Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 20 Online
» 2261 Today
» 4397 Yesterday
» 20064 Week
» 73080 Month
» 192607 Year
» 3219460 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 1320 m/e 03/1902
London and North Eastern Railway (1946) 3263   14/04/1946
British Railways 63263   Not applied

Locomotive Specifics
Designer W. Worsdell
Class Q5
Company History NER/LNER
Rebuild History
ClassFrom
Q5/103/1902
Q5/2 (0-8-0)15/05/1934
Wheels 0-8-0
Builder Gateshead Works
Order Number A139
Works Number 3 02
Fittings (as built)
Engine Brakes Steam
To Service During 03/1902 to Newport (Teeside) (NPT)
Withdrawal Mon 01/11/1948 off Middlesbrough (MID)
Service Life 46 yrs, 8 mths , 3 dys
Information Slide valves

Disposal
Scrapping During 12/1948 at Locomotive Works (Darlington)

Notes
Notes Cut up at BRW07

Allocations
Code Subsequent Codes Name From Date
NPT   Newport (Teeside) (New) m/e 03/1902
MID   Middlesbrough on 07/11/1938
     Withdrawn on 01/11/1948

SLS Allocations*
Type Code Name From Date
WDN MID Middlesbrough on 01/11/1948

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
03/1902 Diagram 56 boiler fitted (number G159)
07/04/1912 Diagram 56 boiler fitted (number G182)
07/1919 Diagram 56 boiler fitted (number D882)
15/05/1934 Diagram 56A boiler fitted (number D1815)
05/06/1936 Diagram 56A boiler fitted (number D1670)
08/11/1941 Diagram 56A boiler fitted (number D1997)
14/09/1946 Diagram 56A boiler fitted (number D1674)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
  1912 04/1912   General    
  1919 07/1919   General Boiler number D882 (Diagram 56)
 
Darlington Works 01/04/1924 31/05/1924 61 days General    
Darlington Works 01/07/1927 11/10/1927 103 days General    
Darlington Works 11/09/1930 24/10/1930 44 days General    
Darlington Works 10/01/1933 23/01/1933 14 days Light Repair    
Darlington Works 19/04/1934 15/05/1934 27 days General Boiler number D1815 (Diagram 56A)
 
Darlington Works 27/02/1936 05/06/1936 100 days General Boiler number D1670 (Diagram 56A)
 
Darlington Works 02/02/1939 22/03/1939 49 days General    
Darlington Works 09/12/1940 19/12/1940 11 days Unclassified    
Darlington Works 06/10/1941 08/11/1941 34 days General Boiler number D1997 (Diagram 56A)
 
Darlington Works 17/01/1944 03/03/1944 47 days General    
Gateshead Works 27/06/1945 21/07/1945 25 days Light Repair    
Darlington Works 13/07/1946 14/09/1946 64 days General Boiler number D1674 (Diagram 56A)
 
Darlington Works 21/09/1946 24/09/1946 4 days Unclassified    
Darlington Works 05/10/1948 05/10/1948 1 day No repairs    

Summary
Date Event Details Source See Also
03/1902 To Service To service as North Eastern Railway Number 1320
Built at Gateshead Works, Works Number 3 02
Allocated to Newport (Teeside) (NPT)
Diagram 56 boiler fitted
   
07/04/1912 Modification Diagram 56 number G182 boiler fitted    
01/04/1924 Works Visit Works Visit - Darlington Works (General) - Arr: 01/04/1924. Dep: 31/05/1924.    
01/07/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 01/07/1927. Dep: 11/10/1927.    
11/09/1930 Works Visit Works Visit - Darlington Works (General) - Arr: 11/09/1930. Dep: 24/10/1930.    
10/01/1933 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 10/01/1933. Dep: 23/01/1933.    
19/04/1934 Works Visit Works Visit - Darlington Works (General) - Arr: 19/04/1934. Dep: 15/05/1934.
Work undertaken:
Boiler number D1815 (Diagram 56A)
   
27/02/1936 Works Visit Works Visit - Darlington Works (General) - Arr: 27/02/1936. Dep: 05/06/1936.
Work undertaken:
Boiler number D1670 (Diagram 56A)
   
07/11/1938 Allocation Reallocated to Middlesbrough (MID)    
02/02/1939 Works Visit Works Visit - Darlington Works (General) - Arr: 02/02/1939. Dep: 22/03/1939.    
09/12/1940 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 09/12/1940. Dep: 19/12/1940.    
06/10/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 06/10/1941. Dep: 08/11/1941.
Work undertaken:
Boiler number D1997 (Diagram 56A)
   
17/01/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 17/01/1944. Dep: 03/03/1944.    
27/06/1945 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 27/06/1945. Dep: 21/07/1945.    
14/04/1946 Renumbered Renumbered to 3263    
13/07/1946 Works Visit Works Visit - Darlington Works (General) - Arr: 13/07/1946. Dep: 14/09/1946.
Work undertaken:
Boiler number D1674 (Diagram 56A)
   
21/09/1946 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 21/09/1946. Dep: 24/09/1946.    
05/10/1948 Works Visit Works Visit - Darlington Works (No repairs) - Arr: 05/10/1948. Dep: 05/10/1948.    
01/11/1948 Withdrawn Condemned as 3263 from Middlesbrough (MID)    
12/1948 Scrapped Broken up by Locomotive Works: Darlington    
1949 Number Allocated Allocated number 63263 but not taken up    

prev prev