Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 17 Online
» 2564 Today
» 4163 Yesterday
» 15970 Week
» 68986 Month
» 188513 Year
» 3215366 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D2061 20/06/1959  
TOPS (Tops) 03061 02/1974  

Locomotive Specifics
Class as Built 03
Subclass/Rebuild History
ClassFrom
0320/06/1959
Wheels 0-6-0
Builder Doncaster Works
To Service 20/06/1959 to Gateshead (52A)
Withdrawn 12/10/1980
Time in Service 21 yrs, 3 mths , 22 dys
Cut Up 07/1983
Cut At Locomotive Works (Swindon)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
52A   Gateshead (New) on 20/06/1959
56G   Bradford Hammerton Street 4w/e 25/02/1967
51L   Thornaby 4w/e 24/02/1968
52A   Gateshead w/e 06/05/1972
     Withdrawn on 12/10/1980

Configuration - WIP
Date Configuration Description Additional Diagram Source
20/06/1959 v Vacuum brakes      


Summary
Start Event Details Source See Also
20/06/1959 To Service To service as British Railways number D2061
Built at Doncaster Works
Allocated to Gateshead (52A)
   
25/02/1967 Allocation Reallocated to Bradford Hammerton Street (56G)    
24/02/1968 Allocation Reallocated to Thornaby (51L)    
06/05/1972 Allocation Reallocated to Gateshead (52A)    
02/1974 Renumbered Renumbered to 03061    
12/10/1980 Withdrawn Condemned as 03061    
07/1983 Scrapped Broken up by Locomotive Works: Swindon    

prev prev