Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 13 Online
» 3646 Today
» 4163 Yesterday
» 17052 Week
» 70068 Month
» 189595 Year
» 3216448 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D5031 25/06/1959  
TOPS (Tops) 24031 02/1974  

Locomotive Specifics
Class as Built 24
Subclass/Rebuild History
ClassFrom
24/025/06/1959
Wheels Bo-Bo
Builder Crewe Works
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Multiple Fitting Blue Star
Other Details Disc Route Indicators
To Service 25/06/1959 to March (31B)
Withdrawn 04/10/1975
Time in Service 16 yrs, 3 mths , 9 dys
Cut Up 12/1976
Cut At Locomotive Works (Swindon)
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GNP Green all over with a narrow white band around the bottom of the bodywork 25/06/1959

Allocations - WIP
Code Subsequent Codes Name From Date
31B   March (New) on 25/06/1959
30A   Stratford w/e 08/08/1959
1A   Willesden w/e 28/01/1961
1C   Watford w/e 09/09/1961
1A   Willesden w/e 16/02/1963
D01   London Division on 18/04/1966
D02   Birmingham Division w/e 05/11/1966
D05   Stoke Division w/e 12/08/1967
     Stored 2w/e 12/07/1975
     Withdrawn on 04/10/1975

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
by 06/01/1970   Steam heat boiler isolated        
by 30/08/1970   Steam heat boiler isolated        
08/1971   Fitted with Modified Triple Valve (MTV) Brakes        

Configuration - WIP
Date Configuration Description Additional Diagram Source
25/06/1959 vb Vacuum brakes, Steam heat      
by 06/01/1970 vi Vacuum brakes, Isolated boiler      
by 30/08/1970 vi Vacuum brakes, Isolated boiler      
08/1971 vi Vacuum brakes, Isolated boiler Modified Triple Valve Brake    


Summary
Start Event Details Source See Also
25/06/1959 To Service To service as British Railways number D5031
Built at Crewe Works
Allocated to March (31B)
Livery applied: Green all over with a narrow white band around the bottom of the bodywork
   
08/08/1959 Allocation Reallocated to Stratford (30A)    
28/01/1961 Allocation Reallocated to Willesden (1A)    
09/09/1961 Allocation Reallocated to Watford (1C)    
16/02/1963 Allocation Reallocated to Willesden (1A)    
18/04/1966 Allocation Reallocated to London Division (D01)    
05/11/1966 Allocation Reallocated to Birmingham Division (D02)    
12/08/1967 Allocation Reallocated to Stoke Division (D05)    
06/01/1970 Modification Modification: Steam heat boiler isolated    
30/08/1970 Modification Modification: Steam heat boiler isolated    
08/1971 Modification Modification: Fitted with Modified Triple Valve (MTV) Brakes    
02/1974 Renumbered Renumbered to 24031    
12/07/1975 To Store To Store    
04/10/1975 Withdrawn Condemned as 24031    
12/1976 Scrapped Broken up by Locomotive Works: Swindon    

prev prev