Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 4 Online
» 168 Today
» 4397 Yesterday
» 17971 Week
» 70987 Month
» 190514 Year
» 3217367 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 764 m/e 08/1911
London and North Eastern Railway (1946) 3327   01/09/1946
British Railways 63327   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/108/1911
Wheels 0-8-0
Builder Darlington Works
Order Number 411A
Fittings (as built)
Engine Brakes Steam
To Service During 08/1911 to Hull Springhead (HLS)
Withdrawal Mon 22/11/1948 off Newport (Teeside) (NPT)
Service Life 37 yrs, 3 mths , 22 dys
Information Slide valves

Disposal
Scrapping During 12/1948 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
HLS   Hull Springhead (New) m/e 08/1911
HLD   Hull Dairycoates on 31/05/1924
TDK   Tyne Dock on 15/04/1935
YK   York (North) on 10/02/1938
WHL   West Hartlepool on 28/03/1943
NPT   Newport (Teeside) on 07/09/1947
     Withdrawn on 22/11/1948

SLS Allocations*
Type Code Name From Date
ALLOC NPT Newport (Teeside) on 07/09/1947
WDN NPT Newport (Teeside) on 22/11/1948

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
08/1911 Diagram 56 boiler fitted (number D6)
07/02/1916 Diagram 56 boiler fitted (number D1916)
06/1922 Diagram 56 boiler fitted (number D1400)
14/02/1930 Diagram 56 boiler fitted (number D1007)
21/08/1934 Diagram 56 boiler fitted (number D1066)
07/11/1938 Diagram 56B boiler fitted (number 2800)
21/10/1941 Diagram 56 boiler fitted (number 2085)
18/03/1944 Diagram 56 boiler fitted (number D1769)
04/10/1946 Diagram 56B boiler fitted (number 3240)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1916 02/1916   General    
  1922 06/1922   General Boiler number D1400 (Diagram 56)
 
Darlington Works 21/03/1924 30/05/1924 71 days General    
Darlington Works 26/08/1924 11/09/1924 17 days Light Repair    
Darlington Works 16/02/1927 03/06/1927 108 days General    
Darlington Works 01/01/1930 14/02/1930 45 days General Boiler number D1007 (Diagram 56)
 
Darlington Works 18/06/1934 21/08/1934 65 days Heavy Boiler number D1066 (Diagram 56)
 
Darlington Works 28/01/1935 14/03/1935 46 days General    
Darlington Works 06/10/1938 07/11/1938 33 days General Boiler number 2800 (Diagram 56B)
 
Darlington Works 16/09/1939 26/09/1939 11 days Unclassified    
Darlington Works 08/09/1941 21/10/1941 44 days General Boiler number 2085 (Diagram 56)
 
Darlington Works 01/04/1943 14/04/1943 14 days Light Repair    
Darlington Works 13/09/1943 25/09/1943 13 days Unclassified    
Darlington Works 26/02/1944 18/03/1944 22 days General Boiler number D1769 (Diagram 56)
 
Gateshead Works 15/03/1945 30/03/1945 16 days Light Repair    
Darlington Works 06/09/1946 04/10/1946 29 days General Boiler number 3240 (Diagram 56B)
 
Darlington Works 22/10/1946 26/11/1946 36 days Unclassified    
Darlington Works 12/11/1948 12/11/1948 1 day No repairs    

