Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 18 Online
» 1857 Today
» 4868 Yesterday
» 20768 Week
» 85722 Month
» 288386 Year
» 3315239 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1946) 1186 on 16/07/1947
British Railways 61186   24/02/1949

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder Vulcan Foundry
Order Number 2333
Works Number 5544
Fittings (as built)
Engine Brakes Steam
To Service Mon 16/07/1947 to Gorton (GOR)
Withdrawal Mon 05/11/1962 off Woodford Halse (2F)
Service Life 15 yrs, 3 mths , 20 dys

Disposal
Scrapping Wed 12/12/1962 at Locomotive Works (Darlington)

Notes
Notes 12/12/62 In for cutting up at Darlington

Allocations
Code Subsequent Codes Name From Date
GOR   Gorton (New) on 16/07/1947
LEI   Leicester (G.C.) on 02/11/1947
38A   Colwick on 15/02/1953
38E   Woodford Halse on 01/09/1957
     Withdrawn on 05/11/1962

SLS Allocations*
Type Code Name From Date
NEW GOR Gorton on 16/07/1947
ALLOC LEI Leicester (G.C.) w/e 08/11/1947
ALLOC 38A Colwick 4w/e 21/02/1953
ALLOC 38E Woodford Halse 4w/e 07/09/1957
WDN   w/e 10/11/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
16/07/1947 Diagram 100A boiler fitted (number 9772)
24/02/1949 Diagram 100A boiler fitted (number 3869)
25/08/1951 Diagram 100A boiler fitted (number 28337)
13/06/1953 Diagram 100A boiler fitted (number 28449)
18/06/1955 Diagram 100A boiler fitted (number 28457)
28/06/1957 Diagram 100A boiler fitted (number 28249)
26/05/1959 Diagram 100A boiler fitted (number 28348)
08/09/1961 Diagram 100A boiler fitted (number 28555)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Darlington Works 05/01/1949 24/02/1949 51 days General Boiler number 3869 (Diagram 100A)
Renumbered to BR 61186
 
Gorton Works 29/08/1949 01/10/1949 34 days Heavy Casual Cylinders ex1497
 
Gorton Works 16/07/1951 25/08/1951 41 days General Boiler number 28337 (Diagram 100A)
 
Gorton Works 28/08/1951 29/08/1951 2 days Unclassified    
Gorton Works 01/05/1953 13/06/1953 44 days General Boiler number 28449 (Diagram 100A)
 
Darlington Works 17/05/1955 18/06/1955 33 days General Boiler number 28457 (Diagram 100A)
 
Darlington Works 29/05/1957 28/06/1957 31 days General Boiler number 28249 (Diagram 100A)
 
Darlington Works 28/04/1959 26/05/1959 29 days General Boiler number 28348 (Diagram 100A)
 
Darlington Works 01/06/1959 10/06/1959 10 days Unclassified    
Darlington Works 20/09/1960 12/10/1960 23 days Light Casual    
Darlington Works 17/08/1961 08/09/1961 23 days General Boiler number 28555 (Diagram 100A)
 
Darlington Works 26/09/1961 04/10/1961 9 days Unclassified    
Darlington Works 27/07/1962 14/08/1962 19 days Light Casual    

Mentions ...
Report Date Title Report Source
28/02/1949 Darlington Works Locomotives awaiting Works during February included:-Nos. 1274, 1605/11/18/31/45, 2745/67, 3199, 3411, 5096, 5606/28, 5800, 7262, 8708, 9105, 60816, 60133, (adjustment), 61015 (damaged), 63140, 65057 (damaged in the Crook derailment), 65712, 67705/54, 69827 (NEA), Class '8' W.D. 77320 an 79239.To scrap yard: Nos. 3291/97/99, 3301/08/17/32, 63322 (badly damaged at Old Town Jct., Middlesboro').Locomotives ex Works during February included:-Nos. 60141, 60142 (Darlington 2061/1949-the first 1949 locomotive), 60143, 60509 (light repair), 60923, 60931 (light repair), 61022 (unlined black), 61161 (lined out), 61162 (unlined black), 61181/86, 61237/58, 61400, 61635/41, 61659 (light repair), 61660, 62353/59/78, 62718/32/64, 63341/49, 65098, 65601, 65633 (repaired at Gateshead-buffer beam snow plough fitted), 65712/49, 65827/60, 67255, 67386, 67623, 67714 (light repair), 68010/39, 68160, 68260, 69933, Class '8' W.D. 90252 (ex 77352), 90344 (ex 70877), 90613 (ex 77469). SLS/194904

Summary
Date Event Details Source See Also
16/07/1947 To Service To service as London and North Eastern Railway Number 1186
Built at Vulcan Foundry, Works Number 5544
Allocated to Gorton (GOR)
Diagram 100A boiler fitted
   
02/11/1947 Allocation Reallocated to Leicester (G.C.) (LEI)    
05/01/1949 Works Visit Works Visit - Darlington Works (General) - Arr: 05/01/1949. Dep: 24/02/1949.
Work undertaken:
Boiler number 3869 (Diagram 100A)
Renumbered to BR 61186
   
29/08/1949 Works Visit Works Visit - Gorton Works (Heavy Casual) - Arr: 29/08/1949. Dep: 01/10/1949.
Work undertaken:
Cylinders ex1497
   
16/07/1951 Works Visit Works Visit - Gorton Works (General) - Arr: 16/07/1951. Dep: 25/08/1951.
Work undertaken:
Boiler number 28337 (Diagram 100A)
   
28/08/1951 Works Visit Works Visit - Gorton Works (Unclassified) - Arr: 28/08/1951. Dep: 29/08/1951.    
15/02/1953 Allocation Reallocated to Colwick (38A)    
01/05/1953 Works Visit Works Visit - Gorton Works (General) - Arr: 01/05/1953. Dep: 13/06/1953.
Work undertaken:
Boiler number 28449 (Diagram 100A)
   
17/05/1955 Works Visit Works Visit - Darlington Works (General) - Arr: 17/05/1955. Dep: 18/06/1955.
Work undertaken:
Boiler number 28457 (Diagram 100A)
   
29/05/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 29/05/1957. Dep: 28/06/1957.
Work undertaken:
Boiler number 28249 (Diagram 100A)
   
01/09/1957 Allocation Reallocated to Woodford Halse (38E)    
28/04/1959 Works Visit Works Visit - Darlington Works (General) - Arr: 28/04/1959. Dep: 26/05/1959.
Work undertaken:
Boiler number 28348 (Diagram 100A)
   
01/06/1959 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 01/06/1959. Dep: 10/06/1959.    
20/09/1960 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 20/09/1960. Dep: 12/10/1960.    
17/08/1961 Works Visit Works Visit - Darlington Works (General) - Arr: 17/08/1961. Dep: 08/09/1961.
Work undertaken:
Boiler number 28555 (Diagram 100A)
   
26/09/1961 Works Visit Works Visit - Darlington Works (Unclassified) - Arr: 26/09/1961. Dep: 04/10/1961.    
27/07/1962 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 27/07/1962. Dep: 14/08/1962.    
05/11/1962 Withdrawn Condemned as 61186 from Woodford Halse (2F)    
12/12/1962 Scrapped Broken up by Locomotive Works: Darlington    

prev prev