Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 6 Online
» 341 Today
» 4397 Yesterday
» 18144 Week
» 71160 Month
» 190687 Year
» 3217540 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 770 m/e 09/1911
London and North Eastern Railway (1946) 3330   18/08/1946
British Railways 63330   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/109/1911
Wheels 0-8-0
Builder Darlington Works
Order Number 411A
Fittings (as built)
Engine Brakes Steam
To Service During 09/1911 to Blyth (North) (NBH)
Withdrawal Wed 28/12/1949 off Darlington (DAR)
Service Life 38 yrs, 3 mths , 27 dys
Information Slide valves

Disposal
Scrapping During 01/1950 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
NBH   Blyth (North) (New) m/e 09/1911
HAV   Haverton Hill on 23/04/1931
NPT   Newport (Teeside) on 25/01/1935
SKN   Stockton on 20/01/1947
DAR   Darlington on 02/11/1947
     Withdrawn on 28/12/1949

SLS Allocations*
Type Code Name From Date
ALLOC SKN Stockton on 20/01/1947
ALLOC DAR Darlington w/e 08/11/1947
WDN DAR Darlington on 28/12/1949

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
09/1911 Diagram 56 boiler fitted (number D15)
30/03/1928 Diagram 56 boiler fitted (number D2080)
13/02/1939 Diagram 56 boiler fitted (number D1441)
12/10/1943 Diagram 56 boiler fitted (number 2229)
12/04/1947 Diagram 56B boiler fitted (number 3116)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 06/07/1923 13/09/1923 70 days General    
Gateshead Works 12/05/1925 02/06/1925 22 days Light Repair    
Gateshead Works 09/11/1928 30/03/1928 -223 days General    
Darlington Works 01/11/1932 30/11/1932 30 days General    
Darlington Works 02/10/1935 28/11/1935 58 days General    
Darlington Works 10/01/1939 13/02/1939 35 days General Boiler number D1441 (Diagram 56)
 
Darlington Works 17/07/1941 29/08/1941 44 days General    
Darlington Works 02/11/1942 26/11/1942 25 days Unclassified    
Darlington Works 18/09/1943 12/10/1943 25 days General Boiler number 2229 (Diagram 56)
 
Darlington Works 04/07/1945 19/07/1945 16 days Light Repair    
Darlington Works 24/02/1947 12/04/1947 48 days General Boiler number 3116 (Diagram 56B)
 

Summary
Date Event Details Source See Also
09/1911 To Service To service as North Eastern Railway Number 770
Built at Darlington Works, Works Number
Allocated to Blyth (North) (NBH)
Diagram 56 boiler fitted
   
06/07/1923 Works Visit Works Visit - Gateshead Works (General) - Arr: 06/07/1923. Dep: 13/09/1923.    
12/05/1925 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 12/05/1925. Dep: 02/06/1925.    
30/03/1928 Modification Diagram 56 number D2080 boiler fitted    
09/11/1928 Works Visit Works Visit - Gateshead Works (General) - Arr: 09/11/1928. Dep: 30/03/1928.    
23/04/1931 Allocation Reallocated to Haverton Hill (HAV)    
01/11/1932 Works Visit Works Visit - Darlington Works (General) - Arr: 01/11/1932. Dep: 30/11/1932.    
25/01/1935 Allocation Reallocated to Newport (Teeside) (NPT)    
02/10/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 02/10/1935. Dep: 28/11/1935.    
10/01/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 10/01/1939. Dep: 13/02/1939.
Work undertaken:
Boiler number D1441 (Diagram 56)
   
17/07/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 17/07/1941. Dep: 29/08/1941.    
02/11/1942 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 02/11/1942. Dep: 26/11/1942.    
18/09/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 18/09/1943. Dep: 12/10/1943.
Work undertaken:
Boiler number 2229 (Diagram 56)
   
04/07/1945 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 04/07/1945. Dep: 19/07/1945.    
18/08/1946 Renumbered Renumbered to 3330    
20/01/1947 Allocation Reallocated to Stockton (SKN)    
24/02/1947 Works Visit Works Visit - Darlington Works (General) - Arr: 24/02/1947. Dep: 12/04/1947.
Work undertaken:
Boiler number 3116 (Diagram 56B)
   
02/11/1947 Allocation Reallocated to Darlington (DAR)    
1949 Number Allocated Allocated number 63330 but not taken up    
28/12/1949 Withdrawn Condemned as 3330 from Darlington (DAR)    
01/1950 Scrapped Broken up by Locomotive Works: Darlington    

prev prev