Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 14 Online
» 667 Today
» 4868 Yesterday
» 19578 Week
» 84532 Month
» 287196 Year
» 3314049 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1946) 1202 on 12/06/1947
British Railways 61202   12/03/1949

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder North British Locomotive Company, Glasgow
Order Number L963
Works Number 26103
Fittings (as built)
Engine Brakes Steam
To Service Sun 12/06/1947 to Immingham (IMM)
Withdrawal Sun 16/09/1962 off Lincoln (40A)
Service Life 15 yrs, 3 mths , 4 dys

Disposal
Scrapping During 01/1963 at Cox and Danks (Wadsley Bridge)

Notes
Notes Sold 1/63 for scrap to Cox & Danks, Wadsley Bridge

Allocations
Code Subsequent Codes Name From Date
IMM   Immingham (New) on 12/06/1947
40A   Lincoln on 29/03/1953
     Withdrawn on 16/09/1962

SLS Allocations*
Type Code Name From Date
NEW IMM Immingham on 12/06/1947
ALLOC 40A Lincoln 4w/e 18/04/1953
WDN   on 16/09/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
12/06/1947 Diagram 100A boiler fitted (number 9839)
12/03/1949 Diagram 100A boiler fitted (number 3733)
23/12/1950 Diagram 100A boiler fitted (number 28279)
10/10/1952 Diagram 100A boiler fitted (number 28117)
25/09/1954 Diagram 100A boiler fitted (number 28450)
30/11/1956 Diagram 100A boiler fitted (number 28285)
01/05/1959 Diagram 100A boiler fitted (number 28101)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gorton Works 06/02/1949 12/03/1949 35 days General Boiler number 3733 (Diagram 100A)
Renumbered to BR 61202
 
Gorton Works 07/10/1950 23/12/1950 78 days General Boiler number 28279 (Diagram 100A)
 
Gorton Works 13/09/1951 29/09/1951 17 days Light Casual    
Gorton Works 02/10/1951 06/10/1951 5 days Unclassified    
Gorton Works 28/12/1951 04/01/1951 -357 days Unclassified    
Doncaster Works 12/09/1952 10/10/1952 29 days General Boiler number 28117 (Diagram 100A)
 
Darlington Works 08/08/1954 25/09/1954 49 days General Boiler number 28450 (Diagram 100A)
 
Doncaster Works 26/10/1956 30/11/1956 36 days General Boiler number 28285 (Diagram 100A)
 
Doncaster Works 21/08/1957 29/08/1957 9 days Unclassified    
Doncaster Works 22/04/1958 30/04/1958 9 days Light Casual    
Stratford Works 09/03/1959 01/05/1959 54 days General Boiler number 28101 (Diagram 100A)
 
Doncaster Works 06/10/1959 16/10/1959 11 days Unclassified    
Doncaster Works 23/08/1960 02/09/1960 11 days Unclassified    
Doncaster Works 25/03/1961 12/04/1961 19 days Unclassified    

