Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 20 Online
» 1222 Today
» 4163 Yesterday
» 14628 Week
» 67644 Month
» 187171 Year
» 3214024 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North British Railway 751 m/e 01/1899
London and North Eastern Railway (1924) 9751 m/e 02/1926
London and North Eastern Railway (1946) 5309 m/e 11/1946
British Railways 65309 m/e 04/1948

Locomotive Specifics
Designer M. Holmes
Class J36
Company History NBR/LNER
Rebuild History
ClassFrom
J3601/1899
J36 (0-6-0)07/1921
Wheels 0-6-0
Builder Cowlairs Works
Order Number No Order ID issued
Fittings (as built)
Engine Brakes Westinghouse
To Service During 01/1899
Withdrawal Mon 29/06/1964 off Bathgate (64F)
Service Life 65 yrs, 5 mths , 29 dys

Disposal
Scrapping During 10/1964 at Motherwell Machinery and Scrap (Wishaw)

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 01/1899
PTH   Perth (LNER) on 01/01/1948 (Snapshot)
62B   Dundee Tay Bridge w/e 25/02/1950
64F   Bathgate 4w/e 22/10/1960
     Withdrawn on 29/06/1964

SLS Allocations*
Type Code Name From Date
ALLOC PTH Perth (LNER) 4w/e 23/03/1946
ALLOC 62B Dundee Tay Bridge w/e 25/02/1950
ALLOC 64F Bathgate 4w/e 22/10/1960
WDN   on 29/06/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
07/1921 Saturated LNER Diagram 81 Boiler Fitted
07/1921 Diagram 81 boiler fitted (Round Top firebox)
01/1946 Steam Brakes fitted
01/1946 Westinghouse Brake removed


Mentions ...
Report Date Title Report Source
31/07/1950 Inverurie Works Engines due into Works, July 1950: 40613/65, 55136, 57299, 57338, 61505, 62231, 4482, 64534, 65228/36/73, 65309, 8749. SLS/195010
04/07/1961 Inverurie Works (Erecting Shops) Erecting Shops: D261, D2421, D3552, D6138/48, 43902, 44194, 44257, 64616/23, 65282, 65309/29. Waiting Works : 55185, 62479, 64494, 64612, 65261/81, 65900. Scrap Yard: 40574/94, 40688, 43868, 54475/83/8, 55198, 56240/6, 57232, 57324, 57552, 57609, 62474, 64471/82, 65276/95, 68459/71, 69136. SLS/196108

Summary
Date Event Details Source See Also
01/1899 To Service To service as North British Railway Number 751
Built at Cowlairs Works
Diagram (unknown) boiler fitted
   
07/1921 Modification Diagram 81 boiler fitted    
07/1921 Modification Modification: Saturated LNER Diagram 81 Boiler Fitted    
02/1926 Renumbered Renumbered to 9751    
01/1946 Modification Modification: Steam Brakes fitted    
01/1946 Modification Modification: Westinghouse Brake removed    
11/1946 Renumbered Renumbered to 5309    
01/01/1948 Allocation Allocation Snapshot - Perth (LNER) (PTH)    
04/1948 Renumbered Renumbered to 65309    
25/02/1950 Allocation Reallocated to Dundee Tay Bridge (62B)    
22/10/1960 Allocation Reallocated to Bathgate (64F)    
29/06/1964 Withdrawn Condemned as 65309 from Bathgate (64F)    
10/1964 Scrapped Broken up by Motherwell Machinery and Scrap: Wishaw    

prev prev