Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 7 Online
» 456 Today
» 4397 Yesterday
» 18259 Week
» 71275 Month
» 190802 Year
» 3217655 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1924) 1467 on 22/03/1934
London and North Eastern Railway (1946) 4850   17/11/1946
British Railways 64850   17/11/1949

Locomotive Specifics
Designer N. Gresley
Class J39
Company History LNER
Wheels 0-6-0
Builder Darlington Works
Order Number No Order ID issued
Works Number 1579
Fittings (as built)
Engine Brakes Steam Brake with Vacuum Ejector
To Service Mon 22/03/1934 to Newport (Teeside) (NPT)
Withdrawal Mon 03/12/1962 off Hull Dairycoates (50B)
Service Life 28 yrs, 8 mths , 11 dys

Disposal
Scrapping During 04/1963

Notes
Notes Cut up at Darlington

Allocations
Code Subsequent Codes Name From Date
NPT   Newport (Teeside) (New) on 22/03/1934
TWD   Tweedmouth on 19/06/1939
GHD   Gateshead on 20/01/1940
DAR   Darlington on 28/03/1943
NEV   Neville Hill on 29/01/1950
NEV   Neville Hill w/e 04/02/1950
50C   Selby on 26/09/1954
50B   Neville Hill on 07/08/1955
51L   Thornaby on 01/11/1959
50F   Malton on 09/07/1961
50B   Hull Dairycoates on 25/02/1962
     Withdrawn on 03/12/1962

SLS Allocations*
Type Code Name From Date
ALLOC NEV Neville Hill w/e 04/02/1950
ALLOC 50C Selby 4w/e 18/09/1954
ALLOC 50B Neville Hill 4w/e 13/08/1955
ALLOC 51L Thornaby 4w/e 28/11/1959
ALLOC 50F Malton 5w/e 12/08/1961
ALLOC 50B Hull Dairycoates 5w/e 10/03/1962
WDN   on 03/12/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
22/03/1934 Diagram 97 boiler fitted (number 2568)
16/06/1938 Diagram 97 boiler fitted (number 2317)
29/04/1940 Diagram 97 boiler fitted (number RS129)
20/05/1944 Diagram 97 boiler fitted (number 3194)
19/04/1947 Diagram 97 boiler fitted (number 3191)
27/10/1952 Diagram 97 boiler fitted (number 27564)
24/01/1959 Diagram 97 boiler fitted (number 27827)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 18/04/1934 20/04/1934 3 days Unclassified Water scoop fitted
 
Darlington Works 09/12/1935 23/01/1936 46 days General    
Darlington Works 11/05/1938 16/06/1938 37 days General Boiler number 2317 (Diagram 97)
 
Darlington Works 26/03/1940 29/04/1940 35 days General Boiler number RS129 (Diagram 97)
 
Darlington Works 31/05/1943 03/07/1943 34 days Light Repair    
Cowlairs Works 25/04/1944 20/05/1944 26 days General Boiler number 27554 (Diagram 97)
 
Cowlairs Works 18/01/1947 19/04/1947 92 days General Boiler number 3191 (Diagram 97)
 
Cowlairs Works 12/10/1949 19/11/1949 39 days Light Intermediate Renumbered to BR 64850
 
Cowlairs Works 10/10/1952 27/10/1952 18 days General Boiler number 27564 (Diagram 97)
 
Cowlairs Works 20/11/1952 28/11/1952 9 days Unclassified    
Cowlairs Works 18/08/1955 17/09/1955 31 days Heavy Intermediate    
Cowlairs Works 31/12/1958 24/01/1959 25 days General Boiler number 27827 (Diagram 97)
 

Summary
Date Event Details Source See Also
22/03/1934 To Service To service as London and North Eastern Railway Number 1467
Built at Darlington Works, Works Number 1579
Allocated to Newport (Teeside) (NPT)
Diagram 97 boiler fitted
   
18/04/1934 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 18/04/1934. Dep: 20/04/1934.
Work undertaken:
Water scoop fitted
   
09/12/1935 Works Visit Works Visit - Darlington Works (General) - Arr: 09/12/1935. Dep: 23/01/1936.    
11/05/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 11/05/1938. Dep: 16/06/1938.
Work undertaken:
Boiler number 2317 (Diagram 97)
   
19/06/1939 Allocation Reallocated to Tweedmouth (TWD)    
20/01/1940 Allocation Reallocated to Gateshead (GHD)    
26/03/1940 Works Visit Works Visit - Darlington Works (General) - Arr: 26/03/1940. Dep: 29/04/1940.
Work undertaken:
Boiler number RS129 (Diagram 97)
   
28/03/1943 Allocation Reallocated to Darlington (DAR)    
31/05/1943 Works Visit Works Visit - Darlington Works (Light Repair) - Arr: 31/05/1943. Dep: 03/07/1943.    
25/04/1944 Works Visit Works Visit - Cowlairs Works (General) - Arr: 25/04/1944. Dep: 20/05/1944.
Work undertaken:
Boiler number 27554 (Diagram 97)
   
17/11/1946 Renumbered Renumbered to 4850    
18/01/1947 Works Visit Works Visit - Cowlairs Works (General) - Arr: 18/01/1947. Dep: 19/04/1947.
Work undertaken:
Boiler number 3191 (Diagram 97)
   
12/10/1949 Works Visit Works Visit - Cowlairs Works (Light Intermediate) - Arr: 12/10/1949. Dep: 19/11/1949.
Work undertaken:
Renumbered to BR 64850
   
29/01/1950 Allocation Reallocated to Neville Hill (NEV)    
04/02/1950 Allocation Reallocated to Neville Hill (NEV)    
10/10/1952 Works Visit Works Visit - Cowlairs Works (General) - Arr: 10/10/1952. Dep: 27/10/1952.
Work undertaken:
Boiler number 27564 (Diagram 97)
   
20/11/1952 Works Visit Works Visit - Cowlairs Works (Unclassified) - Arr: 20/11/1952. Dep: 28/11/1952.    
26/09/1954 Allocation Reallocated to Selby (50C)    
07/08/1955 Allocation Reallocated to Neville Hill (50B)    
18/08/1955 Works Visit Works Visit - Cowlairs Works (Heavy Intermediate) - Arr: 18/08/1955. Dep: 17/09/1955.    
31/12/1958 Works Visit Works Visit - Cowlairs Works (General) - Arr: 31/12/1958. Dep: 24/01/1959.
Work undertaken:
Boiler number 27827 (Diagram 97)
   
01/11/1959 Allocation Reallocated to Thornaby (51L)    
09/07/1961 Allocation Reallocated to Malton (50F)    
25/02/1962 Allocation Reallocated to Hull Dairycoates (50B)    
03/12/1962 Withdrawn Condemned as 64850 from Hull Dairycoates (50B)    
04/1963 Scrapped Scrapped    

prev prev