Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 19 Online
» 1276 Today
» 5000 Yesterday
» 27310 Week
» 125955 Month
» 328619 Year
» 3355472 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 2236 m/e 10/1918
London and North Eastern Railway (1946) 3393   15/09/1946
British Railways 63393 w/e 14/08/1948

Locomotive Specifics
Designer V. Raven
Class Q6
Company History NER/LNER
Rebuild History
ClassFrom
Q610/1918
Wheels 0-8-0
Builder Darlington Works
Order Number 131A
Fittings (as built)
Engine Brakes Steam
To Service During 10/1918 to Borough Gardens (BOR)
Withdrawal Wed 17/06/1964 off Tyne Dock (52H)
Service Life 45 yrs, 8 mths , 18 dys

Disposal

Notes
Notes Into Darlington for cutting up 4/9/64

Allocations
Code Subsequent Codes Name From Date
BOR   Borough Gardens (New) m/e 10/1918
SKN   Stockton on 28/03/1943
51D   Middlesbrough on 04/06/1950
51D   Middlesbrough m/e 30/06/1950
51L   Thornaby on 01/06/1958
52H   Tyne Dock on 02/12/1962
     Withdrawn on 17/06/1964

SLS Allocations*
Type Code Name From Date
ALLOC 51D Middlesbrough m/e 30/06/1950
ALLOC 51L Thornaby on 08/06/1958
ALLOC 52H Tyne Dock w/e 08/12/1962
WDN   on 17/06/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
10/1918 Diagram 50 boiler fitted (number D833)
19/10/1932 Diagram 50 boiler fitted (number E4/42)
05/02/1936 Diagram 50 boiler fitted (number AW47)
17/08/1939 Diagram 50 boiler fitted (number AW26)
07/02/1942 Diagram 50 boiler fitted (number 2819)
01/07/1944 Diagram 50 boiler fitted (number 2439)
20/02/1947 Diagram 50A boiler fitted (number 2976)
15/10/1949 Diagram 50 boiler fitted (number 2862)
30/09/1955 Diagram 50A boiler fitted (number 24174)
30/05/1958 Diagram 50A boiler fitted (number 24211)
05/01/1962 Diagram 50A boiler fitted (number 24324)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 10/10/1923 13/12/1923 65 days General    
Gateshead Works 08/03/1926 29/06/1926 114 days General    
Gateshead Works 12/07/1929 25/09/1929 76 days General    
Gateshead Works 19/06/1931 20/07/1931 32 days Light Repair    
Gateshead Works 09/09/1932 19/10/1932 41 days General Boiler number E4/42 (Diagram 50)
 
Darlington Works 09/12/1935 05/02/1936 59 days General Boiler number AW47 (Diagram 50)
 
Darlington Works 10/07/1939 17/08/1939 39 days General Boiler number AW26 (Diagram 50)
 
Darlington Works 22/01/1940 26/03/1940 65 days Light Repair After collision
 
Darlington Works 14/01/1942 07/02/1942 25 days General Boiler number 2819 (Diagram 50)
 
Darlington Works 06/06/1944 01/07/1944 26 days General Boiler number 2439 (Diagram 50)
 
Gateshead Works 07/12/1945 22/12/1945 16 days Light Repair    
Darlington Works 19/12/1946 20/02/1947 64 days General Boiler number 2976 (Diagram 50A)
 
Darlington Works 29/03/1947 12/04/1947 15 days Light Repair    
Gateshead Works 02/08/1948 10/08/1948 9 days Light Repair Renumbered to BR 63393
 
Darlington Works 27/09/1949 15/10/1949 19 days General Boiler number 24230 (Diagram 50)
 
Darlington Works 17/10/1949 21/10/1949 5 days Unclassified    
Darlington Works 09/04/1952 03/05/1952 25 days Heavy Intermediate    
Darlington Works 05/05/1952 10/05/1952 6 days Unclassified    
Gateshead Works 27/07/1954 08/09/1954 44 days Heavy Casual    
Gateshead Works 08/08/1955 30/09/1955 54 days General Boiler number 24174 (Diagram 50A)
 
Gateshead Works 22/04/1958 30/05/1958 39 days General Boiler number 24211 (Diagram 50A)
 
Darlington Works 17/02/1959 23/02/1959 7 days Light Casual    
Darlington Works 28/08/1959 02/10/1959 36 days Light Casual    
Darlington Works 27/11/1961 05/01/1962 40 days General Boiler number 24324 (Diagram 50A)
 
