Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 30 Online
» 3453 Today
» 4469 Yesterday
» 17496 Week
» 82450 Month
» 285114 Year
» 3311967 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 2151 m/e 12/1913
London and North Eastern Railway (1946) 9858   20/10/1946
British Railways 69858   10/09/1948

Locomotive Specifics
Designer V. Raven / N. Gresley
Class A8
Company History LNER
Rebuild History
ClassFrom
H112/1913
A8 (4-6-2T)11/06/1936
Wheels 4-6-2T
Builder Darlington Works
To Service During 12/1913 to Saltburn (SALT)
Withdrawal Tue 10/05/1960 off Sunderland (52G)
Service Life 46 yrs, 5 mths , 10 dys

Disposal
Scrapping During 05/1960

Notes
Notes Into Darlington for cutting up 10/5/60

Allocations
Code Subsequent Codes Name From Date
SALT   Saltburn (New) m/e 12/1913
DAR   Darlington on 01/07/1924
SALT   Saltburn on 07/02/1925
BLA   Blaydon on 28/05/1928
MID   Middlesbrough on 11/06/1936
BLA   Blaydon on 17/01/1939
HLB   Hull Botanic Gardens on 28/03/1940
MID   Middlesbrough on 12/01/1946
WBY   Whitby on 30/05/1948
WBY   Whitby w/e 05/06/1948
50B   Neville Hill on 29/06/1954
53B   Hull Botanic Gardens on 10/06/1956
51D   Middlesbrough on 16/06/1957
54A   Sunderland on 15/09/1957
     Withdrawn on 10/05/1960

SLS Allocations*
Type Code Name From Date
ALLOC WBY Whitby w/e 05/06/1948
ALLOC 50B Neville Hill 4w/e 18/09/1954
ALLOC 53B Hull Botanic Gardens 4w/e 23/06/1956
ALLOC 51D Middlesbrough 4w/e 13/07/1957
ALLOC 54A Sunderland 4w/e 05/10/1957
TOSTORE   4w/e 30/05/1959
WDN   on 10/05/1960

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
12/1913 Diagram 63 boiler fitted (number D269)
20/09/1927 Diagram 63 boiler fitted (number D254)
13/11/1931 Diagram 63 boiler fitted (number 2374)
11/06/1936 Diagram 63 boiler fitted (number D1254)
30/10/1941 Diagram 63B boiler fitted (number 3067)
09/12/1944 Diagram 63B boiler fitted (number 3031)
26/04/1947 Diagram 63B boiler fitted (number 3059)
08/07/1949 Diagram 63B boiler fitted (number 3048)
16/01/1954 Diagram 63B boiler fitted (number 24697)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 13/03/1923 29/06/1923 109 days General    
Darlington Works 10/03/1925 28/05/1925 80 days General    
Darlington Works 11/07/1927 20/09/1927 72 days General Boiler number D254 (Diagram 63)
 
Gateshead Works 09/07/1929 05/09/1929 59 days General    
Gateshead Works 19/03/1931 25/03/1931 7 days Light Repair    
Gateshead Works 09/10/1931 13/11/1931 36 days General Boiler number 2374 (Diagram 63)
 
Darlington Works 03/10/1933 17/11/1933 46 days General    
Darlington Works 11/03/1936 11/06/1936 93 days Rebuilding Boiler number D1254 (Diagram 63)
 
Darlington Works 05/10/1938 15/12/1938 72 days General    
Darlington Works 17/09/1941 30/10/1941 44 days General Boiler number 3067 (Diagram 63B)
 
Darlington Works 07/11/1944 09/12/1944 33 days General Boiler number 3031 (Diagram 63B)
 
Darlington Works 17/04/1947 26/04/1947 10 days General Boiler number 3059 (Diagram 63B)
 
Gateshead Works 25/08/1948 10/09/1948 17 days Light Repair Renumbered to BR 69858
 
Darlington Works 08/06/1949 08/07/1949 31 days General Positive lub. drive fitted
Boiler number 3048 (Diagram 63B)
 
Darlington Works 11/07/1949 13/07/1949 3 days Unclassified    
Gateshead Works 26/09/1949 09/11/1949 45 days Light Casual    
Darlington Works 24/09/1951 20/10/1951 27 days General Boiler number 24713 (Diagram 63B)
 
Darlington Works 22/10/1951 24/10/1951 3 days Unclassified    
Darlington Works 15/12/1953 16/01/1954 33 days General Boiler number 24697 (Diagram 63B)
 
Darlington Works 25/01/1954 30/01/1954 6 days Unclassified    
Darlington Works 28/02/1957 30/03/1957 31 days General Boiler number 24686 (Diagram 63B)
 
Gateshead Works 10/07/1957 16/08/1957 38 days Light Casual After collision
 

Mentions ...
Report Date Title Report Source
31/10/1957 Sunderland MPD This shed now has the following A8's 69852/4/5/8/9/62/72/8/89 and in addition 69873/83/93 are sub-shedded at Durham having replaced G5's. SLS/195711
31/05/1959 Class A8 4-6-2T (Borough Gardens) All the locomotives of this class were noted stored during May viz.-Borough Gardens 69852/6/8/70, Darlington 69887, Saltburn 69869, Selby 69861, Sunderland 69850/3/4/5/7/9/73/4/5/8/83, Thornaby 69860, West Hartlepool 69867/77/85, York 69886. SLS/195907

