Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 18 Online
» 251 Today
» 4469 Yesterday
» 14294 Week
» 79248 Month
» 281912 Year
» 3308765 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 1264 m/e 06/1913
London and North Eastern Railway (1946) 3351   07/04/1946
British Railways 63351 w/e 19/06/1948

Locomotive Specifics
Designer V. Raven
Class Q6
Company History NER/LNER
Rebuild History
ClassFrom
Q606/1913
Wheels 0-8-0
Builder Darlington Works
Order Number 441A
Fittings (as built)
Engine Brakes Steam
To Service During 06/1913 to Tyne Dock (TDK)
Withdrawal Mon 18/01/1965 off West Hartlepool (51C)
Service Life 51 yrs, 7 mths , 18 dys

Disposal

Notes
Notes Sold for scrap to M Baum, Middlesbrough 3/65

Allocations
Code Subsequent Codes Name From Date
TDK   Tyne Dock (New) m/e 06/1913
AFP   Annfield Plain on 24/06/1937
CON   Consett on 09/09/1940
TDK   Tyne Dock on 29/11/1947
MID   Middlesbrough on 13/02/1949
MID   Middlesbrough w/e 19/02/1949
51F   West Auckland on 29/08/1954
51C   West Hartlepool on 24/11/1963
     Withdrawn on 18/01/1965

SLS Allocations*
Type Code Name From Date
ALLOC TDK Tyne Dock w/e 29/11/1947
ALLOC MID Middlesbrough w/e 19/02/1949
ALLOC 51F West Auckland 4w/e 11/09/1954
ALLOC 51C West Hartlepool 4w/e 07/12/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/1913 Diagram 50 boiler fitted (number D192)
29/07/1924 Diagram 50 boiler fitted (number D1569)
15/12/1936 Diagram 50 boiler fitted (number 2433)
15/11/1940 Diagram 50A boiler fitted (number 3153)
08/04/1943 Diagram 50A boiler fitted (number 2985)
29/12/1945 Diagram 50A boiler fitted (number 3149)
14/05/1949 Diagram 50A boiler fitted (number 3015)
05/05/1951 Diagram 50A boiler fitted (number 24184)
18/07/1953 Diagram 50A boiler fitted (number 24291)
12/10/1962 Diagram 50A boiler fitted (number 24257)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 12/05/1924 29/07/1924 79 days General Boiler number D1569 (Diagram 50)
 
Gateshead Works 10/02/1928 27/04/1928 78 days General    
Gateshead Works 10/07/1931 19/08/1931 41 days General    
Darlington Works 27/10/1936 15/12/1936 50 days General Boiler number 2433 (Diagram 50)
 
Darlington Works 21/10/1940 15/11/1940 26 days General Boiler number 3153 (Diagram 50A)
 
Darlington Works 12/03/1943 08/04/1943 28 days General Boiler number 2985 (Diagram 50A)
 
Gateshead Works 07/07/1944 02/08/1944 27 days Light Repair    
Darlington Works 16/01/1945 24/02/1945 40 days Light Repair    
Darlington Works 25/11/1945 19/12/1945 25 days General    
Gateshead Works 31/05/1948 16/06/1948 17 days Light Repair Renumbered to BR 63351
 
Darlington Works 20/04/1949 14/05/1949 25 days General Boiler number 3015 (Diagram 50A)
 
Darlington Works 16/04/1951 05/05/1951 20 days General Boiler number 24184 (Diagram 50A)
 
Darlington Works 01/07/1953 18/07/1953 18 days General Boiler number 24291 (Diagram 50A)
 
Darlington Works 04/08/1953 08/08/1953 5 days Unclassified    
Darlington Works 06/02/1956 01/03/1956 25 days Heavy Intermediate    
Darlington Works 09/02/1959 25/03/1959 45 days General Boiler number 24186 (Diagram 50A)
 
Darlington Works 07/09/1962 12/10/1962 36 days General Boiler number 24257 (Diagram 50A)
 
