Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 2052 Today
» 4720 Yesterday
» 25683 Week
» 90637 Month
» 293301 Year
» 3320154 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 1997 on 24/08/1938
London and North Eastern Railway (1946) 4970   03/11/1946
British Railways 64970   25/09/1948

Locomotive Specifics
Designer N. Gresley
Class J39
Company History LNER
Wheels 0-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 1769
Fittings (as built)
Engine Brakes Vacuum
To Service Wed 24/08/1938 to Ipswich (IPS)
Withdrawal Wed 24/05/1961 off Retford Thrumpton (G.C.) (36E)
Service Life 22 yrs , 9 mths

Disposal
Scrapping During 06/1961

Notes
Notes Cut up at Doncaster

Allocations
Code Subsequent Codes Name From Date
IPS   Ipswich (New) on 24/08/1938
MAR   March on 10/05/1939
GRA   Grantham on 30/04/1942
NWE   New England on 01/08/1945
RET   Retford Thrumpton (G.C.) on 06/10/1946
     Withdrawn on 24/05/1961

SLS Allocations*
Type Code Name From Date
WDN   on 25/05/1961

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
24/08/1938 Diagram 97 boiler fitted (number 2945)
04/01/1941 Diagram 97 boiler fitted (number E1351)
18/12/1943 Diagram 97 boiler fitted (number 4907)
12/01/1946 Diagram 97 boiler fitted (number 2097)
25/09/1948 Diagram 97 boiler fitted (number 3208)
14/08/1954 Diagram 97 boiler fitted (number 27687)
25/05/1957 Diagram 97 boiler fitted (number 27884)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gorton Works 02/12/1940 04/01/1941 34 days General Boiler number E1351 (Diagram 97)
 
Gorton Works 15/01/1941 20/01/1941 6 days Unclassified    
Gorton Works 17/06/1943 20/07/1943 34 days General    
Gorton Works 02/12/1943 18/12/1943 17 days Heavy Boiler number 4907 (Diagram 97)
 
Gorton Works 04/10/1945 12/01/1946 101 days General Boiler number 2097 (Diagram 97)
 
Gorton Works 15/08/1948 25/09/1948 42 days General Boiler number 27697 (Diagram 97)
Renumbered to BR 64970
 
Gorton Works 25/01/1950 04/03/1950 39 days Light Casual    
Derby Works 16/03/1952 22/04/1952 38 days Heavy Intermediate    
Stratford Works 20/06/1954 14/08/1954 56 days General Boiler number 27687 (Diagram 97)
 
Gorton Works 28/04/1957 25/05/1957 28 days General Boiler number 27884 (Diagram 97)
 

Mentions ...
Report Date Title Report Source
28/05/1961 Doncaster Works (Scrap Road) New Erecting Shop: D2392-4, D3489, E3062-7. Boiler Shop: E3068-70. Stripping Road: D2402, 60007/73, 60119/61, 61327, 61844/93, 61904/85/97, 62059, 63967, 70023. Scrap Road: 63947/58, 64970, 68916/29, 69561 all intact, with 63952 just cut up. Crimpsall: 70027, 73016. Outside Crimpsall: DEPT7, 60065. Erecting Shops: D2026, D2234, D3129/52, D3445, D5534/71, 12124, 13252, 13325, 43088, 43152/5, 60013/24/33/88/99, 60525, 61095, 61190, 61249, 61300/70, 61832, 62051, 63963, 70001/5/35. Outside Erecting Shops: 60017, 61845. Outside Weigh House: 43091, 60137, 62047. Paint Shop: D2390/1, D5698, D6715, D8215, D9004/5, E3056/61, 60038/9, 61122/88, 63938, 76031. Outside Paint Shop: D345/6. Works Shunters: DEPT10/1. SLS/196107

Summary
Date Event Details Source See Also
24/08/1938 To Service To service as London and North Eastern Railway Number 1997
Built at Darlington Works, Works Number 1769
Allocated to Ipswich (IPS)
Diagram 97 boiler fitted
   
10/05/1939 Allocation Reallocated to March (MAR)    
02/12/1940 Works Visit Works Visit - Gorton Works (General) - Arr: 02/12/1940. Dep: 04/01/1941.
Work undertaken:
Boiler number E1351 (Diagram 97)
   
15/01/1941 Works Visit Works Visit - Gorton Works (Unclassified) - Arr: 15/01/1941. Dep: 20/01/1941.    
30/04/1942 Allocation Reallocated to Grantham (GRA)    
17/06/1943 Works Visit Works Visit - Gorton Works (General) - Arr: 17/06/1943. Dep: 20/07/1943.    
02/12/1943 Works Visit Works Visit - Gorton Works (Heavy) - Arr: 02/12/1943. Dep: 18/12/1943.
Work undertaken:
Boiler number 4907 (Diagram 97)
   
01/08/1945 Allocation Reallocated to New England (NWE)    
04/10/1945 Works Visit Works Visit - Gorton Works (General) - Arr: 04/10/1945. Dep: 12/01/1946.
Work undertaken:
Boiler number 2097 (Diagram 97)
   
06/10/1946 Allocation Reallocated to Retford Thrumpton (G.C.) (RET)    
03/11/1946 Renumbered Renumbered to 4970    
15/08/1948 Works Visit Works Visit - Gorton Works (General) - Arr: 15/08/1948. Dep: 25/09/1948.
Work undertaken:
Boiler number 27697 (Diagram 97)
Renumbered to BR 64970
   
25/01/1950 Works Visit Works Visit - Gorton Works (Light Casual) - Arr: 25/01/1950. Dep: 04/03/1950.    
16/03/1952 Works Visit Works Visit - Derby Works (Heavy Intermediate) - Arr: 16/03/1952. Dep: 22/04/1952.    
20/06/1954 Works Visit Works Visit - Stratford Works (General) - Arr: 20/06/1954. Dep: 14/08/1954.
Work undertaken:
Boiler number 27687 (Diagram 97)
   
28/04/1957 Works Visit Works Visit - Gorton Works (General) - Arr: 28/04/1957. Dep: 25/05/1957.
Work undertaken:
Boiler number 27884 (Diagram 97)
   
24/05/1961 Withdrawn Condemned as 64970 from Retford Thrumpton (G.C.) (36E)    
06/1961 Scrapped Scrapped    

prev prev