Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 7 Online
» 800 Today
» 4616 Yesterday
» 31450 Week
» 130095 Month
» 332759 Year
» 3359612 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 1262 m/e 04/1913
London and North Eastern Railway (1946) 3350   28/04/1946
British Railways 63350 w/e 22/05/1948

Locomotive Specifics
Designer V. Raven
Class Q6
Company History NER/LNER
Rebuild History
ClassFrom
Q604/1913
Wheels 0-8-0
Builder Darlington Works
Order Number 441A
Fittings (as built)
Engine Brakes Steam
To Service During 04/1913 to Tyne Dock (TDK)
Withdrawal Tue 18/06/1963 off Tyne Dock (52H)
Service Life 50 yrs, 2 mths , 18 dys

Disposal

Notes
Notes Into Darlington for cutting up 5/7/63

Allocations
Code Subsequent Codes Name From Date
TDK   Tyne Dock (New) m/e 04/1913
AFP   Annfield Plain on 08/03/1924
TDK   Tyne Dock m/e 01/1925
AFP   Annfield Plain m/e 01/1927
TDK   Tyne Dock on 14/10/1929
EHL   East Hartlepool on 18/06/1931
HLD   Hull Dairycoates on 01/03/1937
YK   York (North) on 06/01/1940
NEV   Neville Hill on 28/03/1943
DAR   Darlington on 26/06/1943
NEV   Neville Hill on 24/08/1944
NPT   Newport (Teeside) on 23/07/1945
BOR   Borough Gardens on 13/02/1948
BOR   Borough Gardens w/e 21/02/1948
52H   Tyne Dock on 14/06/1959
     Withdrawn on 18/06/1963

SLS Allocations*
Type Code Name From Date
ALLOC BOR Borough Gardens w/e 21/02/1948
ALLOC 54B Tyne Dock on 14/06/1959
WDN   on 18/06/1963

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
04/1913 Diagram 50 boiler fitted (number D185)
25/02/1931 Diagram 50 boiler fitted (number D539)
18/04/1936 Diagram 50 boiler fitted (number AW13)
16/09/1939 Diagram 50 boiler fitted (number 2260)
20/01/1943 Diagram 50 boiler fitted (number 2862)
04/01/1947 Diagram 50 boiler fitted (number 988)
04/01/1947 Diagram 50 boiler fitted (number HL109)
29/04/1950 Diagram 50 boiler fitted (number 2423)
08/11/1952 Diagram 50A boiler fitted (number 24239)
05/09/1958 Diagram 50A boiler fitted (number 24214)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gateshead Works 1921 11/1921   General    
Gateshead Works 26/11/1925 27/05/1926 183 days General    
Gateshead Works 30/07/1928 12/09/1928 45 days Light Repair    
Gateshead Works 19/12/1928 17/01/1929 30 days Light Repair    
Gateshead Works 13/01/1931 25/02/1931 44 days General Boiler number D539 (Diagram 50)
 
Darlington Works 04/02/1936 18/04/1936 75 days General Boiler number AW13 (Diagram 50)
 
Darlington Works 19/08/1939 16/09/1939 29 days General Boiler number 2260 (Diagram 50)
 
Darlington Works 19/12/1942 20/01/1943 33 days General Boiler number 24230 (Diagram 50)
 
Gateshead Works 17/09/1945 08/10/1945 22 days Light Repair    
Darlington Works 19/11/1946 04/01/1947 47 days General Boiler number 988 (Diagram 50)
 
Darlington Works 10/01/1947 16/01/1947 7 days Unclassified    
Gateshead Works 03/05/1948 19/05/1948 17 days Light Repair Renumbered to BR 63350
 
Darlington Works 05/04/1950 29/04/1950 25 days General Boiler number 2423 (Diagram 50)
 
Darlington Works 01/05/1950 09/05/1950 9 days Unclassified    
Darlington Works 14/10/1952 08/11/1952 26 days General Boiler number 24239 (Diagram 50A)
 
Darlington Works 15/04/1955 12/05/1955 28 days Heavy Intermediate    
Darlington Works 19/05/1955 26/05/1955 8 days Unclassified    
Darlington Works 22/09/1955 26/09/1955 5 days Unclassified    
Darlington Works 01/10/1957 03/10/1957 3 days Light Casual    
Gateshead Works 04/08/1958 05/09/1958 33 days General Boiler number 24214 (Diagram 50A)
 
