Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 3772 Today
» 4163 Yesterday
» 17178 Week
» 70194 Month
» 189721 Year
» 3216574 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 1486 on 05/12/1935
London and North Eastern Railway (1946) 4867   24/11/1946
British Railways 64867   15/10/1948

Locomotive Specifics
Designer N. Gresley
Class J39
Company History LNER
Wheels 0-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 1653
Fittings (as built)
Engine Brakes Vacuum
To Service Sat 05/12/1935 to Newport (Teeside) (NPT)
Withdrawal Sat 24/02/1962 off Malton (50F)
Service Life 26 yrs, 2 mths , 19 dys

Disposal
Scrapping During 08/1962

Notes
Notes Cut up at Cowlairs

Allocations
Code Subsequent Codes Name From Date
NPT   Newport (Teeside) (New) on 05/12/1935
MID   Middlesbrough on 23/01/1936
DAR   Darlington on 28/03/1943
HLD   Hull Dairycoates on 28/12/1947
HLD   Hull Dairycoates w/e 03/01/1948
50B   Neville Hill on 20/05/1951
50B   Neville Hill w/e 26/05/1951
50F   Malton on 10/06/1951
50F   Malton w/e 16/06/1951
     Withdrawn on 24/02/1962

SLS Allocations*
Type Code Name From Date
ALLOC HLD Hull Dairycoates w/e 03/01/1948
ALLOC 50B Neville Hill w/e 26/05/1951
ALLOC 50F Malton w/e 16/06/1951
WDN   on 24/02/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
08/10/1940 Diagram 97 boiler fitted (number 2922)
12/02/1944 Diagram 97 boiler fitted (number 8022)
16/10/1948 Diagram 97 boiler fitted (number 2095)
20/10/1951 Diagram 97 boiler fitted (number 27589)
22/10/1955 Diagram 97 boiler fitted (number 27532)
09/02/1957 Diagram 97 boiler fitted (number 27511)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 02/04/1938 14/05/1938 43 days General    
Darlington Works 03/09/1940 08/10/1940 36 days General Boiler number 2922 (Diagram 97)
 
Darlington Works 28/11/1942 05/01/1943 39 days Light Repair    
Cowlairs Works 08/01/1944 12/02/1944 36 days General Boiler number 27460 (Diagram 97)
 
Cowlairs Works 08/09/1945 06/10/1945 29 days General    
Cowlairs Works 06/07/1946 27/07/1946 22 days Light Repair    
Cowlairs Works 02/11/1946 09/11/1946 8 days Light Repair    
Cowlairs Works 09/09/1948 16/10/1948 38 days General Boiler number 2095 (Diagram 97)
Renumbered to BR 64867
 
Cowlairs Works 06/09/1951 20/10/1951 45 days General Boiler number 27589 (Diagram 97)
 
Cowlairs Works 23/09/1955 22/10/1955 30 days General Boiler number 27532 (Diagram 97)
 
Cowlairs Works 11/01/1957 09/02/1957 30 days Heavy Casual Boiler number 27511 (Diagram 97)
 
Cowlairs Works 11/02/1959 06/03/1959 24 days Light Intermediate    

Summary
Date Event Details Source See Also
05/12/1935 To Service To service as London and North Eastern Railway Number 1486
Built at Darlington Works, Works Number 1653
Allocated to Newport (Teeside) (NPT)
Diagram 97 boiler fitted
   
23/01/1936 Allocation Reallocated to Middlesbrough (MID)    
02/04/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 02/04/1938. Dep: 14/05/1938.    
03/09/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 03/09/1940. Dep: 08/10/1940.
Work undertaken:
Boiler number 2922 (Diagram 97)
   
28/11/1942 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 28/11/1942. Dep: 05/01/1943.    
28/03/1943 Allocation Reallocated to Darlington (DAR)    
08/01/1944 Works Visit Works Visit - Cowlairs Works (General) - Arr: 08/01/1944. Dep: 12/02/1944.
Work undertaken:
Boiler number 27460 (Diagram 97)
   
08/09/1945 Works Visit Works Visit - Cowlairs Works (General) - Arr: 08/09/1945. Dep: 06/10/1945.    
06/07/1946 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 06/07/1946. Dep: 27/07/1946.    
02/11/1946 Works Visit Works Visit - Cowlairs Works (Light Repair) - Arr: 02/11/1946. Dep: 09/11/1946.    
24/11/1946 Renumbered Renumbered to 4867    
28/12/1947 Allocation Reallocated to Hull Dairycoates (HLD)    
03/01/1948 Allocation Reallocated to Hull Dairycoates (HLD)    
09/09/1948 Works Visit Works Visit - Cowlairs Works (General) - Arr: 09/09/1948. Dep: 16/10/1948.
Work undertaken:
Boiler number 2095 (Diagram 97)
Renumbered to BR 64867
   
20/05/1951 Allocation Reallocated to Neville Hill (50B)    
26/05/1951 Allocation Reallocated to Neville Hill (50B)    
10/06/1951 Allocation Reallocated to Malton (50F)    
16/06/1951 Allocation Reallocated to Malton (50F)    
06/09/1951 Works Visit Works Visit - Cowlairs Works (General) - Arr: 06/09/1951. Dep: 20/10/1951.
Work undertaken:
Boiler number 27589 (Diagram 97)
   
23/09/1955 Works Visit Works Visit - Cowlairs Works (General) - Arr: 23/09/1955. Dep: 22/10/1955.
Work undertaken:
Boiler number 27532 (Diagram 97)
   
11/01/1957 Works Visit Works Visit - Cowlairs Works (Heavy Casual) - Arr: 11/01/1957. Dep: 09/02/1957.
Work undertaken:
Boiler number 27511 (Diagram 97)
   
11/02/1959 Works Visit Works Visit - Cowlairs Works (Light Intermediate) - Arr: 11/02/1959. Dep: 06/03/1959.    
24/02/1962 Withdrawn Condemned as 64867 from Malton (50F)    
08/1962 Scrapped Scrapped    

prev prev