Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 16 Online
» 2575 Today
» 4163 Yesterday
» 15981 Week
» 68997 Month
» 188524 Year
» 3215377 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 2265 m/e 03/1920
London and North Eastern Railway (1946) 3422   08/09/1946
British Railways 63422 w/e 06/08/1949

Locomotive Specifics
Designer V. Raven
Class Q6
Company History NER/LNER
Rebuild History
ClassFrom
Q603/1920
Wheels 0-8-0
Builder Armstrong Whitworth
Order Number E4
Works Number 13
Fittings (as built)
Engine Brakes Steam
To Service During 03/1920 to Tyne Dock (TDK)
Withdrawal Mon 18/05/1964 off West Hartlepool (51C)
Service Life 44 yrs, 2 mths , 19 dys

Disposal

Notes
Notes Into Darlington for cutting up 29/7/64

Allocations
Code Subsequent Codes Name From Date
TDK   Tyne Dock (New) m/e 03/1920
BOR   Borough Gardens on 08/03/1924
SKN   Stockton on 19/09/1924
NPT   Newport (Teeside) on 09/06/1930
NEV   Neville Hill on 11/09/1944
NPT   Newport (Teeside) on 04/05/1947
WHL   West Hartlepool on 07/09/1947
     Withdrawn on 18/05/1964

SLS Allocations*
Type Code Name From Date
ALLOC NPT Newport (Teeside) on 04/05/1947
ALLOC WHL West Hartlepool on 07/09/1947
WDN   on 18/05/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
03/1920 Diagram 50 boiler fitted (number E4/13)
26/07/1928 Diagram 50 boiler fitted (number D855)
22/12/1938 Diagram 50A boiler fitted (number 2989)
09/05/1941 Diagram 50A boiler fitted (number 3004)
30/11/1946 Diagram 50A boiler fitted (number 3148)
02/08/1949 Diagram 50 boiler fitted (number 2567)
16/08/1952 Diagram 50A boiler fitted (number 24226)
26/03/1959 Diagram 50A boiler fitted (number 24184)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 15/03/1923 22/05/1923 69 days General    
Darlington Works 25/02/1926 09/07/1926 135 days General    
Gateshead Works 25/05/1928 26/07/1928 63 days General Boiler number D855 (Diagram 50)
 
Darlington Works 10/09/1929 23/09/1929 14 days Unclassified    
Darlington Works 28/02/1930 07/04/1930 39 days Light Repair    
Darlington Works 05/08/1930 29/09/1930 56 days General Boiler number 20 (Diagram 50)
 
Darlington Works 08/08/1933 13/09/1933 37 days General    
Darlington Works 22/08/1935 03/10/1935 43 days General    
Darlington Works 20/10/1938 22/12/1938 64 days General Boiler number 2989 (Diagram 50A)
 
Darlington Works 21/03/1940 05/04/1940 16 days Unclassified    
Darlington Works 25/08/1940 24/09/1940 31 days Unclassified    
Darlington Works 08/04/1941 09/05/1941 32 days General Boiler number 3004 (Diagram 50A)
 
Darlington Works 07/05/1943 19/06/1943 44 days General    
Gateshead Works 27/03/1945 12/04/1945 17 days Light Repair    
Darlington Works 31/10/1946 30/11/1946 31 days General Boiler number 3148 (Diagram 50A)
 
Gateshead Works 10/03/1948 26/03/1948 17 days Light Repair    
Darlington Works 23/06/1949 02/08/1949 41 days General Boiler number 2567 (Diagram 50)
Renumbered to BR 63422
 
Darlington Works 10/07/1952 16/08/1952 38 days General Boiler number 24226 (Diagram 50A)
 
Darlington Works 18/08/1952 20/08/1952 3 days Unclassified    
Darlington Works 22/11/1955 16/12/1955 25 days General Boiler number 24238 (Diagram 50A)
 
Darlington Works 22/03/1956 29/03/1956 8 days Light Casual    
Darlington Works 01/04/1959 22/04/1959 22 days Unclassified    

