Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 17 Online
» 960 Today
» 4163 Yesterday
» 14366 Week
» 67382 Month
» 186909 Year
» 3213762 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Northern Railway 274   04/1904
London and North Eastern Railway (1924) 3274   04/04/1925
London and North Eastern Railway (1946) 2803   Not applied

Locomotive Specifics
Designer H. Ivatt
Class C1
Company History GNR/LNER
Wheels 4-4-2
Builder Doncaster Works
Order Number 236
Works Number 1032
To Service During 04/1904
Withdrawal Thu 02/05/1946
Service Life 42 yrs, 1 mth , 1 dy

Disposal
Scrapping Locomotive Works (Doncaster)

Notes
Notes Carried out Stationery Boiler duties at Doncaster Loco works until finally cut up in March l952

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 04/1904
COP   Copley Hill (Leeds) on 20/09/1924
KX   Kings Cross on 06/10/1925
HIT   Hitchin (GNR) on 17/02/1939
     Withdrawn on 02/05/1946
NPT   Newport (Teeside) w/e 12/02/1949

SLS Allocations*
Type Code Name From Date
ALLOC NPT Newport (Teeside) w/e 12/02/1949
WDN 51B Newport (Teeside) on 19/09/1950

* Stephenson Locomotive Society data - raw and not yet cross-referenced

Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 1908 08/1908   General    
Doncaster Works 1912 10/1912   General    
Doncaster Works 1920 06/1920   General Superheated boiler fitted
 
Doncaster Works 05/03/1923 08/07/1923 126 days General    
Doncaster Works 07/01/1925 04/04/1925 88 days General Renumbered to LNER (1924) number 3274
 
Doncaster Works 06/12/1926 22/04/1927 138 days General    
Doncaster Works 02/11/1928 10/01/1929 70 days General    
Doncaster Works 01/02/1930 08/03/1930 36 days General    
Doncaster Works 19/09/1931 31/10/1931 43 days General    
Doncaster Works 02/12/1933 06/01/1934 36 days General    
Doncaster Works 29/02/1936 11/04/1936 43 days General    
Doncaster Works 11/06/1938 23/07/1938 43 days General    
Doncaster Works 16/03/1940 11/05/1940 57 days General    
Doncaster Works 26/06/1943 31/07/1943 36 days General    
Doncaster Works 14/04/1946 14/04/1946 1 day No repairs    

Mentions ...
Report Date Title Report Source
08/10/1948 Doncaster Works Locomotives noted ready to leave Works were Nos. 60007, painted garter blue; 60516, green; 61120, black and lined, while 60877, 60961, 61804 an 63479 were plain black. Locomotives awaiting Works included:-Nos. 48, 1121 an 1902 while those under heavy repair included Nos. 8, 18, 19. 37, 78, 98, 513/19, 932/62, 1092, 1107/24, 1869, 2116, 7350 an 9999. Condemned locomotives on the dump were:-Nos. 2126/98 an 4107. Withdrawn 'C.1' Class Nos. 3274 an 3285, fitted with tall chimneys, extra- coal space, etc., were noted supplying steam to the Crimpsall Erecting Shop; it also appeared that Nos. 2821 (3293) and 4419 might also be similarly fitted and soon put to a similar use where required. It is understood that sixteen of the new 'A.1's' are to be built at Doncaster and twenty-three at Darlington. SLS/194812

Summary
Date Event Details Source See Also
04/1904 To Service To service as Great Northern Railway Number 274
Built at Doncaster Works, Works Number 1032
   
1908 Works Visit Works Visit - Doncaster Works (General) - Arr: ?/1908. Dep: ?/08/1908.    
1912 Works Visit Works Visit - Doncaster Works (General) - Arr: ?/1912. Dep: ?/10/1912.    
1920 Works Visit Works Visit - Doncaster Works (General) - Arr: ?/1920. Dep: ?/06/1920.
Work undertaken:
Superheated boiler fitted
   
05/03/1923 Works Visit Works Visit - Doncaster Works (General) - Arr: 05/03/1923. Dep: 08/07/1923.    
20/09/1924 Allocation Reallocated to Copley Hill (Leeds) (COP)    
07/01/1925 Works Visit Works Visit - Doncaster Works (General) - Arr: 07/01/1925. Dep: 04/04/1925.
Work undertaken:
Renumbered to LNER (1924) number 3274
   
06/10/1925 Allocation Reallocated to Kings Cross (KX)    
06/12/1926 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/12/1926. Dep: 22/04/1927.    
02/11/1928 Works Visit Works Visit - Doncaster Works (General) - Arr: 02/11/1928. Dep: 10/01/1929.    
01/02/1930 Works Visit Works Visit - Doncaster Works (General) - Arr: 01/02/1930. Dep: 08/03/1930.    
19/09/1931 Works Visit Works Visit - Doncaster Works (General) - Arr: 19/09/1931. Dep: 31/10/1931.    
02/12/1933 Works Visit Works Visit - Doncaster Works (General) - Arr: 02/12/1933. Dep: 06/01/1934.    
29/02/1936 Works Visit Works Visit - Doncaster Works (General) - Arr: 29/02/1936. Dep: 11/04/1936.    
11/06/1938 Works Visit Works Visit - Doncaster Works (General) - Arr: 11/06/1938. Dep: 23/07/1938.    
17/02/1939 Allocation Reallocated to Hitchin (GNR) (HIT )    
16/03/1940 Works Visit Works Visit - Doncaster Works (General) - Arr: 16/03/1940. Dep: 11/05/1940.    
26/06/1943 Works Visit Works Visit - Doncaster Works (General) - Arr: 26/06/1943. Dep: 31/07/1943.    
1946 Number Allocated Allocated number 2803 but not taken up    
14/04/1946 Works Visit Works Visit - Doncaster Works (No repairs) - Arr: 14/04/1946. Dep: 14/04/1946.    
02/05/1946 Withdrawn Condemned as 3274    
12/02/1949 Allocation Reallocated to Newport (Teeside) (NPT)    

prev prev