Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 29 Online
» 3393 Today
» 4163 Yesterday
» 16799 Week
» 69815 Month
» 189342 Year
» 3216195 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 1284 m/e 06/1913
London and North Eastern Railway (1946) 3358   12/05/1946
British Railways 63358 w/e 06/11/1948

Locomotive Specifics
Designer V. Raven
Class Q6
Company History NER/LNER
Rebuild History
ClassFrom
Q606/1913
Wheels 0-8-0
Builder Darlington Works
Order Number 441A
Fittings (as built)
Engine Brakes Steam
To Service During 06/1913 to Tyne Dock (TDK)
Withdrawal Mon 09/03/1964 off Tyne Dock (52H)
Service Life 50 yrs, 9 mths , 7 dys

Disposal

Notes
Notes Into Darlington for cutting up 16/3/64

Allocations
Code Subsequent Codes Name From Date
TDK   Tyne Dock (New) m/e 06/1913
AFP   Annfield Plain on 08/03/1924
TDK   Tyne Dock on 14/10/1929
EHL   East Hartlepool on 18/06/1931
WHL   West Hartlepool on 17/04/1939
HLS   Hull Springhead on 10/05/1940
NEV   Neville Hill on 28/03/1943
DAR   Darlington on 10/07/1943
NPT   Newport (Teeside) on 20/09/1944
HLD   Hull Dairycoates on 04/09/1949
HLD   Hull Dairycoates w/e 10/09/1949
BOR   Borough Gardens on 11/12/1949
BOR   Borough Gardens w/e 17/12/1949
52H   Tyne Dock on 14/06/1959
     Withdrawn on 09/03/1964

SLS Allocations*
Type Code Name From Date
ALLOC HLD Hull Dairycoates w/e 10/09/1949
ALLOC BOR Borough Gardens w/e 17/12/1949
ALLOC 54B Tyne Dock on 14/06/1959
WDN   w/e 09/03/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/1913 Diagram 50 boiler fitted (number D208)
10/12/1929 Diagram 50 boiler fitted (number E4/41)
19/08/1938 Diagram 50 boiler fitted (number 2393)
12/06/1941 Diagram 50 boiler fitted (number 2440)
03/09/1943 Diagram 50 boiler fitted (number D1568)
05/11/1948 Diagram 50 boiler fitted (number 2429)
27/10/1951 Diagram 50A boiler fitted (number 24207)
30/08/1957 Diagram 50A boiler fitted (number 24289)
23/06/1961 Diagram 50A boiler fitted (number 24330)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 14/05/1924 19/08/1924 98 days General    
Gateshead Works 28/12/1927 21/01/1928 25 days Light Repair    
Gateshead Works 10/08/1928 20/09/1928 42 days Light Repair    
Gateshead Works 19/08/1929 10/12/1929 114 days General Boiler number E4/41 (Diagram 50)
 
Gateshead Works 18/06/1931 23/06/1931 6 days Unclassified    
Darlington Works 24/01/1933 27/02/1933 35 days General Boiler number 4 (Diagram 50)
 
Darlington Works 09/09/1935 04/11/1935 57 days Heavy    
Darlington Works 26/05/1938 19/08/1938 86 days General Boiler number 2393 (Diagram 50)
 
Darlington Works 21/02/1940 08/03/1940 17 days Light Repair    
Darlington Works 09/05/1941 12/06/1941 35 days General Boiler number 2440 (Diagram 50)
 
Darlington Works 22/06/1943 03/09/1943 74 days General Boiler number D1568 (Diagram 50)
 
Darlington Works 13/07/1946 24/08/1946 43 days General Boiler number 24196 (Diagram 50)
 
Darlington Works 19/10/1948 05/11/1948 18 days General Boiler number 2429 (Diagram 50)
Renumbered to BR 63358
 
Darlington Works 04/10/1951 27/10/1951 24 days General Boiler number 24207 (Diagram 50A)
 
Gateshead Works 08/11/1951 14/11/1951 7 days Light Casual    
Darlington Works 04/05/1953 06/06/1953 34 days Light Casual    
Darlington Works 08/06/1953 10/06/1953 3 days Unclassified    
Darlington Works 05/11/1954 02/12/1954 28 days Heavy Intermediate    
Darlington Works 27/03/1956 23/04/1956 28 days Light Casual After collision
 
Darlington Works 02/08/1957 30/08/1957 29 days General Boiler number 24289 (Diagram 50A)
 
Darlington Works 13/03/1961 23/06/1961 103 days General Boiler number 24330 (Diagram 50A)
 

