Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 3924 Today
» 4163 Yesterday
» 17330 Week
» 70346 Month
» 189873 Year
» 3216726 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D6109 07/04/1959  

Locomotive Specifics
Class as Built 21
Subclass/Rebuild History
ClassFrom
2107/04/1959
Wheels Bo-Bo
Builder North British Locomotive Company, Glasgow
Order Number L79
Works Number 27690
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Spanner Mk 1
Multiple Fitting Red Circle
To Service 07/04/1959 to Hornsey (34B)
Withdrawn 06/04/1968 off Eastfield (65A)
Time in Service 8 yrs, 11 mths , 30 dys
Cut Up 01/1969
Cut At J McWilliams (Shettleston)
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GNP All over Green including front of cab 07/04/1959

Allocations - WIP
Code Subsequent Codes Name From Date
34B   Hornsey (New) on 07/04/1959
65A   Eastfield w/e 16/04/1960
     Withdrawn on 06/04/1968

Configuration - WIP
Date Configuration Description Additional Diagram Source
07/04/1959 vb Vacuum brakes, Steam heat      

Fires
Date of Fire Severity Damage Source of Fire Material Details Location
03/04/1962 Unknown   Hot engine parts, including exhaust blows Fuel or lubricating oil sprays or leaks    
28/08/1964 Not severe   Brake block sparks Oil impregnated dirt or waste    


Works Visits
Where Repaired Date Stopped Days Since Last Stopped Works Entry Departure Class of Repair Waiting Repair Decision Waiting Works On Works Total Duration Cost of Repair Mileage Notes
St. Rollox Works n/a 27/02/1961 15/03/1961 Heavy Casual       17 days   31,764  
St. Rollox Works n/a 19/09/1961 20/09/1961 Light Casual       2 days   48,541  
St. Rollox Works n/a 05/09/1962 20/10/1962 Light Casual       46 days    
St. Rollox Works n/a 27/03/1964 Unclassified            
St. Rollox Works n/a 20/05/1964 12/06/1964 Unclassified       24 days    
Inverurie Works n/a 09/03/1965 17/03/1965 Unclassified       9 days    
Inverurie Works n/a 16/09/1966 13/01/1967 General       120 days    
Inverurie Works n/a 25/02/1967 13/03/1967 Power Unit       17 days    
Inverurie Works n/a 30/03/1967 16/05/1967 Unclassified       48 days    
Inverurie Works n/a 07/07/1967 25/08/1967 Unclassified       50 days    

Summary
Start Event Details Source See Also
07/04/1959 To Service To service as British Railways number D6109
Built at North British Locomotive Company, Glasgow, Works Number 27690
Allocated to Hornsey (34B)
Livery applied: All over Green including front of cab
   
16/04/1960 Allocation Reallocated to Eastfield (65A)    
27/02/1961 Works Visit Works Visit - St. Rollox Works (Heavy Casual) - Arr: 27/02/1961. Dep: 15/03/1961.    
19/09/1961 Works Visit Works Visit - St. Rollox Works (Light Casual) - Arr: 19/09/1961. Dep: 20/09/1961.    
05/09/1962 Works Visit Works Visit - St. Rollox Works (Light Casual) - Arr: 05/09/1962. Dep: 20/10/1962.    
27/03/1964 Works Visit Works Visit - St. Rollox Works (Unclassified) - Dep: 27/03/1964.    
20/05/1964 Works Visit Works Visit - St. Rollox Works (Unclassified) - Arr: 20/05/1964. Dep: 12/06/1964.    
09/03/1965 Works Visit Works Visit - Inverurie Works (Unclassified) - Arr: 09/03/1965. Dep: 17/03/1965.    
16/09/1966 Works Visit Works Visit - Inverurie Works (General) - Arr: 16/09/1966. Dep: 13/01/1967.    
25/02/1967 Works Visit Works Visit - Inverurie Works (Power Unit) - Arr: 25/02/1967. Dep: 13/03/1967.    
30/03/1967 Works Visit Works Visit - Inverurie Works (Unclassified) - Arr: 30/03/1967. Dep: 16/05/1967.    
07/07/1967 Works Visit Works Visit - Inverurie Works (Unclassified) - Arr: 07/07/1967. Dep: 25/08/1967.    
06/04/1968 Withdrawn Condemned as 6109 from Eastfield (65A)    
01/1969 Scrapped Broken up by J McWilliams: Shettleston    

prev prev