Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 17 Online
» 2088 Today
» 4163 Yesterday
» 15494 Week
» 68510 Month
» 188037 Year
» 3214890 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 660 m/e 06/1907
London and North Eastern Railway (1946) 3301   12/01/1947
British Railways 63301   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/106/1907
Q5/2 (0-8-0)05/06/1934
Wheels 0-8-0
Builder Darlington Works
Order Number 351A
Works Number 517
Fittings (as built)
Engine Brakes Steam
To Service During 06/1907 to Stockton (SKN)
Withdrawal Fri 31/12/1948 off Haverton Hill (HAV)
Service Life 41 yrs , 7 mths
Information Slide valves

Disposal
Scrapping During 02/1949 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
SKN   Stockton (New) m/e 06/1907
HAV   Haverton Hill on 25/06/1930
     Withdrawn on 31/12/1948

SLS Allocations*
Type Code Name From Date
WDN HAV Haverton Hill on 27/12/1948

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/1907 Diagram 56 boiler fitted (number D1915)
08/1916 Diagram 56 boiler fitted (number G288)
07/1919 Diagram 56 boiler fitted (number D859)
30/05/1930 Diagram 56 boiler fitted (number D1392)
05/06/1934 Diagram 56A boiler fitted (number D1991)
29/01/1944 Diagram 56A boiler fitted (number D1661)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1916 08/1916   General Boiler number G288 (Diagram 56)
 
  1919 07/1919   General Boiler number D859 (Diagram 56)
 
  1922 08/1922   General    
Darlington Works 05/10/1925 06/01/1926 94 days General    
Gateshead Works 21/06/1928 27/08/1928 68 days General    
Darlington Works 17/06/1929 29/07/1929 43 days General    
Darlington Works 26/03/1930 30/05/1930 66 days General Boiler number D1392 (Diagram 56)
 
Darlington Works 09/05/1934 05/06/1934 28 days General Rebuilt to class Q5/2
Boiler number D1991 (Diagram 56A)
 
Darlington Works 30/08/1938 07/10/1938 39 days General    
Darlington Works 14/07/1941 30/08/1941 48 days General    
Darlington Works 06/01/1944 29/01/1944 24 days General Boiler number D1661 (Diagram 56A)
 
Darlington Works 19/11/1945 21/12/1945 33 days Light Repair After collision
 
Darlington Works 10/12/1946 01/02/1947 54 days General Renumbered to LNER (1946) number 3301
 
Gateshead Works 30/11/1948 30/11/1948 1 day No repairs    

Mentions ...
Report Date Title Report Source
28/02/1949 Darlington Works (To scrap yard) Locomotives awaiting Works during February included:-Nos. 1274, 1605/11/18/31/45, 2745/67, 3199, 3411, 5096, 5606/28, 5800, 7262, 8708, 9105, 60816, 60133, (adjustment), 61015 (damaged), 63140, 65057 (damaged in the Crook derailment), 65712, 67705/54, 69827 (NEA), Class '8' W.D. 77320 an 79239.To scrap yard: Nos. 3291/97/99, 3301/08/17/32, 63322 (badly damaged at Old Town Jct., Middlesboro').Locomotives ex Works during February included:-Nos. 60141, 60142 (Darlington 2061/1949-the first 1949 locomotive), 60143, 60509 (light repair), 60923, 60931 (light repair), 61022 (unlined black), 61161 (lined out), 61162 (unlined black), 61181/86, 61237/58, 61400, 61635/41, 61659 (light repair), 61660, 62353/59/78, 62718/32/64, 63341/49, 65098, 65601, 65633 (repaired at Gateshead-buffer beam snow plough fitted), 65712/49, 65827/60, 67255, 67386, 67623, 67714 (light repair), 68010/39, 68160, 68260, 69933, Class '8' W.D. 90252 (ex 77352), 90344 (ex 70877), 90613 (ex 77469). SLS/194904

Summary
Date Event Details Source See Also
06/1907 To Service To service as North Eastern Railway Number 660
Built at Darlington Works, Works Number 517
Allocated to Stockton (SKN)
Diagram 56 boiler fitted
   
05/10/1925 Works Visit Works Visit - Darlington Works (General) - Arr: 05/10/1925. Dep: 06/01/1926.    
21/06/1928 Works Visit Works Visit - Gateshead Works (General) - Arr: 21/06/1928. Dep: 27/08/1928.    
17/06/1929 Works Visit Works Visit - Darlington Works (General) - Arr: 17/06/1929. Dep: 29/07/1929.    
26/03/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 26/03/1930. Dep: 30/05/1930.
Work undertaken:
Boiler number D1392 (Diagram 56)
   
25/06/1930 Allocation Reallocated to Haverton Hill (HAV)    
09/05/1934 Works Visit Works Visit - Darlington Works (General) - Arr: 09/05/1934. Dep: 05/06/1934.
Work undertaken:
Rebuilt to class Q5/2
Boiler number D1991 (Diagram 56A)
   
30/08/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 30/08/1938. Dep: 07/10/1938.    
14/07/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 14/07/1941. Dep: 30/08/1941.    
06/01/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 06/01/1944. Dep: 29/01/1944.
Work undertaken:
Boiler number D1661 (Diagram 56A)
   
19/11/1945 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 19/11/1945. Dep: 21/12/1945.
Work undertaken:
After collision
   
10/12/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 10/12/1946. Dep: 01/02/1947.
Work undertaken:
Renumbered to LNER (1946) number 3301
   
30/11/1948 Works Visit Works Visit - Gateshead Works (No repairs) - Arr: 30/11/1948. Dep: 30/11/1948.    
31/12/1948 Withdrawn Condemned as 3301 from Haverton Hill (HAV)    
1949 Number Allocated Allocated number 63301 but not taken up    
02/1949 Scrapped Broken up by Locomotive Works: Darlington    

prev prev