Mentions ...
Report Date Title Report Source
02/12/1948 Darlington Works Further new Class 'A.1' locomotives, Nos. 60134-37, ex North Road bear Works, Nos. 2053-56, in order. Locomotives awaiting Works: Nos. 970, 1642/44/72, 2344/65/90, 2715, E2718, 3292, E3311, E3314, 3399, 3420, 5100, 5856, 7283, 7636/69, 8015, 8275, 8313, 8698, 8745, 9792, 9842/89, 60942, 62737/64, 63290, 67672, 67719/23 (both light repairs), 69784. The following were sent to the scrap yard:-Nos. 3253/92/95, 3323/27, 8090 an 9103.
Locomotives ex Works: Nos. 60507 (unlined black, new chimney), 61019, 61627/38, 62371/91, 62708/47, 63140, 63344/58, 65706/17, 65803/14/32/52/83/89, 67300, 67311 (auto fitted), 67312, 67688, 68014 (altered bunker), 68245/95, 68426, 68678 (vacuum ejector), 68699, 69776, 69841/81/91, 69862 (first 'A.8' to be lined out), 69881/91, 'Austerity' 77050, 77195/99, 77329.
SLS/194901
04/06/1961 Darlington Works (Works Yard) Erecting Shop: D272, D2243, D2700, D3456, D4071-5, D5098, D5157-61, 43085, 60816/23/57/8/97, 60900, 61028, 61206/69, 61303, 63468, 67620/91. 67733, 80100, 90124, 90465/70, 90518. Stripping Shop: 60974, 65868. 67636, 80099. Outside Stripping Shop: 43116, 61464, 63382, 63466. Works Yard: D4070, D5101, 60852/69/99, 60920/75/81, 61238, 63341/58, 63452, 65099, 65753, 65801, 67643/90, 68007/43/80, 92060, 92192. Crossing: D280, D3322, D5106/56. Scrap Yard: 61416/62, 68673 all intact. SLS/196107

Summary
Date Event Details Source See Also
06/1913 To Service To service as North Eastern Railway Number 1284
Built at Darlington Works, Works Number
Allocated to Tyne Dock (TDK)
Diagram 50 boiler fitted
   
08/03/1924 Allocation Reallocated to Annfield Plain (AFP)    
14/05/1924 Works Visit Works Visit - Gateshead Works (General) - Arr: 14/05/1924. Dep: 19/08/1924.    
28/12/1927 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 28/12/1927. Dep: 21/01/1928.    
10/08/1928 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 10/08/1928. Dep: 20/09/1928.    
19/08/1929 Works Visit Works Visit - Gateshead Works (General) - Arr: 19/08/1929. Dep: 10/12/1929.
Work undertaken:
Boiler number E4/41 (Diagram 50)
   
14/10/1929 Allocation Reallocated to Tyne Dock (TDK)    
18/06/1931 Allocation Reallocated to East Hartlepool (EHL)    
18/06/1931 Works Visit Works Visit - Gateshead Works (Unclassified) - Arr: 18/06/1931. Dep: 23/06/1931.    
24/01/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 24/01/1933. Dep: 27/02/1933.
Work undertaken:
Boiler number 4 (Diagram 50)
   
09/09/1935 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 09/09/1935. Dep: 04/11/1935.    
26/05/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 26/05/1938. Dep: 19/08/1938.
Work undertaken:
Boiler number 2393 (Diagram 50)
   
17/04/1939 Allocation Reallocated to West Hartlepool (WHL)    
21/02/1940 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 21/02/1940. Dep: 08/03/1940.    
10/05/1940 Allocation Reallocated to Hull Springhead (HLS)    
09/05/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 09/05/1941. Dep: 12/06/1941.
Work undertaken:
Boiler number 2440 (Diagram 50)
   
28/03/1943 Allocation Reallocated to Neville Hill (NEV)    
22/06/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 22/06/1943. Dep: 03/09/1943.
Work undertaken:
Boiler number D1568 (Diagram 50)
   
10/07/1943 Allocation Reallocated to Darlington (DAR)    
20/09/1944 Allocation Reallocated to Newport (Teeside) (NPT)    
12/05/1946 Renumbered Renumbered to 3358    
13/07/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 13/07/1946. Dep: 24/08/1946.
Work undertaken:
Boiler number 24196 (Diagram 50)
   
19/10/1948 Works Visit Works Visit - Darlington Works (General) - Arr: 19/10/1948. Dep: 05/11/1948.
Work undertaken:
Boiler number 2429 (Diagram 50)
Renumbered to BR 63358
   
04/09/1949 Allocation Reallocated to Hull Dairycoates (HLD)    
10/09/1949 Allocation Reallocated to Hull Dairycoates (HLD)    
11/12/1949 Allocation Reallocated to Borough Gardens (BOR)    
17/12/1949 Allocation Reallocated to Borough Gardens (BOR)    
04/10/1951 Works Visit Works Visit - Darlington Works (General) - Arr: 04/10/1951. Dep: 27/10/1951.
Work undertaken:
Boiler number 24207 (Diagram 50A)
   
08/11/1951 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 08/11/1951. Dep: 14/11/1951.    
04/05/1953 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 04/05/1953. Dep: 06/06/1953.    
08/06/1953 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 08/06/1953. Dep: 10/06/1953.    
05/11/1954 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 05/11/1954. Dep: 02/12/1954.    
27/03/1956 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 27/03/1956. Dep: 23/04/1956.
Work undertaken:
After collision
   
02/08/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 02/08/1957. Dep: 30/08/1957.
Work undertaken:
Boiler number 24289 (Diagram 50A)
   
14/06/1959 Allocation Reallocated to Tyne Dock (52H)    
13/03/1961 Works Visit Works Visit - Darlington Works (General) - Arr: 13/03/1961. Dep: 23/06/1961.
Work undertaken:
Boiler number 24330 (Diagram 50A)
   
09/03/1964 Withdrawn Condemned as 63358 from Tyne Dock (52H)    

prev prev