Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 579 Today
» 4397 Yesterday
» 18382 Week
» 71398 Month
» 190925 Year
» 3217778 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev
Numbers Carried
Company Number Date From
British Railways 61409 on 15/06/1950

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 2111
Fittings (as built)
Engine Brakes Steam
To Service Sun 15/06/1950 to Immingham (40B)
Withdrawal Sun 22/09/1963 off Lincoln (40A)
Service Life 13 yrs, 3 mths , 7 dys

Disposal
Scrapping During 01/1964 at R A Kings (Norwich)

Notes
Notes Sold l/64 for scrap to R A King, Norwich

Allocations
Code Subsequent Codes Name From Date
40B   Immingham (New) on 15/06/1950
40A   Lincoln on 29/11/1959
     Withdrawn on 22/09/1963

SLS Allocations*
Type Code Name From Date
NEW 40B Immingham on 15/06/1950
ALLOC 40A Lincoln 4w/e 26/12/1959
WDN   on 22/09/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
15/06/1950 Diagram 100A boiler fitted (number 5142)
28/07/1951 Diagram 100A boiler fitted (number 28331)
24/09/1953 Diagram 100A boiler fitted (number 28750)
29/12/1954 Diagram 100A boiler fitted (number 28861)
09/02/1957 Diagram 100A boiler fitted (number 28141)
10/01/1959 Diagram 100A boiler fitted (number 28413)
18/01/1961 Diagram 100A boiler fitted (number 28515)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gorton Works 05/06/1951 28/07/1951 54 days General Boiler number 28331 (Diagram 100A)
 
Doncaster Works 25/07/1952 27/08/1952 34 days General    
Doncaster Works 13/08/1953 24/09/1953 43 days General Boiler number 28750 (Diagram 100A)
 
Doncaster Works 28/11/1954 29/12/1954 32 days General Boiler number 28861 (Diagram 100A)
 
Doncaster Works 01/03/1955 01/03/1955 1 day Weighing    
Doncaster Works 09/04/1955 20/04/1955 12 days Light Casual    
Doncaster Works 01/03/1956 22/03/1956 22 days Heavy Casual    
Doncaster Works 11/01/1957 09/02/1957 30 days General Boiler number 28141 (Diagram 100A)
 
Doncaster Works 13/02/1957 15/02/1957 3 days Unclassified    
Doncaster Works 04/12/1958 10/01/1959 38 days General Boiler number 28413 (Diagram 100A)
 
Doncaster Works 19/12/1960 18/01/1961 31 days General Boiler number 28515 (Diagram 100A)
 

Mentions ...
Report Date Title Report Source
04/01/1959 Doncaster Works (Erecting Shop) Erecting Shop-60162 (64B), 60003 (34A), 60035 (64B), 60017 (34A), 60145 (52A), 60103 (34A), 62030 (52C), 73000 (41B), 73155 (41C), 61122 (36A), 61971 (32A), 61889 (31B), 61820 (30F), 61890 (31B), 68987 (34B), 61162 (36A), 61846 (53A), 61409 (40B), 60001 (52A), 61158 (36A), 60526/502 (50A), 60039 (34A), 60152 (64B), 60026 (34A), 60520 (34F). Paint Shop-D3321 (52B), D3148 (51L), D5308 (34B), D6101/2 (34B), 60117 (56C), 61925 (36A), 60160 (64B), 62032 (31B). Yard-70030 (32A), 68914 (56B), 73016 (41C), 63940 (34F), D3079 (53A), 60508 (34E), 11182 (40A), 63975 (36A), 60063 (34F), 60095 (12C), 61816 (31B), 61406 (40B). Diesel Shop-E5001/2 motors in, D2050/1 motors in, 11106 (51C), 13147/51 (51L). Withdrawn-64216/7, 61606/48/22, 69493, 67397, 69544, 64201/74/6, 69551, 69593, 64205/49, 64183. SLS/195902
09/09/1963 Lincoln MPD The allocation of D1531/2/3/4 to Darnall has released Brush d/es D5801/2/3/53/4 for work at Lincoln and eventual elimination of steam but on 9th September the steam allocation was-43086/95/104/5/49, 61006/26/41/2/58/89/95/107/13/62/223/58/348/84/409, 90223/460/577. SLS/196310

Summary
Date Event Details Source See Also
15/06/1950 To Service To service as British Railways Number 61409
Built at Darlington Works, Works Number 2111
Allocated to Immingham (40B)
Diagram 100A boiler fitted
   
05/06/1951 Works Visit Works Visit - Gorton Works (General) - Arr: 05/06/1951. Dep: 28/07/1951.
Work undertaken:
Boiler number 28331 (Diagram 100A)
   
25/07/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 25/07/1952. Dep: 27/08/1952.    
13/08/1953 Works Visit Works Visit - Doncaster Works (General) - Arr: 13/08/1953. Dep: 24/09/1953.
Work undertaken:
Boiler number 28750 (Diagram 100A)
   
28/11/1954 Works Visit Works Visit - Doncaster Works (General) - Arr: 28/11/1954. Dep: 29/12/1954.
Work undertaken:
Boiler number 28861 (Diagram 100A)
   
01/03/1955 Works Visit Works Visit - Doncaster Works (Weighing) - Arr: 01/03/1955. Dep: 01/03/1955.    
09/04/1955 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 09/04/1955. Dep: 20/04/1955.    
01/03/1956 Works Visit Works Visit - Doncaster Works (Heavy Casual) - Arr: 01/03/1956. Dep: 22/03/1956.    
11/01/1957 Works Visit Works Visit - Doncaster Works (General) - Arr: 11/01/1957. Dep: 09/02/1957.
Work undertaken:
Boiler number 28141 (Diagram 100A)
   
13/02/1957 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 13/02/1957. Dep: 15/02/1957.    
04/12/1958 Works Visit Works Visit - Doncaster Works (General) - Arr: 04/12/1958. Dep: 10/01/1959.
Work undertaken:
Boiler number 28413 (Diagram 100A)
   
29/11/1959 Allocation Reallocated to Lincoln (40A)    
19/12/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 19/12/1960. Dep: 18/01/1961.
Work undertaken:
Boiler number 28515 (Diagram 100A)
   
22/09/1963 Withdrawn Condemned as 61409 from Lincoln (40A)    
01/1964 Scrapped Broken up by R A Kings: Norwich    

prev