Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 29 Online
» 3330 Today
» 5422 Yesterday
» 24364 Week
» 123009 Month
» 325673 Year
» 3352526 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
British Railways 60129 on 15/06/1949

Names Carried
Date From Name
11/1950 GUY MANNERING

Liveries Carried
Colour Lining Date From
BR Blue Black and White 15/06/1949
BR Green Orange and Black 27/02/1952

Locomotive Specifics
Designer A. Peppercorn
Class A1
Company History LNER
Wheels 4-6-2
Builder Doncaster Works
Order Number 383
Works Number 2046
To Service Mon 15/06/1949 to York (North) (YK)
Withdrawal Mon 11/10/1965 off York (North) (50A)
Service Life 16 yrs, 3 mths , 26 dys

Disposal

Notes
Notes Sold for scrap 11/65 to R A King, Norwich

Allocations
Code Subsequent Codes Name From Date
YK   York (North) (New) on 15/06/1949
GHD   Gateshead on 04/09/1949
GHD   Gateshead w/e 10/09/1949
52B   Heaton on 11/09/1960
52D   Tweedmouth on 09/09/1962
52A   Gateshead on 06/12/1964
50A   York (North) on 11/07/1965
     Withdrawn on 11/10/1965

SLS Allocations*
Type Code Name From Date
NEW YK York (North) on 15/06/1949
ALLOC GHD Gateshead w/e 10/09/1949
ALLOC 52B Heaton 4w/e 01/10/1960
ALLOC 52D Tweedmouth 4w/e 06/10/1962
ALLOC 52A Gateshead 2w/e 19/12/1964
ALLOC 52A Gateshead 4w/e 02/01/1965
ALLOC 50A York (North) 4w/e 17/07/1965
WDN   on 11/10/1965

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
15/06/1949 Diagram 118 boiler fitted (number 9675)
27/02/1952 Diagram 118 boiler fitted (number 29814)
08/07/1953 Diagram 118 boiler fitted (number 29800)
09/11/1954 Diagram 118 boiler fitted (number 29862)
16/05/1956 Diagram 118 boiler fitted (number 29836)
30/11/1957 Diagram 117 boiler fitted (number 29779)
02/09/1959 Diagram 118 boiler fitted (number 29828)
17/03/1961 Diagram 117 boiler fitted (number 29780)
07/12/1963 Diagram 118 boiler fitted (number 29870)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 08/05/1950 15/05/1950 8 days Light Casual    
Doncaster Works 11/10/1950 10/11/1950 31 days Heavy Intermediate Named GUY MANNERING
 
Darlington Works 22/01/1951 22/01/1951 1 day Weighing    
Doncaster Works 28/01/1952 27/02/1952 31 days General Boiler number 29814 (Diagram 118)
 
Doncaster Works 01/06/1953 08/07/1953 38 days General Boiler number 29800 (Diagram 118)
 
Doncaster Works 05/10/1954 09/11/1954 36 days General Boiler number 29862 (Diagram 118)
 
Gateshead Works 11/07/1955 15/07/1955 5 days Unclassified    
Doncaster Works 31/01/1956 31/01/1956 1 day Weighing    
Doncaster Works 11/04/1956 16/05/1956 36 days General Boiler number 10593 (Diagram 118)
 
Doncaster Works 30/10/1957 30/11/1957 32 days General Boiler number 29779 (Diagram 117)
 
Doncaster Works 05/08/1958 13/08/1958 9 days Unclassified    
Doncaster Works 28/07/1959 02/09/1959 37 days General Boiler number 10595 (Diagram 118)
 
Doncaster Works 10/02/1961 17/03/1961 36 days General Boiler number 29780 (Diagram 117)
 
Doncaster Works 18/09/1961 28/09/1961 11 days Unclassified    
Doncaster Works 03/10/1961 06/10/1961 4 days Unclassified    
Doncaster Works 19/01/1962 24/02/1962 37 days Light Casual    
Darlington Works 25/09/1963 07/12/1963 74 days General Boiler number 29870 (Diagram 118)
 