Darlington Works 28/12/1960 13/02/1961 48 days Heavy Casual    

Summary
Date Event Details Source See Also
04/1913 To Service To service as North Eastern Railway Number 1262
Built at Darlington Works, Works Number
Allocated to Tyne Dock (TDK)
Diagram 50 boiler fitted
   
1921 Works Visit Works Visit - Gateshead Works (General) - Arr: ?/1921. Dep: ?/11/1921.    
08/03/1924 Allocation Reallocated to Annfield Plain (AFP)    
01/1925 Allocation Reallocated to Tyne Dock (TDK)    
26/11/1925 Works Visit Works Visit - Gateshead Works (General) - Arr: 26/11/1925. Dep: 27/05/1926.    
01/1927 Allocation Reallocated to Annfield Plain (AFP)    
30/07/1928 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 30/07/1928. Dep: 12/09/1928.    
19/12/1928 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 19/12/1928. Dep: 17/01/1929.    
14/10/1929 Allocation Reallocated to Tyne Dock (TDK)    
13/01/1931 Works Visit Works Visit - Gateshead Works (General) - Arr: 13/01/1931. Dep: 25/02/1931.
Work undertaken:
Boiler number D539 (Diagram 50)
   
18/06/1931 Allocation Reallocated to East Hartlepool (EHL)    
04/02/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 04/02/1936. Dep: 18/04/1936.
Work undertaken:
Boiler number AW13 (Diagram 50)
   
01/03/1937 Allocation Reallocated to Hull Dairycoates (HLD)    
19/08/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 19/08/1939. Dep: 16/09/1939.
Work undertaken:
Boiler number 2260 (Diagram 50)
   
06/01/1940 Allocation Reallocated to York (North) (YK)    
19/12/1942 Works Visit Works Visit - Darlington Works (General) - Arr: 19/12/1942. Dep: 20/01/1943.
Work undertaken:
Boiler number 24230 (Diagram 50)
   
28/03/1943 Allocation Reallocated to Neville Hill (NEV)    
26/06/1943 Allocation Reallocated to Darlington (DAR)    
24/08/1944 Allocation Reallocated to Neville Hill (NEV)    
23/07/1945 Allocation Reallocated to Newport (Teeside) (NPT)    
17/09/1945 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 17/09/1945. Dep: 08/10/1945.    
28/04/1946 Renumbered Renumbered to 3350    
19/11/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 19/11/1946. Dep: 04/01/1947.
Work undertaken:
Boiler number 988 (Diagram 50)
   
10/01/1947 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 10/01/1947. Dep: 16/01/1947.    
13/02/1948 Allocation Reallocated to Borough Gardens (BOR)    
21/02/1948 Allocation Reallocated to Borough Gardens (BOR)    
03/05/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 03/05/1948. Dep: 19/05/1948.
Work undertaken:
Renumbered to BR 63350
   
05/04/1950 Works Visit Works Visit - Darlington Works (General) - Arr: 05/04/1950. Dep: 29/04/1950.
Work undertaken:
Boiler number 2423 (Diagram 50)
   
01/05/1950 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 01/05/1950. Dep: 09/05/1950.    
14/10/1952 Works Visit Works Visit - Darlington Works (General) - Arr: 14/10/1952. Dep: 08/11/1952.
Work undertaken:
Boiler number 24239 (Diagram 50A)
   
15/04/1955 Works Visit Works Visit - Darlington Works (Heavy Intermediate) - Arr: 15/04/1955. Dep: 12/05/1955.    
19/05/1955 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 19/05/1955. Dep: 26/05/1955.    
22/09/1955 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 22/09/1955. Dep: 26/09/1955.    
01/10/1957 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 01/10/1957. Dep: 03/10/1957.    
04/08/1958 Works Visit Works Visit - Gateshead Works (General) - Arr: 04/08/1958. Dep: 05/09/1958.
Work undertaken:
Boiler number 24214 (Diagram 50A)
   
14/06/1959 Allocation Reallocated to Tyne Dock (52H)    
28/12/1960 Works Visit Works Visit - Darlington Works (Heavy Casual) - Arr: 28/12/1960. Dep: 13/02/1961.    
18/06/1963 Withdrawn Condemned as 63350 from Tyne Dock (52H)    

prev prev