Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 16 Online
» 3042 Today
» 4163 Yesterday
» 16448 Week
» 69464 Month
» 188991 Year
» 3215844 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 3659 on 22/10/1941
London and North Eastern Railway (1946 1st) 832 on Not applied
London and North Eastern Railway (1946 2nd) 932   22/12/1946
British Railways 60932   16/10/1948

Locomotive Specifics
Designer N. Gresley
Class V2
Company History LNER
Wheels 2-6-2
Builder Doncaster Works
Works Number 1891
To Service Mon 22/10/1941 to Gateshead (GHD)
Withdrawal Mon 25/05/1964 off York (North) (50A)
Service Life 22 yrs, 7 mths , 3 dys

Disposal
Scrapping During 08/1964 at Locomotive Works (Swindon)

Notes
Notes Sent to Swindon Works for cutting up 8/64

Allocations
Code Subsequent Codes Name From Date
GHD   Gateshead (New) on 22/10/1941
TWD   Tweedmouth on 03/11/1945
52B   Heaton on 08/06/1958
50A   York (North) on 02/12/1962
     Withdrawn on 25/05/1964

SLS Allocations*
Type Code Name From Date
ALLOC 52B Heaton 4w/e 14/06/1958
ALLOC 50A York (North) w/e 08/12/1962
WDN   on 25/05/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
22/10/1941 Diagram 109 boiler fitted (number 9231)
24/06/1943 Diagram 109 boiler fitted (number 3084)
16/10/1948 Diagram 109 boiler fitted (number 2915)
16/02/1952 Diagram 109 boiler fitted (number 29523)
29/07/1954 Diagram 109 boiler fitted (number 29541)
06/06/1958 Mechanical elements of ATC fitted
17/09/1958 Separate cylinders fitted (monobloc replaced)
17/09/1958 Diagram 109 boiler fitted (number 29486)
02/03/1959 Electrical elements of ATC fitted
02/03/1961 Smith speedometer fitted
02/03/1961 Diagram 109 boiler fitted (number 29342)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 26/08/1942 29/08/1942 4 days Light Repair    
Darlington Works 12/05/1943 24/06/1943 44 days General Boiler number 3084 (Diagram 109)
 
Doncaster Works 23/06/1945 11/08/1945 50 days Heavy    
Doncaster Works 08/09/1948 16/10/1948 39 days General Boiler number 2915 (Diagram 109)
Renumbered to BR 60932
 
Darlington Works 18/01/1952 16/02/1952 30 days General Boiler number 29523 (Diagram 109)
 
Darlington Works 29/02/1952 07/03/1952 8 days Unclassified    
Darlington Works 01/07/1954 29/07/1954 29 days General Boiler number 29541 (Diagram 109)
 
Darlington Works 03/08/1954 09/08/1954 7 days Unclassified    
Darlington Works 30/08/1954 04/09/1954 6 days Unclassified    
Darlington Works 28/01/1957 01/03/1957 33 days Heavy Intermediate    
Darlington Works 04/03/1957 05/03/1957 2 days Unclassified    
Darlington Works 02/06/1958 06/06/1958 5 days Unclassified Mechanical elements of ATC fitted
 
Darlington Works 06/08/1958 17/09/1958 43 days General Boiler number 29486 (Diagram 109)
Separate cylinders fitted (monobloc replaced)
 
Darlington Works 25/09/1958 06/10/1958 12 days Unclassified    
Darlington Works 26/02/1959 02/03/1959 5 days Unclassified Electrical elements of ATC fitted
 
Darlington Works 20/10/1959 18/11/1959 30 days Unclassified    
Darlington Works 23/01/1961 02/03/1961 39 days General Boiler number 29342 (Diagram 109)
Smith speedometer fitted
 

