Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 3 Online
» 616 Today
» 5784 Yesterday
» 6400 Week
» 27789 Month
» 147316 Year
» 3174169 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D6725 31/08/1961  
TOPS (37/0) 37025 02/1974  

Locomotive Specifics
Class as Built 37
Subclass/Rebuild History
ClassFrom
3731/08/1961
Wheels Co-Co
Builder English Electric Vulcan Foundry
Works Number 2888/D604
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Clayton RO2500/03
Multiple Fitting Blue Star
Other Details Split Headcode Boxes
Nose end Gangway
To Service 31/08/1961 to Stratford (30A)
Withdrawn 01/02/1999
Time in Service 37 yrs, 5 mths , 1 dy
Status Preserved

Liveries Carried - WIP
Code Colour Date From
GNP All over Green including front of cab 31/08/1961
BFYE BR Blue bodywork, full yellow cab front by 11/1970

Allocations - WIP
Code Subsequent Codes Name From Date
30A   Stratford (New) on 31/08/1961
31B   March w/e 23/04/1966
TE   Thornaby w/e 16/02/1974
MR   March m/e 02/1977
ED   Eastfield on 07/06/1981
ML   Motherwell on 04/10/1987
ED   Eastfield on 05/06/1988
     Withdrawn on 01/02/1999

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
by 30/10/1970   EQ Brakes Added        
by 05/12/1970   EQ Brakes Added        
by 06/1974   Steam heat boiler isolated        
by 11/1975   Steam heat boiler reinstated        
by 12/1977   Steam heat boiler isolated        

Configuration - WIP
Date Configuration Description Additional Diagram Source
31/08/1961 vb Vacuum brakes, Steam heat      
by 30/10/1970 vb Vacuum brakes, Steam heat EQ Brakes    
by 05/12/1970 vb Vacuum brakes, Steam heat Modified Triple Valve & EQ Brakes    
by 06/1974 vi Vacuum brakes, Isolated boiler Modified Triple Valve & EQ Brakes    
by 11/1975 vb Vacuum brakes, Steam heat Modified Triple Valve & EQ Brakes    
by 12/1977 vi Vacuum brakes, Isolated boiler Modified Triple Valve & EQ Brakes    

Preservation
Current Status Unknown


Summary
Start Event Details Source See Also
31/08/1961 To Service To service as British Railways number D6725
Built at English Electric Vulcan Foundry, Works Number 2888
Allocated to Stratford (30A)
Livery applied: All over Green including front of cab
   
23/04/1966 Allocation Reallocated to March (31B)    
30/10/1970 Modification Modification: EQ Brakes Added    
11/1970 Livery Change of livery to BR Blue bodywork, full yellow cab front    
05/12/1970 Modification Modification: EQ Brakes Added    
02/1974 Renumbered Renumbered to 37025    
16/02/1974 Allocation Reallocated to Thornaby (TE)    
06/1974 Modification Modification: Steam heat boiler isolated    
11/1975 Modification Modification: Steam heat boiler reinstated    
02/1977 Allocation Reallocated to March (MR)    
12/1977 Modification Modification: Steam heat boiler isolated    
07/06/1981 Allocation Reallocated to Eastfield (ED)    
04/10/1987 Allocation Reallocated to Motherwell (ML)    
05/06/1988 Allocation Reallocated to Eastfield (ED)    
01/02/1999 Withdrawn Condemned as 37025    

prev prev