 Allocation Reallocated to Lincoln (40A)    
20/07/1968 Allocation Reallocated to Gateshead (52A)    
11/01/1970 Withdrawn Condemned as 2299    
02/1984 Scrapped Broken up by C F Booth: Rotherham    

prev prev