Mentions ...
Report Date Title Report Source
08/10/1948 Doncaster Works Locomotives noted ready to leave Works were Nos. 60007, painted garter blue; 60516, green; 61120, black and lined, while 60877, 60961, 61804 an 63479 were plain black. Locomotives awaiting Works included:-Nos. 48, 1121 an 1902 while those under heavy repair included Nos. 8, 18, 19. 37, 78, 98, 513/19, 932/62, 1092, 1107/24, 1869, 2116, 7350 an 9999. Condemned locomotives on the dump were:-Nos. 2126/98 an 4107. Withdrawn 'C.1' Class Nos. 3274 an 3285, fitted with tall chimneys, extra- coal space, etc., were noted supplying steam to the Crimpsall Erecting Shop; it also appeared that Nos. 2821 (3293) and 4419 might also be similarly fitted and soon put to a similar use where required. It is understood that sixteen of the new 'A.1's' are to be built at Doncaster and twenty-three at Darlington. SLS/194812
20/09/1964 Swindon Works (Scrap yard) On the occasion of the Society farewell to the last G.W.R. County class tour, the following were on works:- Erecting Shop: D602, D806/19/37/43/9, D1001/6/9/14/15/28/32/43/58, D6335/57, D7009/73, 2210, 6862, 6951, 7803, 7924, 43001/137, 73034 an 92223. New Construction: D9512 complete and painted, D9513-6 almost complete, D9517-24 under construction. Top end of shop, PWM653, D3026/32/190/807/14/24. Weighing shed: D850, D1049, Outside in works yard: 4659, 8405/9, 8732, 9425/27, 42954/78, 43115/20, 60941/45, D1016/24, D6352, D7048, N.C.B. 0-6-2T (ex T.V.R.) and King 6000 (for movement to Stratford). Scrap yard: 2818, 5698, 6010, 6824/7/73, 7929, 8418, 9484, 60809/12/33/6/87, 60916/22/5/32/64/75, 43012/112. Stock shed: D3352, D6826, D9510/11. SLS/196410
11/10/1964 Swindon Works (C shop area) Erecting shop: D602, D806/15/7/32/7/43/9, D1006/16/24/32/58/60/72, D3025/32/190/807/20/966, D6335/52/6, D7017/46/63, 2210, 6823/7, 6951, 7924/9, 42945/75, 43001/112/20/37, 73034, 92223, D9515/6 Painted, D9517-20 Cabs, D9521-7 Motors, D9528/9 Frames; PWM653; C shop area: NCB 67 (ex-TVR) and 6000 still awaiting movement to Stratford; 2818, 3748, 4626, 5264, 5602, 6010, 6824/73, 8401/18, 9484, 9752, 43003, 60809/12/56/87/916/22/32/41/5, 78009; Outside Erecting shop: 7803, 43012; Turntable area: D830/60, D1010/20, D3437, D7022/7/64, 4659, 8405/9, 9425, 9454, 42954; Stored Stock shed: 1010/2/4, 3702, 4569, 4916, 5963/75, 6804, 73012 SLS/196411

Summary
Date Event Details Source See Also
22/10/1941 To Service To service as London and North Eastern Railway Number 3659
Built at Doncaster Works, Works Number 1891
Allocated to Gateshead (GHD)
Diagram 109 boiler fitted
   
26/08/1942 Works Visit Works Visit - Doncaster Works (Light Repair) - Arr: 26/08/1942. Dep: 29/08/1942.    
12/05/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 12/05/1943. Dep: 24/06/1943.
Work undertaken:
Boiler number 3084 (Diagram 109)
   
23/06/1945 Works Visit Works Visit - Doncaster Works (Heavy) - Arr: 23/06/1945. Dep: 11/08/1945.    
03/11/1945 Allocation Reallocated to Tweedmouth (TWD)    
1946 Number Allocated Allocated number 832 but not taken up    
22/12/1946 Renumbered Renumbered to 932    
08/09/1948 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/09/1948. Dep: 16/10/1948.
Work undertaken:
Boiler number 2915 (Diagram 109)
Renumbered to BR 60932
   
18/01/1952 Works Visit Works Visit - Darlington Works (General) - Arr: 18/01/1952. Dep: 16/02/1952.
Work undertaken:
Boiler number 29523 (Diagram 109)
   
29/02/1952 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 29/02/1952. Dep: 07/03/1952.    
01/07/1954 Works Visit Works Visit - Darlington Works (General) - Arr: 01/07/1954. Dep: 29/07/1954.
Work undertaken:
Boiler number 29541 (Diagram 109)
   
03/08/1954 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 03/08/1954. Dep: 09/08/1954.    
30/08/1954 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 30/08/1954. Dep: 04/09/1954.    
28/01/1957 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 28/01/1957. Dep: 01/03/1957.    
04/03/1957 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 04/03/1957. Dep: 05/03/1957.    
02/06/1958 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 02/06/1958. Dep: 06/06/1958.
Work undertaken:
Mechanical elements of ATC fitted
   
08/06/1958 Allocation Reallocated to Heaton (52B)    
06/08/1958 Works Visit Works Visit - Darlington Works (General) - Arr: 06/08/1958. Dep: 17/09/1958.
Work undertaken:
Boiler number 29486 (Diagram 109)
Separate cylinders fitted (monobloc replaced)
   
25/09/1958 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 25/09/1958. Dep: 06/10/1958.    
26/02/1959 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 26/02/1959. Dep: 02/03/1959.
Work undertaken:
Electrical elements of ATC fitted
   
20/10/1959 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 20/10/1959. Dep: 18/11/1959.    
23/01/1961 Works Visit Works Visit - Darlington Works (General) - Arr: 23/01/1961. Dep: 02/03/1961.
Work undertaken:
Boiler number 29342 (Diagram 109)
Smith speedometer fitted
   
02/12/1962 Allocation Reallocated to York (North) (50A)    
25/05/1964 Withdrawn Condemned as 60932 from York (North) (50A)    
08/1964 Scrapped Broken up by Locomotive Works: Swindon    

prev prev