Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 24 Online
» 1402 Today
» 4397 Yesterday
» 19205 Week
» 72221 Month
» 191748 Year
» 3218601 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1943) 8302 on 12/06/1943
London and North Eastern Railway (1946) 1001 on 27/01/1946
British Railways 61001   10/04/1948

Names Carried
Date From Name
12/06/1943 ELAND

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 1912
Fittings (as built)
Engine Brakes Steam
To Service Sun 12/06/1943 to Darlington (DAR)
Withdrawal Sun 22/09/1963 off Doncaster (36A)
Service Life 20 yrs, 3 mths , 10 dys

Disposal
Scrapping During 10/1963 at Locomotive Works (Doncaster)

Notes
Notes Into Doncaster Works for cutting up 31/10/63

Allocations
Code Subsequent Codes Name From Date
DAR   Darlington (New) on 12/06/1943
STR   Stratford on 30/06/1943
NOR   Norwich Thorpe on 10/07/1943
IPS   Ipswich on 25/06/1944
PKS   Parkeston Quay on 11/01/1945
IPS   Ipswich on 28/02/1945
STR   Stratford on 24/07/1946
PKS   Parkeston Quay on 07/12/1946
STR   Stratford on 01/02/1948
STR   Stratford w/e 07/02/1948
32B   Ipswich on 26/03/1950
32B   Ipswich w/e 01/04/1950
30A   Stratford on 30/04/1950
34E   Neasden on 22/06/1952
34E   Neasden 4w/e 12/07/1952
35C   Spital Bridge on 20/01/1957
32B   Ipswich on 03/03/1957
32A   Norwich Thorpe on 27/09/1959
36A   Doncaster on 29/11/1959
     Withdrawn on 22/09/1963

SLS Allocations*
Type Code Name From Date
ALLOC PKS Parkeston Quay on 07/12/1946
ALLOC STR Stratford w/e 07/02/1948
ALLOC 32B Ipswich w/e 01/04/1950
ALLOC 30A Stratford m/e 30/04/1950
ALLOC 34E Neasden 4w/e 12/07/1952
ALLOC 35C Spital Bridge 4w/e 26/01/1957
ALLOC 32B Ipswich 4w/e 23/03/1957
ALLOC 32A Norwich Thorpe 4w/e 03/10/1959
ALLOC 36A Doncaster 4w/e 26/12/1959
WDN   on 22/09/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
12/06/1943 Diagram 100A boiler fitted (number 9426)
07/06/1945 Diagram 100A boiler fitted (number 9431)
09/11/1946 Diagram 100A boiler fitted (number 9426)
22/01/1949 Diagram 100A boiler fitted (number 9693)
03/02/1951 Diagram 100A boiler fitted (number 28529)
05/03/1953 Diagram 100A boiler fitted (number 28857)
08/10/1954 Diagram 100A boiler fitted (number 28427)
29/12/1956 Diagram 100A boiler fitted (number 28276)
23/07/1960 Diagram 100A boiler fitted (number 28192)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Stratford Works 24/01/1944 12/02/1944 20 days Unclassified    
Darlington Works 22/03/1945 07/06/1945 78 days General Boiler number 9431 (Diagram 100A)
 
Stratford Works 15/11/1945 24/11/1945 10 days Light Repair    
Stratford Works 23/09/1946 09/11/1946 48 days General Boiler number 9426 (Diagram 100A)
 
Stratford Works 09/05/1947 14/05/1947 6 days Light Repair    
Stratford Works 29/11/1948 22/01/1949 55 days General Boiler number 9693 (Diagram 100A)
 
Stratford Works 10/01/1950 18/01/1950 9 days Unclassified    
Stratford Works 18/12/1950 03/02/1951 48 days General Boiler number 28529 (Diagram 100A)
 
Stratford Works 13/03/1951 14/03/1951 2 days Light Casual    
Stratford Works 01/01/1952 12/01/1952 12 days Light Casual    
Stratford Works 24/06/1952 26/06/1952 3 days Unclassified    
Doncaster Works 03/02/1953 05/03/1953 31 days General Boiler number 28857 (Diagram 100A)
 
Stratford Works 23/08/1954 08/10/1954 47 days General Boiler number 28427 (Diagram 100A)
 
Doncaster Works 06/01/1956 30/01/1956 25 days Heavy Casual    
Doncaster Works 20/11/1956 29/12/1956 40 days General Boiler number 28276 (Diagram 100A)
 
Stratford Works 08/09/1958 17/10/1958 40 days General    
Doncaster Works 15/06/1960 23/07/1960 39 days General Boiler number 28192 (Diagram 100A)
 

