Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 4 Online
» 67 Today
» 4397 Yesterday
» 17870 Week
» 70886 Month
» 190413 Year
» 3217266 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D7 28/11/1959  
TOPS (Tops) 44007 27/02/1974  

Names Carried
Name Date From
INGLEBOROUGH 28/11/1959

Locomotive Specifics
Class as Built 44
Subclass/Rebuild History
ClassFrom
4428/11/1959
Wheels 1Co-Co1
Builder Derby Works
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Stone OK4625
Multiple Fitting Blue Star
Other Details Route Disc Indicators
Nose end Gangway
Cost when Built £129,371.00
To Service 28/11/1959 to Camden (1B)
Withdrawn 30/11/1980 off Toton (TO)
Time in Service 21 yrs , 2 dys
Cut Up 11/1981
Cut At Locomotive Works (Derby)
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GNP All over Green including front of cab 28/11/1959
BFYE BR Blue bodywork, full yellow cab front 03/1973

Allocations - WIP
Code Subsequent Codes Name From Date
1B   Camden (New) on 28/11/1959
17A   Derby (on loan) w/e 12/12/1959
1B   Camden w/e 23/04/1960
18A   Toton w/e 03/03/1962
D16   Nottingham Division on 16/01/1965
     Withdrawn on 30/11/1980

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
05/11/1960 E.4983 BR Automatic Warning System (AWS) fitted   £345/-/-   £345/-/-
07/09/1963 R.12347 Bogie Frame Strengthening   £107/18/1 £23/5/4 £131/3/5
07/09/1963 R.12286 SLM Exhausters   £14/10/- £4/-/- £18/10/-
07/09/1963 C/RC/19 Steam heat boiler removed   £196/10/-   £196/10/-
by 10/1975   Fitted with Modified Triple Valve (MTV) Brakes        

Configuration - WIP
Date Configuration Description Additional Diagram Source
28/11/1959 vb Vacuum brakes, Steam heat      
05/11/1960 vb Vacuum brakes, Steam heat BR AWS    
07/09/1963 vo Vacuum brakes, No heat BR AWS    
by 10/1975 vo Vacuum brakes, No heat BR AWS, Modified Triple Valve Brake    


Works Visits
Where Repaired Date Stopped Days Since Last Stopped Works Entry Departure Class of Repair Waiting Repair Decision Waiting Works On Works Total Duration Cost of Repair Mileage Notes
Derby Works 28/06/1960 n/a 07/07/1960 Non Classified     8 days 8 days £3,202.00 23,661  
Derby Works 01/10/1960 86 days 04/11/1960 Light Casual 1 day 12 days 16 days 29 days £171.00 44,517  
Derby Works 18/01/1961 75 days 28/01/1961 Light Casual   4 days 5 days 9 days £1,839.00 57,147  
Crewe Works 24/07/1961 177 days 12/08/1961 Light Casual 3 days 5 days 9 days 17 days £1,926.00 92,293  
Crewe Works 15/01/1962 156 days 09/06/1962 Heavy Casual   2 days 122 days 124 days £3,830.00 121,105  
Derby Works 09/04/1963 304 days 30/08/1963 Heavy Casual   1 day 112 days 113 days   151,150  
Derby Works 12/03/1964 195 days 15/04/1964 Unclassified   1 day 27 days 28 days    

Performance Statistics (Form E.R.O 3666)
Year Annual Mileage Cumulative Mileage Fuel Oil Utilised Approximate Miles/Gallon Classified Wait Repair Classified Wait Works Classified On Works Classified Total (Wkdys) Running Repairs Running Repair & Exams Cost Wkdys Not Required for Service Wkdys Stored Serviceable Wkdys Stored Unserviceable Total Weekdays Unavailable
1959 1,259 1,259 2,960g 0.43         23 £42       23
1960 55,054 56,313 62,477g 0.88 1 12 24 37 82 £1,451 21     140
1961 59,344 115,657                      
1962 24,452 140,109                      
1963 24,627 164,736                      

Summary
Start Event Details Source See Also
28/11/1959 To Service To service as British Railways number D7, name: INGLEBOROUGH
Built at Derby Works
Allocated to Camden (1B)
Livery applied: All over Green including front of cab
   
12/12/1959 Allocation Loaned to Derby (17A)    
23/04/1960 Allocation Reallocated to Camden (1B)    
07/07/1960 Works Visit Works Visit - Derby Works (Non Classified) - Dep: 07/07/1960.
Stopped on 28/06/1960
   
04/11/1960 Works Visit Works Visit - Derby Works (Light Casual) - Dep: 04/11/1960.
Stopped on 01/10/1960
   
05/11/1960 Modification Modification: BR Automatic Warning System (AWS) fitted    
28/01/1961 Works Visit Works Visit - Derby Works (Light Casual) - Dep: 28/01/1961.
Stopped on 18/01/1961
   
12/08/1961 Works Visit Works Visit - Crewe Works (Light Casual) - Dep: 12/08/1961.
Stopped on 24/07/1961
   
03/03/1962 Allocation Reallocated to Toton (18A)    
09/06/1962 Works Visit Works Visit - Crewe Works (Heavy Casual) - Dep: 09/06/1962.
Stopped on 15/01/1962
   
30/08/1963 Works Visit Works Visit - Derby Works (Heavy Casual) - Dep: 30/08/1963.
Stopped on 09/04/1963
   
07/09/1963 Modification Modification: Bogie Frame Strengthening    
07/09/1963 Modification Modification: SLM Exhausters    
07/09/1963 Modification Modification: Steam heat boiler removed    
15/04/1964 Works Visit Works Visit - Derby Works (Unclassified) - Dep: 15/04/1964.
Stopped on 12/03/1964
   
16/01/1965 Allocation Reallocated to Nottingham Division (D16)    
03/1973 Livery Change of livery to BR Blue bodywork, full yellow cab front    
27/02/1974 Renumbered Renumbered to 44007    
10/1975 Modification Modification: Fitted with Modified Triple Valve (MTV) Brakes    
30/11/1980 Withdrawn Condemned as 44007 from Toton (TO)    
11/1981 Scrapped Broken up by Locomotive Works: Derby    

prev prev