Summary
Date Event Details Source See Also
12/1913 To Service To service as North Eastern Railway Number 2151
Built at Darlington Works, Works Number
Allocated to Saltburn (SALT)
Diagram 63 boiler fitted
   
13/03/1923 Works Visit Works Visit - Darlington Works (General) - Arr: 13/03/1923. Dep: 29/06/1923.    
01/07/1924 Allocation Reallocated to Darlington (DAR)    
07/02/1925 Allocation Reallocated to Saltburn (SALT)    
10/03/1925 Works Visit Works Visit - Darlington Works (General) - Arr: 10/03/1925. Dep: 28/05/1925.    
11/07/1927 Works Visit Works Visit - Darlington Works (General) - Arr: 11/07/1927. Dep: 20/09/1927.
Work undertaken:
Boiler number D254 (Diagram 63)
   
28/05/1928 Allocation Reallocated to Blaydon (BLA)    
09/07/1929 Works Visit Works Visit - Gateshead Works (General) - Arr: 09/07/1929. Dep: 05/09/1929.    
19/03/1931 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 19/03/1931. Dep: 25/03/1931.    
09/10/1931 Works Visit Works Visit - Gateshead Works (General) - Arr: 09/10/1931. Dep: 13/11/1931.
Work undertaken:
Boiler number 2374 (Diagram 63)
   
03/10/1933 Works Visit Works Visit - Darlington Works (General) - Arr: 03/10/1933. Dep: 17/11/1933.    
11/03/1936 Works Visit Works Visit - Darlington Works (Rebuilding) - Arr: 11/03/1936. Dep: 11/06/1936.
Work undertaken:
Boiler number D1254 (Diagram 63)
   
11/06/1936 Allocation Reallocated to Middlesbrough (MID)    
05/10/1938 Works Visit Works Visit - Darlington Works (General) - Arr: 05/10/1938. Dep: 15/12/1938.    
17/01/1939 Allocation Reallocated to Blaydon (BLA)    
28/03/1940 Allocation Reallocated to Hull Botanic Gardens (HLB)    
17/09/1941 Works Visit Works Visit - Darlington Works (General) - Arr: 17/09/1941. Dep: 30/10/1941.
Work undertaken:
Boiler number 3067 (Diagram 63B)
   
07/11/1944 Works Visit Works Visit - Darlington Works (General) - Arr: 07/11/1944. Dep: 09/12/1944.
Work undertaken:
Boiler number 3031 (Diagram 63B)
   
12/01/1946 Allocation Reallocated to Middlesbrough (MID)    
20/10/1946 Renumbered Renumbered to 9858    
17/04/1947 Works Visit Works Visit - Darlington Works (General) - Arr: 17/04/1947. Dep: 26/04/1947.
Work undertaken:
Boiler number 3059 (Diagram 63B)
   
30/05/1948 Allocation Reallocated to Whitby (WBY)    
05/06/1948 Allocation Reallocated to Whitby (WBY)    
25/08/1948 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 25/08/1948. Dep: 10/09/1948.
Work undertaken:
Renumbered to BR 69858
   
08/06/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 08/06/1949. Dep: 08/07/1949.
Work undertaken:
Positive lub. drive fitted
Boiler number 3048 (Diagram 63B)
   
11/07/1949 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 11/07/1949. Dep: 13/07/1949.    
26/09/1949 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 26/09/1949. Dep: 09/11/1949.    
24/09/1951 Works Visit Works Visit - Darlington Works (General) - Arr: 24/09/1951. Dep: 20/10/1951.
Work undertaken:
Boiler number 24713 (Diagram 63B)
   
22/10/1951 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 22/10/1951. Dep: 24/10/1951.    
15/12/1953 Works Visit Works Visit - Darlington Works (General) - Arr: 15/12/1953. Dep: 16/01/1954.
Work undertaken:
Boiler number 24697 (Diagram 63B)
   
25/01/1954 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 25/01/1954. Dep: 30/01/1954.    
29/06/1954 Allocation Reallocated to Neville Hill (50B)    
10/06/1956 Allocation Reallocated to Hull Botanic Gardens (53B)    
28/02/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 28/02/1957. Dep: 30/03/1957.
Work undertaken:
Boiler number 24686 (Diagram 63B)
   
16/06/1957 Allocation Reallocated to Middlesbrough (51D)    
10/07/1957 Works Visit Works Visit - Gateshead Works (Light Casual) - Arr: 10/07/1957. Dep: 16/08/1957.
Work undertaken:
After collision
   
15/09/1957 Allocation Reallocated to Sunderland (54A)    
05/1960 Scrapped Scrapped    
10/05/1960 Withdrawn Condemned as 69858 from Sunderland (52G)    

prev prev