Mentions ...
Report Date Title Report Source
02/12/1948 Darlington Works Further new Class 'A.1' locomotives, Nos. 60134-37, ex North Road bear Works, Nos. 2053-56, in order. Locomotives awaiting Works: Nos. 970, 1642/44/72, 2344/65/90, 2715, E2718, 3292, E3311, E3314, 3399, 3420, 5100, 5856, 7283, 7636/69, 8015, 8275, 8313, 8698, 8745, 9792, 9842/89, 60942, 62737/64, 63290, 67672, 67719/23 (both light repairs), 69784. The following were sent to the scrap yard:-Nos. 3253/92/95, 3323/27, 8090 an 9103.
Locomotives ex Works: Nos. 60507 (unlined black, new chimney), 61019, 61627/38, 62371/91, 62708/47, 63140, 63344/58, 65706/17, 65803/14/32/52/83/89, 67300, 67311 (auto fitted), 67312, 67688, 68014 (altered bunker), 68245/95, 68426, 68678 (vacuum ejector), 68699, 69776, 69841/81/91, 69862 (first 'A.8' to be lined out), 69881/91, 'Austerity' 77050, 77195/99, 77329.
SLS/194901
31/12/1948 Darlington Works Locomotives awaiting Works during December included:-Nos. 952, 1437, 1625/41, 2378, 2970 (the last 'C.7'), 3368, 5639, 5650 (badly damaged at Jervaulx), 5693, 5759/97, 5807, 7278, 7651, 8010/37, 8155, 8292, 9792, 9892, 60510, 62732/33, 65056, 67704/05/10/19/23, 69910/33, 'Austerity' 70877, 77414/69. Locomotives ex Works during December included:-Nos. 60918/42/70, 61432, 61601/29/30/51, 62344/65, 62728/31/54, 63352, 63423, 65033, 65856, 67283, 67342, 67636/39/87, 67701, 68016 (altered bunker), 68264/75, 68436, 68696, 68745, 69102, 69794, 69842/79/89, 'Austerity' 77329. Locomotives broken up: Nos. 2390 an 3327. The two Class 'V.2's' which have hitherto been used as main line pilots, have now been replaced by Class 'A.3' Nos. 70 an 76. SLS/194902

Summary
Date Event Details Source See Also
08/1911 To Service To service as North Eastern Railway Number 764
Built at Darlington Works, Works Number
Allocated to Hull Springhead (HLS)
Diagram 56 boiler fitted
   
07/02/1916 Modification Diagram 56 number D1916 boiler fitted    
21/03/1924 Works Visit Works Visit - Darlington Works (General) - Arr: 21/03/1924. Dep: 30/05/1924.    
31/05/1924 Allocation Reallocated to Hull Dairycoates (HLD)    
26/08/1924 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 26/08/1924. Dep: 11/09/1924.    
16/02/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 16/02/1927. Dep: 03/06/1927.    
01/01/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 01/01/1930. Dep: 14/02/1930.
Work undertaken:
Boiler number D1007 (Diagram 56)
   
18/06/1934 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 18/06/1934. Dep: 21/08/1934.
Work undertaken:
Boiler number D1066 (Diagram 56)
   
28/01/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 28/01/1935. Dep: 14/03/1935.    
15/04/1935 Allocation Reallocated to Tyne Dock (TDK)    
10/02/1938 Allocation Reallocated to York (North) (YK)    
06/10/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 06/10/1938. Dep: 07/11/1938.
Work undertaken:
Boiler number 2800 (Diagram 56B)
   
16/09/1939 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 16/09/1939. Dep: 26/09/1939.    
08/09/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 08/09/1941. Dep: 21/10/1941.
Work undertaken:
Boiler number 2085 (Diagram 56)
   
28/03/1943 Allocation Reallocated to West Hartlepool (WHL)    
01/04/1943 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 01/04/1943. Dep: 14/04/1943.    
13/09/1943 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 13/09/1943. Dep: 25/09/1943.    
26/02/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 26/02/1944. Dep: 18/03/1944.
Work undertaken:
Boiler number D1769 (Diagram 56)
   
15/03/1945 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 15/03/1945. Dep: 30/03/1945.    
01/09/1946 Renumbered Renumbered to 3327    
06/09/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 06/09/1946. Dep: 04/10/1946.
Work undertaken:
Boiler number 3240 (Diagram 56B)
   
22/10/1946 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 22/10/1946. Dep: 26/11/1946.    
07/09/1947 Allocation Reallocated to Newport (Teeside) (NPT)    
12/11/1948 Works Visit Works Visit - Darlington Works (No repairs) - Arr: 12/11/1948. Dep: 12/11/1948.    
22/11/1948 Withdrawn Condemned as 3327 from Newport (Teeside) (NPT)    
12/1948 Scrapped Broken up by Locomotive Works: Darlington    
1949 Number Allocated Allocated number 63327 but not taken up    

prev prev