Darlington Works 09/12/1963 12/12/1963 4 days Unclassified    

Mentions ...
Report Date Title Report Source
11/08/1959 Doncaster Works (Crimpsall shops-No. 4 Bay) Paint shop- D223, D2066, D2265, D3060, 60075/511, 61825, 73010/165; Weigh-house- D224, D2065, 60006, 61211, 62054, 63934; New Erecting shop- D2067/8/9, E5010-4, D3070, D3137/49, D3230/2/3I; Crimpsall shops-No. 2 Bay- 12113, 13254, D3072, 61185, 61809/62/73/903/27, 63930/48, 68904/65; Crimpsall shops-No. 4 Bay- 60016/20/77/90/4/129/50/536; 61210, 62057 an 63957 on south side with Service loco 4; Stripping-60038/82, 61813/39, 63965, 70000, 73163/6. Awaiting cut up- 61661, 64181/258, 68973, 69515/7/45/8/76/84; Being cut up-60700, 61627, 64246, 69536/9. For condition reports- 61623, 68974, 69526/41/91. In yard D3229 an 11160. SLS/195909
19/02/1961 Doncaster Works (Erecting Shop) New Erecting Shop: D3063, D2385-9, E3056-61. New Erecting Shop Yard: E3062. Scrap Road: DEPT2, DEPT9, 61766, 64231, 68623, 68875, 68930/47/79, 69574. Stripping Road: D3452/85, 60010/23/92, 60118/36/40, 60529, 61950, 63943, 64878/85, 68943, 76032. Erecting Shop: D2233, D2402, D3165, D3575, D3630, D8210, 43081, 60030/1/68, 60103/10/29/39, 60521, 61138, 61254, 61313/8, 61807, 61901/13/61, 62032/50, 63926/86, 73001. Outside Erecting Shop: 60021/41, 61150, 61234, 61926, 63964, 73096. Crimpsall: 60133, 62039. Paint Shop: D318/33, D5686/7, D6708/9, D8046, 43152, 60514/34, 61096, 70054. Outside Paint Shop: 60124, 60522, 61165, 61954. Works Shunters: DEPT10 (ex-68911), DEPT11 (ex-68914), 68977. SLS/196104
28/01/1962 Doncaster Works (Stripping Road) New Erecting Shop: D5643, D8213, E3072-6. Stripping Road: D4055/63, 60129, 60853, 61285, 61315, 63630, 73036. Crimpsall: 60119, 63962. Outside Crimpsall: 60870, 60938, 61168, 62021/34. Scrap Road: 68900 intact, 61862, 61908 being cut up. Erecting Shop: D3482, D5525/95, D5642/57, 12126/33, 13288, 60043/61/78/83/97, 60107, 60817, 61252, 61374/5, 61899, 63571, 70003/7, 76021. Erecting Shop Yard: 60062, 60112. Boiler Park: 60014/47. Weigh House: D5547. Outside Weigh House: D3289, 61223, 63924, 68928, 70006. Paint Shop: D3336, D3487, D5371/2, D5822, E3070/1, 60087, 76046. Paint Shop Yard: Nil. Works Shunters: DEPT. 10/1. SLS/196203
26/02/1962 Doncaster Works (Erecting Shop) Works Yard: 43158, 60039/67, 60153, 60517, 60905/28, 61000/58, 61234, 62014, 63942. Stripping Shop: 60108, 60500, 63932. Outside Stripping Shop: 60040, 60162, 60850/75, 62034, 63652, 70036, 73016. Erecting Shop: D3129, D3440/80/2, D5655/63, D6707/9/15, D8210, 43080, 60030/2/51, 60129/39, 60871, 61281, 63630, 63872, 63945/84, 70038, 73036. Outside Erecting Shop: D5525, D5605/43/70, 60028. Weigh House: 60026, 60119. Scrap Road: 61818, 61945/66, 64177/91, 64245. Paint Shop: D380, D2408, D5376, E3071/2, 12126, 60078, 60870, 61315, 63571. New Erecting Shop: D6700, D8027, E3073-8. Boiler Shop: E3079/80. Works Shunters: DEPT.10/1, 63858, 68928. Ex-Works: 61285. SLS/196204

