Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 9 Online
» 590 Today
» 4658 Yesterday
» 5248 Week
» 70202 Month
» 272866 Year
» 3299719 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 1896 on 21/04/1938
London and North Eastern Railway (1946) 4949   06/07/1946
British Railways 64949   26/11/1948

Locomotive Specifics
Designer N. Gresley
Class J39
Company History LNER
Wheels 0-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 1746
Fittings (as built)
Engine Brakes Vacuum
To Service Wed 21/04/1938 to Carlisle Canal (CAR)
Withdrawal Wed 22/08/1962 off Alnmouth (52d)
Service Life 24 yrs, 4 mths , 1 dy

Disposal
Scrapping During 11/1962

Notes
Notes Cut up at Cowlairs

Allocations
Code Subsequent Codes Name From Date
CAR   Carlisle Canal (New) on 21/04/1938
CON   Consett on 20/10/1940
DAR   Darlington on 28/03/1943
TWD   Tweedmouth on 04/01/1948
TWD   Tweedmouth w/e 10/01/1948
BLA   Blaydon on 24/02/1948
BLA   Blaydon w/e 28/02/1948
50B   Neville Hill on 20/08/1950
53A   Hull Dairycoates on 13/06/1954
52B   Heaton on 16/06/1957
52d   Alnmouth on 11/05/1958
     Withdrawn on 22/08/1962

SLS Allocations*
Type Code Name From Date
ALLOC TWD Tweedmouth w/e 10/01/1948
ALLOC BLA Blaydon w/e 28/02/1948
ALLOC 50B Neville Hill w/e 20/08/1950
ALLOC 53A Hull Dairycoates 4w/e 19/06/1954
ALLOC 52B Heaton 4w/e 13/07/1957
ALLOC ALN   4w/e 17/05/1958
WDN   on 22/08/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
21/04/1938 Diagram 97 boiler fitted (number 4904)
09/05/1940 Diagram 97 boiler fitted (number C1720)
10/02/1943 Diagram 97 boiler fitted (number 2597)
06/07/1946 Diagram 97 boiler fitted (number C1717)
26/11/1948 Diagram 97 boiler fitted (number 2842)
16/04/1954 Diagram 97 boiler fitted (number 27511)
01/12/1956 Diagram 97 boiler fitted (number 27592)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Cowlairs Works 10/04/1940 09/05/1940 30 days General Boiler number C1720 (Diagram 97)
 
Darlington Works 25/08/1941 18/09/1941 25 days Light Repair    
Darlington Works 08/01/1943 10/02/1943 34 days General Boiler number 2597 (Diagram 97)
 
Gateshead Works 12/12/1944 04/01/1945 24 days Light Repair    
Cowlairs Works 08/06/1946 06/07/1946 29 days General Boiler number C1717 (Diagram 97)
Renumbered to LNER (1946) number 4949
 
Cowlairs Works 28/10/1948 26/11/1948 30 days General Boiler number 27533 (Diagram 97)
Renumbered to BR 64949
 
Cowlairs Works 20/04/1951 12/05/1951 23 days Heavy Intermediate    
Cowlairs Works 04/11/1952 22/11/1952 19 days Light Casual    
Cowlairs Works 17/03/1954 16/04/1954 31 days General Boiler number 27511 (Diagram 97)
 

Summary
Date Event Details Source See Also
21/04/1938 To Service To service as London and North Eastern Railway Number 1896
Built at Darlington Works, Works Number 1746
Allocated to Carlisle Canal (CAR)
Diagram 97 boiler fitted
   
10/04/1940 Works Visit Works Visit - Cowlairs Works (General) - Arr: 10/04/1940. Dep: 09/05/1940.
Work undertaken:
Boiler number C1720 (Diagram 97)
   
20/10/1940 Allocation Reallocated to Consett (CON)    
25/08/1941 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 25/08/1941. Dep: 18/09/1941.    
08/01/1943 Works Visit Works Visit - Darlington Works (General) - Arr: 08/01/1943. Dep: 10/02/1943.
Work undertaken:
Boiler number 2597 (Diagram 97)
   
28/03/1943 Allocation Reallocated to Darlington (DAR)    
12/12/1944 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 12/12/1944. Dep: 04/01/1945.    
08/06/1946 Works Visit Works Visit - Cowlairs Works (General) - Arr: 08/06/1946. Dep: 06/07/1946.
Work undertaken:
Boiler number C1717 (Diagram 97)
Renumbered to LNER (1946) number 4949
   
04/01/1948 Allocation Reallocated to Tweedmouth (TWD)    
10/01/1948 Allocation Reallocated to Tweedmouth (TWD)    
24/02/1948 Allocation Reallocated to Blaydon (BLA)    
28/02/1948 Allocation Reallocated to Blaydon (BLA)    
28/10/1948 Works Visit Works Visit - Cowlairs Works (General) - Arr: 28/10/1948. Dep: 26/11/1948.
Work undertaken:
Boiler number 27533 (Diagram 97)
Renumbered to BR 64949
   
20/08/1950 Allocation Reallocated to Neville Hill (50B)    
20/04/1951 Works Visit Works Visit - Cowlairs Works (Heavy Intermediate) - Arr: 20/04/1951. Dep: 12/05/1951.    
04/11/1952 Works Visit Works Visit - Cowlairs Works (Light Casual) - Arr: 04/11/1952. Dep: 22/11/1952.    
17/03/1954 Works Visit Works Visit - Cowlairs Works (General) - Arr: 17/03/1954. Dep: 16/04/1954.
Work undertaken:
Boiler number 27511 (Diagram 97)
   
13/06/1954 Allocation Reallocated to Hull Dairycoates (53A)    
01/12/1956 Modification Diagram 97 number 27592 boiler fitted    
16/06/1957 Allocation Reallocated to Heaton (52B)    
11/05/1958 Allocation Reallocated to Alnmouth (52d)    
22/08/1962 Withdrawn Condemned as 64949 from Alnmouth (52D.1)    
11/1962 Scrapped Scrapped    

prev prev