Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 3645 Today
» 4463 Yesterday
» 29527 Week
» 52498 Month
» 398922 Year
» 3425775 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1946) 516 on 02/11/1946
British Railways 60516   08/10/1948

Names Carried
Date From Name
02/11/1946 HYCILLA

Liveries Carried
Colour Lining Date From
BR Green Orange and Black 07/06/1950

Locomotive Specifics
Designer E. Thompson
Class A2
Company History LNER
Wheels 4-6-2
Builder Doncaster Works
Order Number 378
Works Number 2007
To Service Mon 02/11/1946 to Heaton (HTN)
Withdrawal Mon 12/11/1962 off York (North) (50A)
Service Life 16 yrs , 10 dys

Disposal
Scrapping Locomotive Works (Doncaster)

Notes
Notes Into Doncaster Works for cutting up 1/4/63

Allocations
Code Subsequent Codes Name From Date
HTN   Heaton (New) on 02/11/1946
52A   Gateshead on 06/07/1952
52B   Heaton on 22/05/1960
50A   York (North) on 12/06/1960
     Withdrawn on 12/11/1962

SLS Allocations*
Type Code Name From Date
NEW HTN Heaton on 02/11/1946
ALLOC 52A Gateshead 4w/e 12/07/1952
ALLOC 52B Heaton 4w/e 11/06/1960
ALLOC 50A York (North) 3w/e 02/07/1960
WDN   on 12/11/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
02/11/1946 Diagram 117 boiler fitted (number 3720)
12/11/1953 Diagram 117 boiler fitted (number 29784)
18/02/1955 Diagram 117 boiler fitted (number 29783)
21/07/1956 Diagram 117 boiler fitted (number 29781)
21/02/1958 Diagram 117 boiler fitted (number 29789)
06/08/1959 Diagram 117 boiler fitted (number 29783)
09/02/1961 Diagram 118 boiler fitted (number 29841)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 30/10/1947 02/12/1947 34 days Heavy    
Doncaster Works 19/08/1948 08/10/1948 51 days General Renumbered to BR 60516
 
Doncaster Works 31/01/1950 07/06/1950 128 days General Painted Green with orange and black lining.
 
Doncaster Works 02/01/1952 29/01/1952 28 days Heavy Intermediate    
Doncaster Works 26/01/1953 12/02/1953 18 days Light Casual    
Doncaster Works 13/10/1953 12/11/1953 31 days General Boiler number 29784 (Diagram 117)
 
Doncaster Works 18/01/1955 18/02/1955 32 days General Boiler number 29783 (Diagram 117)
 
Doncaster Works 06/06/1956 21/07/1956 46 days General Boiler number 29781 (Diagram 117)
 
Gateshead Works 16/09/1957 27/09/1957 12 days Light Casual    
Doncaster Works 21/01/1958 21/02/1958 32 days General Boiler number 29789 (Diagram 117)
 
Doncaster Works 29/06/1959 06/08/1959 39 days General Boiler number 29783 (Diagram 117)
 
Doncaster Works 11/08/1959 13/08/1959 3 days Unclassified    
Doncaster Works 03/01/1961 09/02/1961 38 days General Boiler number 10598 (Diagram 118)
 
Doncaster Works 20/02/1961 01/03/1961 10 days Light Casual    

Mentions ...
Report Date Title Report Source
30/06/1947 General The 'Pacifics' of Thompson's design, Nos. 500 and 511-520, which were formerly designated 'A.2' Class, were towards the end of April re-classified 'A.2/3': this series will end with No. 524. The Doncaster No. of 520 Owen Tudor is 2010, and of 521 (completed early in May) 2011. As No. 500 carries works No. 2000, and 3167 is presumably Doncaster No. 2001, Nos. 511-520 were expected to appear as Nos. 2002-2011; No. 515 Sun Stream is 2006/1946. SLS/194708
01/10/1948 Doncaster Works Locomotives under repair here on 1/10 included Nos. 8, 37, 87, 98, 516/19, 1092, 1107/09/12/24, 60007/18/19/20/60, 60635 an 61120. SLS/194811
08/10/1948 Doncaster Works Locomotives noted ready to leave Works were Nos. 60007, painted garter blue; 60516, green; 61120, black and lined, while 60877, 60961, 61804 an 63479 were plain black. Locomotives awaiting Works included:-Nos. 48, 1121 an 1902 while those under heavy repair included Nos. 8, 18, 19. 37, 78, 98, 513/19, 932/62, 1092, 1107/24, 1869, 2116, 7350 an 9999. Condemned locomotives on the dump were:-Nos. 2126/98 an 4107. Withdrawn 'C.1' Class Nos. 3274 an 3285, fitted with tall chimneys, extra- coal space, etc., were noted supplying steam to the Crimpsall Erecting Shop; it also appeared that Nos. 2821 (3293) and 4419 might also be similarly fitted and soon put to a similar use where required. It is understood that sixteen of the new 'A.1's' are to be built at Doncaster and twenty-three at Darlington. SLS/194812

Summary
Date Event Details Source See Also
02/11/1946 To Service To service as London and North Eastern Railway Number 516, name: HYCILLA
Built at Doncaster Works, Works Number 2007
Allocated to Heaton (HTN)
Diagram 117 boiler fitted
   
30/10/1947 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 30/10/1947. Dep: 02/12/1947.    
19/08/1948 Works Visit Works Visit - Doncaster Works (General) - Arr: 19/08/1948. Dep: 08/10/1948.
Work undertaken:
Renumbered to BR 60516
   
31/01/1950 Works Visit Works Visit - Doncaster Works (General) - Arr: 31/01/1950. Dep: 07/06/1950.
Work undertaken:
Painted Green with orange and black lining.
   
07/06/1950 Livery Change of livery to Green with orange and black lining.    
02/01/1952 Works Visit Works Visit - Doncaster Works (Heavy Intermediate) - Arr: 02/01/1952. Dep: 29/01/1952.    
06/07/1952 Allocation Reallocated to Gateshead (52A)    
26/01/1953 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 26/01/1953. Dep: 12/02/1953.    
13/10/1953 Works Visit Works Visit - Doncaster Works (General) - Arr: 13/10/1953. Dep: 12/11/1953.
Work undertaken:
Boiler number 29784 (Diagram 117)
   
18/01/1955 Works Visit Works Visit - Doncaster Works (General) - Arr: 18/01/1955. Dep: 18/02/1955.
Work undertaken:
Boiler number 29783 (Diagram 117)
   
06/06/1956 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/06/1956. Dep: 21/07/1956.
Work undertaken:
Boiler number 29781 (Diagram 117)
   
16/09/1957 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 16/09/1957. Dep: 27/09/1957.    
21/01/1958 Works Visit Works Visit - Doncaster Works (General) - Arr: 21/01/1958. Dep: 21/02/1958.
Work undertaken:
Boiler number 29789 (Diagram 117)
   
29/06/1959 Works Visit Works Visit - Doncaster Works (General) - Arr: 29/06/1959. Dep: 06/08/1959.
Work undertaken:
Boiler number 29783 (Diagram 117)
   
11/08/1959 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 11/08/1959. Dep: 13/08/1959.    
22/05/1960 Allocation Reallocated to Heaton (52B)    
12/06/1960 Allocation Reallocated to York (North) (50A)    
03/01/1961 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/01/1961. Dep: 09/02/1961.
Work undertaken:
Boiler number 10598 (Diagram 118)
   
20/02/1961 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 20/02/1961. Dep: 01/03/1961.    
12/11/1962 Withdrawn Condemned as 60516 from York (North) (50A)    

prev prev