Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 3 Online
» 349 Today
» 4397 Yesterday
» 18152 Week
» 71168 Month
» 190695 Year
» 3217548 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 3092 on 21/05/1941
London and North Eastern Railway (1946) 4982   05/07/1946
British Railways 64982   14/05/1949

Locomotive Specifics
Designer N. Gresley
Class J39
Company History LNER
Wheels 0-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 1860
Fittings (as built)
Engine Brakes Vacuum
To Service Mon 21/05/1941 to St Margarets (STM)
Withdrawal Mon 03/12/1962 off West Auckland (51F)
Service Life 21 yrs, 6 mths , 12 dys

Disposal
Scrapping During 01/1963

Notes
Notes Cut up at Darlington

Allocations
Code Subsequent Codes Name From Date
STM   St Margarets (New) on 21/05/1941
DAR   Darlington on 03/05/1944
BLA   Blaydon on 29/08/1948
BLA   Blaydon w/e 04/09/1948
TWD   Tweedmouth on 23/05/1949
TWD   Tweedmouth w/e 29/10/1949
51A   Darlington on 19/11/1950
51A   Darlington m/e 30/11/1950
51F   West Auckland on 31/08/1952
51F   West Auckland 4w/e 06/09/1952
     Withdrawn on 03/12/1962

SLS Allocations*
Type Code Name From Date
ALLOC BLA Blaydon w/e 04/09/1948
ALLOC TWD Tweedmouth w/e 29/10/1949
ALLOC 51A Darlington m/e 30/11/1950
ALLOC 51F West Auckland 4w/e 06/09/1952
WDN   on 03/12/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
10/09/1955 Diagram 97 boiler fitted (number 27587)
13/02/1959 Diagram 97 boiler fitted (number 27539)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Cowlairs Works 10/09/1942 12/09/1942 3 days Unclassified    
Cowlairs Works 29/06/1943 23/07/1943 25 days General    
Cowlairs Works 17/06/1946 06/07/1946 20 days General Boiler number 27485 (Diagram 97)
Renumbered to LNER (1946) number 4982
 
Gateshead Works 23/11/1947 16/12/1947 24 days Light Repair    
Cowlairs Works 11/03/1949 14/05/1949 65 days General Renumbered to BR 64982
 
Cowlairs Works 01/07/1952 18/07/1952 18 days Light Intermediate    
Cowlairs Works 12/08/1955 10/09/1955 30 days General Boiler number 27587 (Diagram 97)
 
Cowlairs Works 19/12/1956 18/01/1957 31 days Light Casual    
Cowlairs Works 16/01/1959 13/02/1959 29 days General Boiler number 27539 (Diagram 97)
 

Mentions ...
Report Date Title Report Source
14/07/1962 Darlington MPD (Awaiting Works) Stored: 43070 (51L), 43101 (51L), 65768, 65772, 65773, 69002 (51A), 78015 (51J). Ex Works: 43014 (50A), 43125 (50B), 60834 (62B), 60944 (52B), 60973 (63A), 62004 (51A), 63389 (51L), 68043 (51A), 90011 (51A), 90273 (51L), 90430 (51A), 92098 (52H). Awaiting Works: 42639 (50F), 43134 (66D), 46494 (31A), 60818 (64A), 64706 (52G), 64713, 64730 (51L), 64757 (51L), 64758 (51L), 64821 (51L), 64835 (51F), 64848 (51F), 64982 (51F), 65670, 65761, 65776. Visitors : D12 (55H), 42553 (50A), 60040 (52A). SLS/196209

Summary
Date Event Details Source See Also
21/05/1941 To Service To service as London and North Eastern Railway Number 3092
Built at Darlington Works, Works Number 1860
Allocated to St Margarets (STM)
Diagram 97 boiler fitted
   
10/09/1942 Works Visit Works Visit - Cowlairs Works (Unclassified) - Arr: 10/09/1942. Dep: 12/09/1942.    
29/06/1943 Works Visit Works Visit - Cowlairs Works (General) - Arr: 29/06/1943. Dep: 23/07/1943.    
03/05/1944 Allocation Reallocated to Darlington (DAR)    
17/06/1946 Works Visit Works Visit - Cowlairs Works (General) - Arr: 17/06/1946. Dep: 06/07/1946.
Work undertaken:
Boiler number 27485 (Diagram 97)
Renumbered to LNER (1946) number 4982
   
23/11/1947 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 23/11/1947. Dep: 16/12/1947.    
29/08/1948 Allocation Reallocated to Blaydon (BLA)    
04/09/1948 Allocation Reallocated to Blaydon (BLA)    
11/03/1949 Works Visit Works Visit - Cowlairs Works (General) - Arr: 11/03/1949. Dep: 14/05/1949.
Work undertaken:
Renumbered to BR 64982
   
23/05/1949 Allocation Reallocated to Tweedmouth (TWD)    
29/10/1949 Allocation Reallocated to Tweedmouth (TWD)    
19/11/1950 Allocation Reallocated to Darlington (51A)    
30/11/1950 Allocation Reallocated to Darlington (51A)    
01/07/1952 Works Visit Works Visit - Cowlairs Works (Light Intermediate) - Arr: 01/07/1952. Dep: 18/07/1952.    
31/08/1952 Allocation Reallocated to West Auckland (51F)    
06/09/1952 Allocation Reallocated to West Auckland (51F)    
12/08/1955 Works Visit Works Visit - Cowlairs Works (General) - Arr: 12/08/1955. Dep: 10/09/1955.
Work undertaken:
Boiler number 27587 (Diagram 97)
   
19/12/1956 Works Visit Works Visit - Cowlairs Works (Light Casual) - Arr: 19/12/1956. Dep: 18/01/1957.    
16/01/1959 Works Visit Works Visit - Cowlairs Works (General) - Arr: 16/01/1959. Dep: 13/02/1959.
Work undertaken:
Boiler number 27539 (Diagram 97)
   
03/12/1962 Withdrawn Condemned as 64982 from West Auckland (51F)    
01/1963 Scrapped Scrapped    

prev prev