Darlington Works 17/10/1962 25/10/1962 9 days Unclassified    

Mentions ...
Report Date Title Report Source
31/05/1949 Darlington Works New Work May: Class 'A.1' Nos. 60148 an 60149. No. 60150 was ex the Paint Shop on 14/6, painted green. Locomotives awaiting Works durine May included: Nos. 812, 61069. 1407/15, 61600/61. 62709, 2726/41/56, 5109, 5675, 5784/87, 67317, 7609/19/20, 67708, 67741 (light repair), 8159, 9377, 69824/34/36, Class '8' 79184 an 90001. To scrap yard: Nos. 2377 (frames only), 3275/77, 3300/05/07/34, 65107, 5114, 5602, 65629 an 5703. Locomotives ex Works during May included: Nos. 60955, 61035. 61100 (unlined), 61199, 61224, 62397, 62745/53, 63351/95, 63440, 65040/47/89/92, 65110, 65653/55/59, 65730, 65848, 67319/31, 68061, 69106/11, Class '8' 90662/74. Nos. 60083/86 an 60127 have been noted here painted in the new blue colours with the crest on the tender. SLS/194907

Summary
Date Event Details Source See Also
06/1913 To Service To service as North Eastern Railway Number 1264
Built at Darlington Works, Works Number
Allocated to Tyne Dock (TDK)
Diagram 50 boiler fitted
   
12/05/1924 Works Visit Works Visit - Gateshead Works (General) - Arr: 12/05/1924. Dep: 29/07/1924.
Work undertaken:
Boiler number D1569 (Diagram 50)
   
10/02/1928 Works Visit Works Visit - Gateshead Works (General) - Arr: 10/02/1928. Dep: 27/04/1928.    
10/07/1931 Works Visit Works Visit - Gateshead Works (General) - Arr: 10/07/1931. Dep: 19/08/1931.    
27/10/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 27/10/1936. Dep: 15/12/1936.
Work undertaken:
Boiler number 2433 (Diagram 50)
   
24/06/1937 Allocation Reallocated to Annfield Plain (AFP)    
09/09/1940 Allocation Reallocated to Consett (CON)    
21/10/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 21/10/1940. Dep: 15/11/1940.
Work undertaken:
Boiler number 3153 (Diagram 50A)
   
12/03/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 12/03/1943. Dep: 08/04/1943.
Work undertaken:
Boiler number 2985 (Diagram 50A)
   
07/07/1944 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 07/07/1944. Dep: 02/08/1944.    
16/01/1945 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 16/01/1945. Dep: 24/02/1945.    
25/11/1945 Works Visit Works Visit - Darlington Works (General) - Arr: 25/11/1945. Dep: 19/12/1945.    
29/12/1945 Modification Diagram 50A number 3149 boiler fitted    
07/04/1946 Renumbered Renumbered to 3351    
29/11/1947 Allocation Reallocated to Tyne Dock (TDK)    
31/05/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 31/05/1948. Dep: 16/06/1948.
Work undertaken:
Renumbered to BR 63351
   
13/02/1949 Allocation Reallocated to Middlesbrough (MID)    
19/02/1949 Allocation Reallocated to Middlesbrough (MID)    
20/04/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 20/04/1949. Dep: 14/05/1949.
Work undertaken:
Boiler number 3015 (Diagram 50A)
   
16/04/1951 Works Visit Works Visit - Darlington Works (General) - Arr: 16/04/1951. Dep: 05/05/1951.
Work undertaken:
Boiler number 24184 (Diagram 50A)
   
01/07/1953 Works Visit Works Visit - Darlington Works (General) - Arr: 01/07/1953. Dep: 18/07/1953.
Work undertaken:
Boiler number 24291 (Diagram 50A)
   
04/08/1953 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 04/08/1953. Dep: 08/08/1953.    
29/08/1954 Allocation Reallocated to West Auckland (51F)    
06/02/1956 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 06/02/1956. Dep: 01/03/1956.    
09/02/1959 Works Visit Works Visit - Darlington Works (General) - Arr: 09/02/1959. Dep: 25/03/1959.
Work undertaken:
Boiler number 24186 (Diagram 50A)
   
07/09/1962 Works Visit Works Visit - Darlington Works (General) - Arr: 07/09/1962. Dep: 12/10/1962.
Work undertaken:
Boiler number 24257 (Diagram 50A)
   
17/10/1962 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 17/10/1962. Dep: 25/10/1962.    
24/11/1963 Allocation Reallocated to West Hartlepool (51C)    
18/01/1965 Withdrawn Condemned as 63351 from West Hartlepool (51C)    

prev prev