Mentions ...
Report Date Title Report Source
31/05/1947 Queens Park Works During May eight new Class 'B.1' 4-6-0's appeared ex Q.P. Works, Nos. 1190-1197 inclusive. Up to 27/6 another eleven 'B.1's' had appeared, viz., Nos. 1198-1208. They were ex Works as follows: 1196 (27/5), 1197 (29/5), 1198 (3/6), 1199 (4/6), 1200 (6/6), 1201 (10/6), 1202 (12/6), 1203 (17/6), 1204 (19/6), 1205 and 1206 (24/6), and 1207 and 1208 . (27/6). Works' Nos. checked are as follows: Nos. 1190-1205 (26091-26106/47) and No. 1207 (26108/47). SLS/194708
06/08/1947 Queens Park Works On 6/8 Nos. 1201-1203 were in the Paint Shop, Nos. 1204-1210 were complete in the Erecting Shop, the latter being in steam prior to under-going steaming trials that afternoon. No. 1211 was in an advanced state of completion, being only minus bogie and chimney, while No. 1212 was awaiting wheels, cab and chimney. No. 1210 onwards have a rocking grate fitted, while all of this batch have hopper ash-pans, self-cleaning smoke-boxes, and electric lighting provided by a Stone's turbo-generator mounted on the footplating at the right-hand side of the smoke-box. The cab lighting comprises a lamp with wire guard on the underside of the cab roof, and a hooded lamp at each water gauge and at the steam pressure and vacuum gauges-five in all. Sockets for an inspection lamp are provided under the footplating on each side of the engine (above the driving wheels), but neither the sockets for the headlamps or the lamps themselves are fitted, the cables being run forward and the ends bound with insulating tape. As in the previous batch, the speed indicator drive off the left-hand rear coupled wheel crank pin is fitted, but not the speed indicator itself. SLS/194708
02/04/1959 Stratford Works (Old Works) Old Works, 43143 (40F), 61009 (40A), 61116 (14D), 61202 (40A), 61232 (30F), 61329 (30A), 61348 (31F), 61371 (31A), 61405 (40A), 64823 (40F), 69696 (30A). Diesel Sp., D206 (34B), 11138 (30F), 12078 (1A), 15203 (75C), D2550 (32B), D3094 (75A), D3301 (30A), D5304 (34B), D8404 (30A). Waiting Wks., 61575 (31A), 64650 (30E), 64677 (30A), 64715 (40E), 65556 (31A), 69637 (34C), 69669 (30A). Paint shop, 15215 (75C), 61375 (30A), Stripping Sp., 43105 (30A), 61573 Wdn, 69728 (30A). Foundry, 68541. Waiting cut up, 61566/76/80, 62536/82/8, 64651, 65467, 65574, 68574/638, 69600/10/6/9/23/7/34/5/59/66/76/716/31. SLS/195905

Summary
Date Event Details Source See Also
12/06/1947 To Service To service as London and North Eastern Railway Number 1202
Built at North British Locomotive Company, Glasgow, Works Number 26103
Allocated to Immingham (IMM)
Diagram 100A boiler fitted
   
06/02/1949 Works Visit Works Visit - Gorton Works (General) - Arr: 06/02/1949. Dep: 12/03/1949.
Work undertaken:
Boiler number 3733 (Diagram 100A)
Renumbered to BR 61202
   
07/10/1950 Works Visit Works Visit - Gorton Works (General) - Arr: 07/10/1950. Dep: 23/12/1950.
Work undertaken:
Boiler number 28279 (Diagram 100A)
   
13/09/1951 Works Visit Works Visit - Gorton Works (Light Casual) - Arr: 13/09/1951. Dep: 29/09/1951.    
02/10/1951 Works Visit Works Visit - Gorton Works (Unclassified) - Arr: 02/10/1951. Dep: 06/10/1951.    
28/12/1951 Works Visit Works Visit - Gorton Works (Unclassified) - Arr: 28/12/1951. Dep: 04/01/1951.    
12/09/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 12/09/1952. Dep: 10/10/1952.
Work undertaken:
Boiler number 28117 (Diagram 100A)
   
29/03/1953 Allocation Reallocated to Lincoln (40A)    
08/08/1954 Works Visit Works Visit - Darlington Works (General) - Arr: 08/08/1954. Dep: 25/09/1954.
Work undertaken:
Boiler number 28450 (Diagram 100A)
   
26/10/1956 Works Visit Works Visit - Doncaster Works (General) - Arr: 26/10/1956. Dep: 30/11/1956.
Work undertaken:
Boiler number 28285 (Diagram 100A)
   
21/08/1957 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 21/08/1957. Dep: 29/08/1957.    
22/04/1958 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 22/04/1958. Dep: 30/04/1958.    
09/03/1959 Works Visit Works Visit - Stratford Works (General) - Arr: 09/03/1959. Dep: 01/05/1959.
Work undertaken:
Boiler number 28101 (Diagram 100A)
   
06/10/1959 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 06/10/1959. Dep: 16/10/1959.    
23/08/1960 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 23/08/1960. Dep: 02/09/1960.    
25/03/1961 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 25/03/1961. Dep: 12/04/1961.    
16/09/1962 Withdrawn Condemned as 61202 from Lincoln (40A)    
01/1963 Scrapped Broken up by Cox and Danks: Wadsley Bridge    

prev prev