Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 13 Online
» 1019 Today
» 4616 Yesterday
» 31669 Week
» 130314 Month
» 332978 Year
» 3359831 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 1278 m/e 05/1913
London and North Eastern Railway (1946) 3354   14/04/1946
British Railways 63354 w/e 03/07/1948

Locomotive Specifics
Designer V. Raven
Class Q6
Company History NER/LNER
Rebuild History
ClassFrom
Q605/1913
Wheels 0-8-0
Builder Darlington Works
Order Number 441A
Fittings (as built)
Engine Brakes Steam
To Service During 05/1913 to Tyne Dock (TDK)
Withdrawal Fri 21/05/1965 off Blyth (North) (52F)
Service Life 52 yrs , 21 dys

Disposal

Notes
Notes Sold for scrap to M Baum, Middlesbrough, 6/65

Allocations
Code Subsequent Codes Name From Date
TDK   Tyne Dock (New) m/e 05/1913
BOR   Borough Gardens on 13/04/1926
NEV   Neville Hill on 28/03/1943
DAR   Darlington on 14/07/1943
NEV   Neville Hill on 09/09/1944
NPT   Newport (Teeside) on 23/07/1945
BOR   Borough Gardens on 06/03/1948
52H   Tyne Dock on 14/06/1959
52K   Consett on 13/12/1959
52F   Blyth (North) on 23/09/1962
     Withdrawn on 21/05/1965

SLS Allocations*
Type Code Name From Date
ALLOC 54B Tyne Dock on 14/06/1959
ALLOC 54D Consett 4w/e 26/12/1959
ALLOC 52F Blyth (North) 4w/e 06/10/1962
WDN   on 21/05/1965

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
05/1913 Diagram 50 boiler fitted (number D198)
12/11/1931 Diagram 50 boiler fitted (number D873)
27/02/1942 Diagram 50 boiler fitted (number 2394)
30/09/1943 Diagram 50 boiler fitted (number 2393)
18/01/1947 Diagram 50 boiler fitted (number 2392)
30/07/1954 Diagram 50A boiler fitted (number 24219)
23/08/1957 Diagram 50A boiler fitted (number 24310)
27/05/1961 Diagram 50A boiler fitted (number 24179)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 04/01/1923 23/03/1923 79 days General    
Darlington Works 20/08/1925 30/09/1925 42 days Light Repair    
Gateshead Works 11/06/1926 19/08/1926 70 days Light Repair    
Gateshead Works 03/01/1928 14/03/1928 72 days General    
Gateshead Works 21/08/1928 12/09/1928 23 days Light Repair    
Gateshead Works 08/10/1929 27/11/1929 51 days Light Repair    
Darlington Works 09/10/1931 12/11/1931 35 days General Boiler number D873 (Diagram 50)
 
Gateshead Works 19/01/1932 02/02/1932 15 days Light Repair    
Darlington Works 05/11/1934 05/12/1934 31 days General    
Darlington Works 29/06/1937 16/09/1937 80 days General    
Darlington Works 27/11/1939 11/01/1940 46 days General    
Darlington Works 27/01/1942 27/02/1942 32 days General Boiler number 2394 (Diagram 50)
 
Darlington Works 04/09/1943 30/09/1943 27 days General Boiler number 2393 (Diagram 50)
 
Darlington Works 01/08/1945 25/08/1945 25 days Light Repair After collision
 
Darlington Works 31/10/1945 01/12/1945 32 days Light Repair    
Darlington Works 10/12/1946 18/01/1947 40 days General Boiler number 2392 (Diagram 50)
 
Darlington Works 20/01/1947 04/02/1947 16 days Light Repair    
Darlington Works 08/02/1947 28/02/1947 21 days Unclassified    
Gateshead Works 18/06/1948 29/06/1948 12 days Light Repair Renumbered to BR 63354
 
Darlington Works 28/11/1949 30/12/1949 33 days General Boiler number 24217 (Diagram 50A)
 
Darlington Works 12/10/1951 09/11/1951 29 days Heavy Intermediate    
Gateshead Works 07/03/1952 04/04/1952 29 days Light Casual    
Darlington Works 29/06/1954 30/07/1954 32 days General Boiler number 24219 (Diagram 50A)
 
Darlington Works 05/10/1956 11/10/1956 7 days Light Casual    
Darlington Works 21/12/1956 19/01/1957 30 days Light Casual    
Gateshead Works 08/07/1957 23/08/1957 47 days General Boiler number 24310 (Diagram 50A)
 
Darlington Works 01/05/1961 27/05/1961 27 days General Boiler number 24179 (Diagram 50A)
 
Darlington Works 27/12/1962 30/01/1963 35 days Light Casual    
Darlington Works 15/01/1964 15/01/1964 1 day Weighing    

