Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 2976 Today
» 4163 Yesterday
» 16382 Week
» 69398 Month
» 188925 Year
» 3215778 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D602 03/11/1958  

Names Carried
Name Date From
BULLDOG 03/11/1958

Locomotive Specifics
Class as Built D20/2
Subclass/Rebuild History
ClassFrom
20/403/11/1958
Wheels A1A-A1A
Builder North British Locomotive Company, Glasgow
Order Number L76
Works Number 27662
To Service 03/11/1958 to Laira (83D)
Withdrawn 31/12/1967
Time in Service 9 yrs, 1 mth , 28 dys
Total Mileage 500,000 miles
Cut Up 08/1968
Cut At Cashmore's (Newport)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
83D   Laira (New) on 03/11/1958
84A   Laira 4w/e 31/08/1967
     Withdrawn on 31/12/1967

Configuration - WIP
Date Configuration Description Additional Diagram Source
03/11/1958 vb Vacuum brakes, Steam heat WR ATC    

Fires
Date of Fire Severity Damage Source of Fire Material Details Location
16/01/1964 Not severe   Hot engine parts, including exhaust blows Fuel or lubricating oil sprays or leaks    


Works Visits
Where Repaired Date Stopped Days Since Last Stopped Works Entry Departure Class of Repair Waiting Repair Decision Waiting Works On Works Total Duration Cost of Repair Mileage Notes
Swindon Works 27/04/1959 n/a 27/04/1959 27/05/1959 Power Unit
Engine change/piston seizure
      31 days    
Swindon Works 16/12/1959 203 days 17/12/1959 13/01/1960 Light Casual       28 days    
Swindon Works 04/05/1960 112 days 05/05/1960 21/06/1960 Light Casual       48 days    
Swindon Works 19/07/1960 28 days 19/07/1960 22/07/1960 Light Casual       4 days    
Swindon Works 19/12/1960 150 days 19/12/1960 27/01/1961 Light Casual       40 days    
Swindon Works 22/02/1961 26 days 24/02/1961 23/03/1961 Light Casual       28 days    
Swindon Works 27/03/1961 4 days 08/05/1961 06/06/1961 Intermediate
154,181 miles
      30 days    
Swindon Works 21/06/1961 15 days 10/07/1961 14/08/1961 Light Casual       36 days    
Swindon Works 13/01/1962 152 days 18/01/1962 23/01/1962 Light Casual       6 days    
Swindon Works 17/02/1962 25 days 22/02/1962 04/04/1962 Light Casual       42 days    
Swindon Works 24/05/1962 50 days 28/05/1962 20/06/1962 Heavy Casual       24 days    
Swindon Works 27/08/1962 68 days 30/08/1962 07/09/1962 Heavy Casual       9 days    
Swindon Works 24/09/1963 382 days 24/09/1963 04/10/1963 Heavy Casual       11 days    
Swindon Works n/a 26/07/1964 Unknown Regime
Seen in ‘A‘ shop - stil there on 27/9/64
           
Swindon Works n/a 04/12/1966 03/02/1967 Unknown Regime       62 days    

Summary
Start Event Details Source See Also
03/11/1958 To Service To service as British Railways number D602, name: BULLDOG
Built at North British Locomotive Company, Glasgow, Works Number 27662
Allocated to Laira (83D)
   
27/04/1959 Works Visit Works Visit - Swindon Works (Power Unit) - Arr: 27/04/1959. Dep: 27/05/1959.
Stopped on 27/04/1959
Work undertaken:
Engine change/piston seizure
   
17/12/1959 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 17/12/1959. Dep: 13/01/1960.
Stopped on 16/12/1959
   
05/05/1960 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 05/05/1960. Dep: 21/06/1960.
Stopped on 04/05/1960
   
19/07/1960 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 19/07/1960. Dep: 22/07/1960.
Stopped on 19/07/1960
   
19/12/1960 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 19/12/1960. Dep: 27/01/1961.
Stopped on 19/12/1960
   
24/02/1961 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 24/02/1961. Dep: 23/03/1961.
Stopped on 22/02/1961
   
08/05/1961 Works Visit Works Visit - Swindon Works (Intermediate) - Arr: 08/05/1961. Dep: 06/06/1961.
Stopped on 27/03/1961
Work undertaken:
154,181 miles
   
10/07/1961 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 10/07/1961. Dep: 14/08/1961.
Stopped on 21/06/1961
   
18/01/1962 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 18/01/1962. Dep: 23/01/1962.
Stopped on 13/01/1962
   
22/02/1962 Works Visit Works Visit - Swindon Works (Light Casual) - Arr: 22/02/1962. Dep: 04/04/1962.
Stopped on 17/02/1962
   
28/05/1962 Works Visit Works Visit - Swindon Works (Heavy Casual) - Arr: 28/05/1962. Dep: 20/06/1962.
Stopped on 24/05/1962
   
30/08/1962 Works Visit Works Visit - Swindon Works (Heavy Casual) - Arr: 30/08/1962. Dep: 07/09/1962.
Stopped on 27/08/1962
   
24/09/1963 Works Visit Works Visit - Swindon Works (Heavy Casual) - Arr: 24/09/1963. Dep: 04/10/1963.
Stopped on 24/09/1963
   
26/07/1964 Works Visit Works Visit - Swindon Works (Unknown Regime) - Arr: 26/07/1964.
Work undertaken:
Seen in ‘A‘ shop - stil there on 27/9/64
   
04/12/1966 Works Visit Works Visit - Swindon Works (Unknown Regime) - Arr: 04/12/1966. Dep: 03/02/1967.    
31/08/1967 Allocation Reallocated to Laira (84A)    
31/12/1967 Withdrawn Condemned as 602    
08/1968 Scrapped Broken up by Cashmore's: Newport    

prev prev