Summary
Date Event Details Source See Also
12/06/1943 To Service To service as London and North Eastern Railway Number 8302, name: ELAND
Built at Darlington Works, Works Number 1912
Allocated to Darlington (DAR)
Diagram 100A boiler fitted
   
30/06/1943 Allocation Reallocated to Stratford (STR)    
10/07/1943 Allocation Reallocated to Norwich Thorpe (NOR)    
24/01/1944 Works Visit Works Visit - Stratford Works (Unclassified) - Arr: 24/01/1944. Dep: 12/02/1944.    
25/06/1944 Allocation Reallocated to Ipswich (IPS)    
11/01/1945 Allocation Reallocated to Parkeston Quay (PKS)    
28/02/1945 Allocation Reallocated to Ipswich (IPS)    
22/03/1945 Works Visit Works Visit - Darlington Works (General) - Arr: 22/03/1945. Dep: 07/06/1945.
Work undertaken:
Boiler number 9431 (Diagram 100A)
   
15/11/1945 Works Visit Works Visit - Stratford Works (Light Repair) - Arr: 15/11/1945. Dep: 24/11/1945.    
27/01/1946 Renumbered Renumbered to 1001    
24/07/1946 Allocation Reallocated to Stratford (STR)    
23/09/1946 Works Visit Works Visit - Stratford Works (General) - Arr: 23/09/1946. Dep: 09/11/1946.
Work undertaken:
Boiler number 9426 (Diagram 100A)
   
07/12/1946 Allocation Reallocated to Parkeston Quay (PKS)    
09/05/1947 Works Visit Works Visit - Stratford Works (Light Repair) - Arr: 09/05/1947. Dep: 14/05/1947.    
01/02/1948 Allocation Reallocated to Stratford (STR)    
07/02/1948 Allocation Reallocated to Stratford (STR)    
10/04/1948 Renumbered Renumbered to 61001    
29/11/1948 Works Visit Works Visit - Stratford Works (General) - Arr: 29/11/1948. Dep: 22/01/1949.
Work undertaken:
Boiler number 9693 (Diagram 100A)
   
10/01/1950 Works Visit Works Visit - Stratford Works (Unclassified) - Arr: 10/01/1950. Dep: 18/01/1950.    
26/03/1950 Allocation Reallocated to Ipswich (32B)    
01/04/1950 Allocation Reallocated to Ipswich (32B)    
30/04/1950 Allocation Reallocated to Stratford (30A)    
18/12/1950 Works Visit Works Visit - Stratford Works (General) - Arr: 18/12/1950. Dep: 03/02/1951.
Work undertaken:
Boiler number 28529 (Diagram 100A)
   
13/03/1951 Works Visit Works Visit - Stratford Works (Light Casual) - Arr: 13/03/1951. Dep: 14/03/1951.    
01/01/1952 Works Visit Works Visit - Stratford Works (Light Casual) - Arr: 01/01/1952. Dep: 12/01/1952.    
22/06/1952 Allocation Reallocated to Neasden (34E)    
24/06/1952 Works Visit Works Visit - Stratford Works (Unclassified) - Arr: 24/06/1952. Dep: 26/06/1952.    
12/07/1952 Allocation Reallocated to Neasden (34E)    
03/02/1953 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/02/1953. Dep: 05/03/1953.
Work undertaken:
Boiler number 28857 (Diagram 100A)
   
23/08/1954 Works Visit Works Visit - Stratford Works (General) - Arr: 23/08/1954. Dep: 08/10/1954.
Work undertaken:
Boiler number 28427 (Diagram 100A)
   
06/01/1956 Works Visit Works Visit - Doncaster Works (Heavy Casual) - Arr: 06/01/1956. Dep: 30/01/1956.    
20/11/1956 Works Visit Works Visit - Doncaster Works (General) - Arr: 20/11/1956. Dep: 29/12/1956.
Work undertaken:
Boiler number 28276 (Diagram 100A)
   
20/01/1957 Allocation Reallocated to Spital Bridge (35C)    
03/03/1957 Allocation Reallocated to Ipswich (32B)    
08/09/1958 Works Visit Works Visit - Stratford Works (General) - Arr: 08/09/1958. Dep: 17/10/1958.    
27/09/1959 Allocation Reallocated to Norwich Thorpe (32A)    
29/11/1959 Allocation Reallocated to Doncaster (36A)    
15/06/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 15/06/1960. Dep: 23/07/1960.
Work undertaken:
Boiler number 28192 (Diagram 100A)
   
22/09/1963 Withdrawn Condemned as 61001 from Doncaster (36A)    
10/1963 Scrapped Broken up by Locomotive Works: Doncaster    

prev prev