Darlington Works 23/01/1962 06/02/1962 15 days Unclassified    

Mentions ...
Report Date Title Report Source
19/09/1964 Darlington Works (Yard) New Engine Shop: D3940, 12116, tender of 60530. Main Erecting shop: 60530 Sayajirao, 60844, 61214, 61330, 62059, 73095, 73132, 76095/9, 93368/610, D2246/72, D3657. Yard Paint shop: 60118 Archibald Sturrock. Yard: 43008 an 62041 being painted, 60522 Straight Deal, 60145 Saint Mungo, 60011 frames only, 61038 without nameplates, 61084, 63393, 65033/99, 43123, 44734, 68062, D2700, 90407; North Rd. scrap yard: 61229, 61321 and tender of 60020. SLS/196410

Summary
Date Event Details Source See Also
10/1918 To Service To service as North Eastern Railway Number 2236
Built at Darlington Works, Works Number
Allocated to Borough Gardens (BOR)
Diagram 50 boiler fitted
   
10/10/1923 Works Visit Works Visit - Gateshead Works (General) - Arr: 10/10/1923. Dep: 13/12/1923.    
08/03/1926 Works Visit Works Visit - Gateshead Works (General) - Arr: 08/03/1926. Dep: 29/06/1926.    
12/07/1929 Works Visit Works Visit - Gateshead Works (General) - Arr: 12/07/1929. Dep: 25/09/1929.    
19/06/1931 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 19/06/1931. Dep: 20/07/1931.    
09/09/1932 Works Visit Works Visit - Gateshead Works (General) - Arr: 09/09/1932. Dep: 19/10/1932.
Work undertaken:
Boiler number E4/42 (Diagram 50)
   
09/12/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 09/12/1935. Dep: 05/02/1936.
Work undertaken:
Boiler number AW47 (Diagram 50)
   
10/07/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 10/07/1939. Dep: 17/08/1939.
Work undertaken:
Boiler number AW26 (Diagram 50)
   
22/01/1940 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 22/01/1940. Dep: 26/03/1940.
Work undertaken:
After collision
   
14/01/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 14/01/1942. Dep: 07/02/1942.
Work undertaken:
Boiler number 2819 (Diagram 50)
   
28/03/1943 Allocation Reallocated to Stockton (SKN)    
06/06/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 06/06/1944. Dep: 01/07/1944.
Work undertaken:
Boiler number 2439 (Diagram 50)
   
07/12/1945 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 07/12/1945. Dep: 22/12/1945.    
15/09/1946 Renumbered Renumbered to 3393    
19/12/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 19/12/1946. Dep: 20/02/1947.
Work undertaken:
Boiler number 2976 (Diagram 50A)
   
29/03/1947 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 29/03/1947. Dep: 12/04/1947.    
02/08/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 02/08/1948. Dep: 10/08/1948.
Work undertaken:
Renumbered to BR 63393
   
27/09/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 27/09/1949. Dep: 15/10/1949.
Work undertaken:
Boiler number 24230 (Diagram 50)
   
17/10/1949 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 17/10/1949. Dep: 21/10/1949.    
04/06/1950 Allocation Reallocated to Middlesbrough (51D)    
30/06/1950 Allocation Reallocated to Middlesbrough (51D)    
09/04/1952 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 09/04/1952. Dep: 03/05/1952.    
05/05/1952 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 05/05/1952. Dep: 10/05/1952.    
27/07/1954 Works Visit Works Visit - Gateshead Works (Heavy Casual) - Arr: 27/07/1954. Dep: 08/09/1954.    
08/08/1955 Works Visit Works Visit - Gateshead Works (General) - Arr: 08/08/1955. Dep: 30/09/1955.
Work undertaken:
Boiler number 24174 (Diagram 50A)
   
22/04/1958 Works Visit Works Visit - Gateshead Works (General) - Arr: 22/04/1958. Dep: 30/05/1958.
Work undertaken:
Boiler number 24211 (Diagram 50A)
   
01/06/1958 Allocation Reallocated to Thornaby (51L)    
17/02/1959 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 17/02/1959. Dep: 23/02/1959.    
28/08/1959 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 28/08/1959. Dep: 02/10/1959.    
27/11/1961 Works Visit Works Visit - Darlington Works (General) - Arr: 27/11/1961. Dep: 05/01/1962.
Work undertaken:
Boiler number 24324 (Diagram 50A)
   
23/01/1962 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 23/01/1962. Dep: 06/02/1962.    
02/12/1962 Allocation Reallocated to Tyne Dock (52H)    
17/06/1964 Withdrawn Condemned as 63393 from Tyne Dock (52H)    

prev prev