Mentions ...
Report Date Title Report Source
04/07/1964 Darlington Works (Waiting Works) Erecting Shop: D32, D171/6/7/74/8, D5096, D5112/67, D7596/7, DEPT84, D2242/64, D2605, D3151, 60024, 61386, 62062, 65880, 73026/35, 75059/62, 90056/230/43/429/704, 90061. Stripping Shop: 43005, 60836/55, 61030, 63345/70, 90011. Paint Shop: D3675, 75017. Level Crossing: D25, D27, D169, D187. Works Yard: D170/80/9/91, D2163, D2700, 60011/20/527/844/910, 61038, 62002/41, 63460, 65053/99, 73133/55, 90233. Waiting Works: D2586, 60916, 61037, 63383, 63415/22/39, 69003/11/9/20, 90511. Ex Works. 43010/33. Stored: 68016/46/51/4. SLS/196408

Summary
Date Event Details Source See Also
03/1920 To Service To service as North Eastern Railway Number 2265
Built at Armstrong Whitworth, Works Number 13
Allocated to Tyne Dock (TDK)
Diagram 50 boiler fitted
   
15/03/1923 Works Visit Works Visit - Gateshead Works (General) - Arr: 15/03/1923. Dep: 22/05/1923.    
08/03/1924 Allocation Reallocated to Borough Gardens (BOR)    
19/09/1924 Allocation Reallocated to Stockton (SKN)    
25/02/1926 Works Visit Works Visit - Darlington Works (General) - Arr: 25/02/1926. Dep: 09/07/1926.    
25/05/1928 Works Visit Works Visit - Gateshead Works (General) - Arr: 25/05/1928. Dep: 26/07/1928.
Work undertaken:
Boiler number D855 (Diagram 50)
   
10/09/1929 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 10/09/1929. Dep: 23/09/1929.    
28/02/1930 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 28/02/1930. Dep: 07/04/1930.    
09/06/1930 Allocation Reallocated to Newport (Teeside) (NPT)    
05/08/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 05/08/1930. Dep: 29/09/1930.
Work undertaken:
Boiler number 20 (Diagram 50)
   
08/08/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 08/08/1933. Dep: 13/09/1933.    
22/08/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 22/08/1935. Dep: 03/10/1935.    
20/10/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 20/10/1938. Dep: 22/12/1938.
Work undertaken:
Boiler number 2989 (Diagram 50A)
   
21/03/1940 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 21/03/1940. Dep: 05/04/1940.    
25/08/1940 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 25/08/1940. Dep: 24/09/1940.    
08/04/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 08/04/1941. Dep: 09/05/1941.
Work undertaken:
Boiler number 3004 (Diagram 50A)
   
07/05/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 07/05/1943. Dep: 19/06/1943.    
11/09/1944 Allocation Reallocated to Neville Hill (NEV)    
27/03/1945 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 27/03/1945. Dep: 12/04/1945.    
08/09/1946 Renumbered Renumbered to 3422    
31/10/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 31/10/1946. Dep: 30/11/1946.
Work undertaken:
Boiler number 3148 (Diagram 50A)
   
04/05/1947 Allocation Reallocated to Newport (Teeside) (NPT)    
07/09/1947 Allocation Reallocated to West Hartlepool (WHL)    
10/03/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 10/03/1948. Dep: 26/03/1948.    
23/06/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 23/06/1949. Dep: 02/08/1949.
Work undertaken:
Boiler number 2567 (Diagram 50)
Renumbered to BR 63422
   
10/07/1952 Works Visit Works Visit - Darlington Works (General) - Arr: 10/07/1952. Dep: 16/08/1952.
Work undertaken:
Boiler number 24226 (Diagram 50A)
   
18/08/1952 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 18/08/1952. Dep: 20/08/1952.    
22/11/1955 Works Visit Works Visit - Darlington Works (General) - Arr: 22/11/1955. Dep: 16/12/1955.
Work undertaken:
Boiler number 24238 (Diagram 50A)
   
22/03/1956 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 22/03/1956. Dep: 29/03/1956.    
26/03/1959 Modification Diagram 50A number 24184 boiler fitted    
01/04/1959 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 01/04/1959. Dep: 22/04/1959.    
18/05/1964 Withdrawn Condemned as 63422 from West Hartlepool (51C)    

prev prev