Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 13 Online
» 388 Today
» 5422 Yesterday
» 21422 Week
» 120067 Month
» 322731 Year
» 3349584 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 1869 on 06/10/1936
London and North Eastern Railway (1946) 4912 on 17/03/1946
British Railways 64912   13/08/1948

Locomotive Specifics
Designer N. Gresley
Class J39
Company History LNER
Wheels 0-6-0
Builder Beyer Peacock Ltd.
Order Number 1529
Works Number 6809
Fittings (as built)
Engine Brakes Vacuum
To Service Sat 06/10/1936 to Gorton (GOR)
Withdrawal Sat 05/12/1959 off Carlisle Canal (12C)
Service Life 23 yrs, 1 mth , 29 dys

Disposal
Scrapping During 12/1959

Notes
Notes Cut up at Cowlairs

Allocations
Code Subsequent Codes Name From Date
GOR   Gorton (New) on 06/10/1936
STR   Stratford on 14/11/1936
IPS   Ipswich on 22/10/1941
LOW   Lowestoft on 06/10/1946
CAR   Carlisle Canal on 24/03/1947
     Withdrawn on 05/12/1959

SLS Allocations*
Type Code Name From Date
ALLOC LOW Lowestoft w/e 12/10/1946
ALLOC CAR Carlisle Canal on 24/03/1947
WDN   w/e 05/12/1959

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/10/1936 Diagram 97 boiler fitted (number E1357)
26/07/1939 Diagram 97 boiler fitted (number BP139)
05/08/1943 Diagram 97 boiler fitted (number 2595)
05/09/1946 Diagram 97 boiler fitted (number 2691)
11/08/1950 Diagram 97 boiler fitted (number C2023)
11/03/1955 Diagram 97 boiler fitted (number 27486)
07/06/1958 Diagram 97 boiler fitted (number 27473)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gorton Works 07/07/1939 26/07/1939 20 days General Boiler number BP139 (Diagram 97)
 
Cowlairs Works 01/06/1943 05/08/1943 66 days General Boiler number 2595 (Diagram 97)
 
Stratford Works 22/10/1945 24/10/1945 3 days Light Casual    
Stratford Works 12/08/1946 05/09/1946 25 days Heavy Boiler number 2691 (Diagram 97)
 
Cowlairs Works 05/07/1948 13/08/1948 40 days General Renumbered to BR 64912
 
Cowlairs Works 21/06/1950 11/08/1950 52 days General Boiler number C2023 (Diagram 97)
 
Cowlairs Works 07/10/1952 26/10/1952 20 days Heavy Intermediate    
Cowlairs Works 19/10/1953 24/11/1953 37 days Heavy Casual    
Cowlairs Works 14/02/1955 11/03/1955 26 days General Boiler number 27486 (Diagram 97)
 
Cowlairs Works 12/12/1956 19/01/1957 39 days Heavy Intermediate    
Cowlairs Works 09/05/1958 07/06/1958 30 days General Boiler number 27473 (Diagram 97)
 