Mentions ...
Report Date Title Report Source
09/07/1961 Darlington Works (Erecting Shop) Erecting Shop: D242, D2243/6/8, D2700, D3456, D4073-6, D5160-4, 60803/80/99, 61322, 61457, 63354, 63401/65, 65825, 77012, 78022, 80075, 90061, 90405/26, 92197. Stripping Shop: 61437. Stripping Shop Yard: 60882, 60935/71, 63367, 63417/66, 65760, 77011. Works Yard: D239/78/80, D5158, 43051, 43126/33/4/41, 46480, 60802/55, 60903/63, 63441, 65099, 65761/90, 65820/84, 67643/58, 67760, 68040/7/50, 90089, 92175. Crossing: D13, D4072, D5159. Stooperdale: 90074. Scrap Yard, (i) Complete Locos: 61432/45, 67665, 67707/19/32/8/40, DEPT54. Scrap Yard, (ii) Parts of Locos: 61455, 68080, 68316, 69105, 69921. SLS/196108

Summary
Date Event Details Source See Also
05/1913 To Service To service as North Eastern Railway Number 1278
Built at Darlington Works, Works Number
Allocated to Tyne Dock (TDK)
Diagram 50 boiler fitted
   
04/01/1923 Works Visit Works Visit - Gateshead Works (General) - Arr: 04/01/1923. Dep: 23/03/1923.    
20/08/1925 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 20/08/1925. Dep: 30/09/1925.    
13/04/1926 Allocation Reallocated to Borough Gardens (BOR)    
11/06/1926 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 11/06/1926. Dep: 19/08/1926.    
03/01/1928 Works Visit Works Visit - Gateshead Works (General) - Arr: 03/01/1928. Dep: 14/03/1928.    
21/08/1928 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 21/08/1928. Dep: 12/09/1928.    
08/10/1929 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 08/10/1929. Dep: 27/11/1929.    
09/10/1931 Works Visit Works Visit - Darlington Works (General) - Arr: 09/10/1931. Dep: 12/11/1931.
Work undertaken:
Boiler number D873 (Diagram 50)
   
19/01/1932 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 19/01/1932. Dep: 02/02/1932.    
05/11/1934 Works Visit Works Visit - Darlington Works (General) - Arr: 05/11/1934. Dep: 05/12/1934.    
29/06/1937 Works Visit Works Visit - Darlington Works (General) - Arr: 29/06/1937. Dep: 16/09/1937.    
27/11/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 27/11/1939. Dep: 11/01/1940.    
27/01/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 27/01/1942. Dep: 27/02/1942.
Work undertaken:
Boiler number 2394 (Diagram 50)
   
28/03/1943 Allocation Reallocated to Neville Hill (NEV)    
14/07/1943 Allocation Reallocated to Darlington (DAR)    
04/09/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 04/09/1943. Dep: 30/09/1943.
Work undertaken:
Boiler number 2393 (Diagram 50)
   
09/09/1944 Allocation Reallocated to Neville Hill (NEV)    
23/07/1945 Allocation Reallocated to Newport (Teeside) (NPT)    
01/08/1945 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 01/08/1945. Dep: 25/08/1945.
Work undertaken:
After collision
   
31/10/1945 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 31/10/1945. Dep: 01/12/1945.    
14/04/1946 Renumbered Renumbered to 3354    
10/12/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 10/12/1946. Dep: 18/01/1947.
Work undertaken:
Boiler number 2392 (Diagram 50)
   
20/01/1947 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 20/01/1947. Dep: 04/02/1947.    
08/02/1947 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 08/02/1947. Dep: 28/02/1947.    
06/03/1948 Allocation Reallocated to Borough Gardens (BOR)    
18/06/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 18/06/1948. Dep: 29/06/1948.
Work undertaken:
Renumbered to BR 63354
   
28/11/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 28/11/1949. Dep: 30/12/1949.
Work undertaken:
Boiler number 24217 (Diagram 50A)
   
12/10/1951 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 12/10/1951. Dep: 09/11/1951.    
07/03/1952 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 07/03/1952. Dep: 04/04/1952.    
29/06/1954 Works Visit Works Visit - Darlington Works (General) - Arr: 29/06/1954. Dep: 30/07/1954.
Work undertaken:
Boiler number 24219 (Diagram 50A)
   
05/10/1956 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 05/10/1956. Dep: 11/10/1956.    
21/12/1956 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 21/12/1956. Dep: 19/01/1957.    
08/07/1957 Works Visit Works Visit - Gateshead Works (General) - Arr: 08/07/1957. Dep: 23/08/1957.
Work undertaken:
Boiler number 24310 (Diagram 50A)
   
14/06/1959 Allocation Reallocated to Tyne Dock (52H)    
13/12/1959 Allocation Reallocated to Consett (52K)    
01/05/1961 Works Visit Works Visit - Darlington Works (General) - Arr: 01/05/1961. Dep: 27/05/1961.
Work undertaken:
Boiler number 24179 (Diagram 50A)
   
23/09/1962 Allocation Reallocated to Blyth (North) (52F)    
27/12/1962 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 27/12/1962. Dep: 30/01/1963.    
15/01/1964 Works Visit Works Visit - Darlington Works (Weighing) - Arr: 15/01/1964. Dep: 15/01/1964.    
21/05/1965 Withdrawn Condemned as 63354 from Blyth (North) (52F)    

prev prev