Summary
Date Event Details Source See Also
15/06/1949 To Service To service as British Railways Number 60129
Built at Doncaster Works, Works Number 2046
Allocated to York (North) (YK)
Livery applied: BR Blue for steam locomotives, with broad black, inlaid with thin white lining.
Diagram 118 boiler fitted
   
04/09/1949 Allocation Reallocated to Gateshead (GHD)    
10/09/1949 Allocation Reallocated to Gateshead (GHD)    
08/05/1950 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 08/05/1950. Dep: 15/05/1950.    
11/10/1950 Works Visit Works Visit - Doncaster Works (Heavy Intermediate) - Arr: 11/10/1950. Dep: 10/11/1950.
Work undertaken:
Named GUY MANNERING
   
22/01/1951 Works Visit Works Visit - Darlington Works (Weighing) - Arr: 22/01/1951. Dep: 22/01/1951.    
28/01/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 28/01/1952. Dep: 27/02/1952.
Work undertaken:
Boiler number 29814 (Diagram 118)
   
27/02/1952 Livery Change of livery to Green with orange and black lining.    
01/06/1953 Works Visit Works Visit - Doncaster Works (General) - Arr: 01/06/1953. Dep: 08/07/1953.
Work undertaken:
Boiler number 29800 (Diagram 118)
   
05/10/1954 Works Visit Works Visit - Doncaster Works (General) - Arr: 05/10/1954. Dep: 09/11/1954.
Work undertaken:
Boiler number 29862 (Diagram 118)
   
11/07/1955 Works Visit Works Visit - Gateshead Works (Unclassified) - Arr: 11/07/1955. Dep: 15/07/1955.    
31/01/1956 Works Visit Works Visit - Doncaster Works (Weighing) - Arr: 31/01/1956. Dep: 31/01/1956.    
11/04/1956 Works Visit Works Visit - Doncaster Works (General) - Arr: 11/04/1956. Dep: 16/05/1956.
Work undertaken:
Boiler number 10593 (Diagram 118)
   
30/10/1957 Works Visit Works Visit - Doncaster Works (General) - Arr: 30/10/1957. Dep: 30/11/1957.
Work undertaken:
Boiler number 29779 (Diagram 117)
   
05/08/1958 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 05/08/1958. Dep: 13/08/1958.    
28/07/1959 Works Visit Works Visit - Doncaster Works (General) - Arr: 28/07/1959. Dep: 02/09/1959.
Work undertaken:
Boiler number 10595 (Diagram 118)
   
11/09/1960 Allocation Reallocated to Heaton (52B)    
10/02/1961 Works Visit Works Visit - Doncaster Works (General) - Arr: 10/02/1961. Dep: 17/03/1961.
Work undertaken:
Boiler number 29780 (Diagram 117)
   
18/09/1961 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 18/09/1961. Dep: 28/09/1961.    
03/10/1961 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 03/10/1961. Dep: 06/10/1961.    
19/01/1962 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 19/01/1962. Dep: 24/02/1962.    
09/09/1962 Allocation Reallocated to Tweedmouth (52D)    
25/09/1963 Works Visit Works Visit - Darlington Works (General) - Arr: 25/09/1963. Dep: 07/12/1963.
Work undertaken:
Boiler number 29870 (Diagram 118)
   
09/12/1963 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 09/12/1963. Dep: 12/12/1963.    
06/12/1964 Allocation Reallocated to Gateshead (52A)    
11/07/1965 Allocation Reallocated to York (North) (50A)    
11/10/1965 Withdrawn Condemned as 60129 from York (North) (50A)    

prev prev