Cowlairs Works 29/11/1959 30/11/1959 2 days Unclassified    

Mentions ...
Report Date Title Report Source
24/08/1947 Cowlairs Works On 24/8 the following withdrawn locos. were in the Works yard: 'Dl' 2212, 'D29' 2415 and 'D31' 2068, the last two having been stripped; whilst those seen here newly painted were: 'D29' 2411 (green), 'J37' 4617 and 'J39' 4704. Locos. awaiting works, some of which had been stripped were: 'J39' 4711, 4817/40/49/65, 4919/22/28/42; 'K2' 1732/46/51/68/91; 'K3' 1879; 'D1' 2216; 'Dll' 2691; 'J38' 5909; 'J36' 5223/61; 'J35' 4503; 'J37' 4546/48/65/67, 4607/15; 'D31' 2059; 'D34' 2489; 'C15' 7453/65/66, 'N14' 9121; 'N15' 9191, 9214. The Erecting Shop was full and included: 'K2' 1720/34/52; 'K3' 1855; 'J39' 4912/16; 'J38' 5901/12; 'Dll' 2684/87 and 'Y9' 8120/22. SLS/194710
08/10/1948 Doncaster Works Locomotives noted ready to leave Works were Nos. 60007, painted garter blue; 60516, green; 61120, black and lined, while 60877, 60961, 61804 an 63479 were plain black. Locomotives awaiting Works included:-Nos. 48, 1121 an 1902 while those under heavy repair included Nos. 8, 18, 19. 37, 78, 98, 513/19, 932/62, 1092, 1107/24, 1869, 2116, 7350 an 9999. Condemned locomotives on the dump were:-Nos. 2126/98 an 4107. Withdrawn 'C.1' Class Nos. 3274 an 3285, fitted with tall chimneys, extra- coal space, etc., were noted supplying steam to the Crimpsall Erecting Shop; it also appeared that Nos. 2821 (3293) and 4419 might also be similarly fitted and soon put to a similar use where required. It is understood that sixteen of the new 'A.1's' are to be built at Doncaster and twenty-three at Darlington. SLS/194812

Summary
Date Event Details Source See Also
06/10/1936 To Service To service as London and North Eastern Railway Number 1869
Built at Beyer Peacock Ltd., Works Number 6809
Allocated to Gorton (GOR)
Diagram 97 boiler fitted
   
14/11/1936 Allocation Reallocated to Stratford (STR)    
07/07/1939 Works Visit Works Visit - Gorton Works (General) - Arr: 07/07/1939. Dep: 26/07/1939.
Work undertaken:
Boiler number BP139 (Diagram 97)
   
22/10/1941 Allocation Reallocated to Ipswich (IPS)    
01/06/1943 Works Visit Works Visit - Cowlairs Works (General) - Arr: 01/06/1943. Dep: 05/08/1943.
Work undertaken:
Boiler number 2595 (Diagram 97)
   
22/10/1945 Works Visit Works Visit - Stratford Works (Light Casual) - Arr: 22/10/1945. Dep: 24/10/1945.    
17/03/1946 Renumbered Renumbered to 4912    
12/08/1946 Works Visit Works Visit - Stratford Works (Heavy) - Arr: 12/08/1946. Dep: 05/09/1946.
Work undertaken:
Boiler number 2691 (Diagram 97)
   
06/10/1946 Allocation Reallocated to Lowestoft (LOW)    
24/03/1947 Allocation Reallocated to Carlisle Canal (CAR)    
05/07/1948 Works Visit Works Visit - Cowlairs Works (General) - Arr: 05/07/1948. Dep: 13/08/1948.
Work undertaken:
Renumbered to BR 64912
   
21/06/1950 Works Visit Works Visit - Cowlairs Works (General) - Arr: 21/06/1950. Dep: 11/08/1950.
Work undertaken:
Boiler number C2023 (Diagram 97)
   
07/10/1952 Works Visit Works Visit - Cowlairs Works (Heavy Intermediate) - Arr: 07/10/1952. Dep: 26/10/1952.    
19/10/1953 Works Visit Works Visit - Cowlairs Works (Heavy Casual) - Arr: 19/10/1953. Dep: 24/11/1953.    
14/02/1955 Works Visit Works Visit - Cowlairs Works (General) - Arr: 14/02/1955. Dep: 11/03/1955.
Work undertaken:
Boiler number 27486 (Diagram 97)
   
12/12/1956 Works Visit Works Visit - Cowlairs Works (Heavy Intermediate) - Arr: 12/12/1956. Dep: 19/01/1957.    
09/05/1958 Works Visit Works Visit - Cowlairs Works (General) - Arr: 09/05/1958. Dep: 07/06/1958.
Work undertaken:
Boiler number 27473 (Diagram 97)
   
29/11/1959 Works Visit Works Visit - Cowlairs Works (Unclassified) - Arr: 29/11/1959. Dep: 30/11/1959.    
12/1959 Scrapped Scrapped    
05/12/1959 Withdrawn Condemned as 64912 from Carlisle Canal (12C)    

prev prev