Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 16 Online
» 4125 Today
» 4163 Yesterday
» 17531 Week
» 70547 Month
» 190074 Year
» 3216927 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
North Eastern Railway 752 m/e 11/1908

Locomotive Specifics
Designer W. Worsdell
Class B13
Company History NER/LNER
Rebuild History
ClassFrom
B1311/1908
Wheels 4-6-0
Builder Gateshead Works
Works Number 106
Fittings (as built)
Engine Brakes Westinghouse
To Service During 11/1908 to Heaton (HTN)
Withdrawal Sat 23/06/1934 off Tweedmouth (TWD)
Service Life 25 yrs, 7 mths , 23 dys

Disposal

Notes
Notes Into Darlington for cutting up 22/10/38

Allocations
Code Subsequent Codes Name From Date
HTN   Heaton (New) m/e 11/1908
TWD   Tweedmouth on 07/01/1925
ANN   Annesley on 07/02/1926
TWD   Tweedmouth on 20/09/1926
HLD   Hull Dairycoates on 18/02/1927
TWD   Tweedmouth on 07/04/1927
     Withdrawn on 23/06/1934

Modifications
Date Modified Modification
11/1908 Diagram 54Sat boiler fitted (number G726)
07/03/1920 Diagram 54Sup boiler fitted (number G701)
01/1923 Vacuum Ejector fitted
22/12/1927 Diagram 54Sup boiler fitted (number D1975)
02/03/1933 Diagram 54Sup boiler fitted (number D1721)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Unknown Works 1920 03/1920   General Superheated boiler fitted
 
Gateshead Works 08/09/1924 08/10/1924 31 days Light Repair    
Gateshead Works 18/06/1925 11/09/1925 86 days General    
Gateshead Works 18/10/1927 22/12/1927 66 days General Boiler number D1975 (Diagram 54Sup)
 
Gateshead Works 13/04/1928 23/04/1928 11 days Unclassified    
Gateshead Works 14/04/1930 27/05/1930 44 days General    
Darlington Works 30/01/1933 02/03/1933 32 days Heavy Not repaired
Boiler number D1721 (Diagram 54Sup)
 

Summary
Date Event Details Source See Also
11/1908 To Service To service as North Eastern Railway Number 752
Built at Gateshead Works, Works Number 106
Allocated to Heaton (HTN)
Diagram 54Sat boiler fitted
   
1920 Works Visit Works Visit - Unknown Works (General) - Arr: ?/1920. Dep: ?/03/1920.
Work undertaken:
Superheated boiler fitted
   
07/03/1920 Modification Diagram 54Sup number G701 boiler fitted    
01/1923 Modification Modification: Vacuum Ejector fitted    
08/09/1924 Works Visit Works Visit - Gateshead Works (Light Repair) - Arr: 08/09/1924. Dep: 08/10/1924.    
07/01/1925 Allocation Reallocated to Tweedmouth (TWD)    
18/06/1925 Works Visit Works Visit - Gateshead Works (General) - Arr: 18/06/1925. Dep: 11/09/1925.    
07/02/1926 Allocation Reallocated to Annesley (ANN)    
20/09/1926 Allocation Reallocated to Tweedmouth (TWD)    
18/02/1927 Allocation Reallocated to Hull Dairycoates (HLD)    
07/04/1927 Allocation Reallocated to Tweedmouth (TWD)    
18/10/1927 Works Visit Works Visit - Gateshead Works (General) - Arr: 18/10/1927. Dep: 22/12/1927.
Work undertaken:
Boiler number D1975 (Diagram 54Sup)
   
13/04/1928 Works Visit Works Visit - Gateshead Works (Unclassified) - Arr: 13/04/1928. Dep: 23/04/1928.    
14/04/1930 Works Visit Works Visit - Gateshead Works (General) - Arr: 14/04/1930. Dep: 27/05/1930.    
30/01/1933 Works Visit Works Visit - Darlington Works (Heavy) - Arr: 30/01/1933. Dep: 02/03/1933.
Work undertaken:
Not repaired
Boiler number D1721 (Diagram 54Sup)
   
23/06/1934 Withdrawn Condemned as 752 from Tweedmouth (TWD)    

prev prev