Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 28 Online
» 2133 Today
» 4397 Yesterday
» 19936 Week
» 72952 Month
» 192479 Year
» 3219332 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D7091 24/09/1963  

Locomotive Specifics
Class as Built 35
Subclass/Rebuild History
ClassFrom
3524/09/1963
Wheels B-B
Builder Beyer Peacock Ltd.
Order Number BP3039
Works Number 7995
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Spanner Mk 3
AWS Western Region AWS (ATC) fitted
To Service 24/09/1963 to Cardiff Canton (86A)
Withdrawn 10/08/1972 off Cardiff Canton (86A)
Time in Service 8 yrs, 10 mths , 17 dys
Cut Up 10/1972
Cut At Locomotive Works (Swindon)
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GSYP Green with small yellow panels and light green skirting, white window surrounds 24/09/1963

Allocations - WIP
Code Subsequent Codes Name From Date
86A   Cardiff Canton (New) on 24/09/1963
82A   Bristol Bath Road 2w/e 23/01/1965
86A   Cardiff Canton 8w/e 30/10/1966
     Withdrawn on 10/08/1972

Configuration - WIP
Date Configuration Description Additional Diagram Source
24/09/1963 vb Vacuum brakes, Steam heat WR ATC    


Summary
Start Event Details Source See Also
24/09/1963 To Service To service as British Railways number D7091
Built at Beyer Peacock Ltd., Works Number 7995
Allocated to Cardiff Canton (86A)
   
23/01/1965 Allocation Reallocated to Bristol Bath Road (82A)    
30/10/1966 Allocation Reallocated to Cardiff Canton (86A)    
10/08/1972 Withdrawn Condemned as 7091 from Cardiff Canton (86A)    
10/1972 Scrapped Broken up by Locomotive Works: Swindon    

prev prev