Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 25 Online
» 2311 Today
» 4163 Yesterday
» 15717 Week
» 68733 Month
» 188260 Year
» 3215113 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1946) 1150 on 29/04/1947
British Railways 61150   18/09/1948

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder Vulcan Foundry
Order Number 2333
Works Number 5508
Fittings (as built)
Engine Brakes Steam
To Service Sun 29/04/1947 to Gorton (GOR)
Withdrawal Sun 16/09/1962 off Sheffield Darnall (41A)
Service Life 15 yrs, 4 mths , 18 dys

Disposal
Scrapping During 03/1963 at Cashmore's (Great Bridge)

Notes
Notes Sold 3/63 for scrap to J Cashmore, Great Bridge

Allocations
Code Subsequent Codes Name From Date
GOR   Gorton (New) on 29/04/1947
SHF   Sheffield Darnall on 01/06/1947
     Withdrawn on 16/09/1962

SLS Allocations*
Type Code Name From Date
NEW GOR Gorton on 29/04/1947
ALLOC SHF Sheffield Darnall on 01/06/1947
WDN   on 16/09/1962

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
29/04/1947 Diagram 100A boiler fitted (number 9736)
18/09/1948 Diagram 100A boiler fitted (number 9841)
30/09/1950 Diagram 100A boiler fitted (number 28260)
20/03/1952 Diagram 100A boiler fitted (number 28423)
16/01/1954 Diagram 100A boiler fitted (number 28168)
17/11/1955 Diagram 100A boiler fitted (number 28151)
24/10/1957 Diagram 100A boiler fitted (number 28820)
02/01/1960 Diagram 100A boiler fitted (number 28580)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Gorton Works 01/08/1948 18/09/1948 49 days General Boiler number 9841 (Diagram 100A)
Renumbered to BR 61150
 
Gorton Works 04/02/1949 12/02/1949 9 days Light Casual Stub axle to repair
 
Gorton Works 02/08/1950 30/09/1950 60 days General Boiler number 28260 (Diagram 100A)
 
Gorton Works 06/10/1950 07/10/1950 2 days Unclassified    
Darlington Works 26/02/1952 20/03/1952 24 days General Boiler number 28423 (Diagram 100A)
 
Darlington Works 29/05/1953 08/07/1953 41 days Light Casual    
Gorton Works 05/12/1953 16/01/1954 43 days General Boiler number 28168 (Diagram 100A)
 
Gorton Works 19/01/1954 06/02/1954 19 days Unclassified    
Gorton Works 17/02/1954 05/03/1954 17 days Unclassified    
Darlington Works 15/10/1955 17/11/1955 34 days General Boiler number 28151 (Diagram 100A)
 
Darlington Works 21/09/1957 24/10/1957 34 days General Boiler number 28820 (Diagram 100A)
 
Gateshead Works 27/10/1957 05/11/1957 10 days Unclassified    
Doncaster Works 08/12/1959 02/01/1960 26 days General Boiler number 28580 (Diagram 100A)
 
Doncaster Works 04/02/1961 02/03/1961 27 days Unclassified    

Mentions ...
Report Date Title Report Source
19/02/1961 Doncaster Works (Outside Erecting Shop) New Erecting Shop: D3063, D2385-9, E3056-61. New Erecting Shop Yard: E3062. Scrap Road: DEPT2, DEPT9, 61766, 64231, 68623, 68875, 68930/47/79, 69574. Stripping Road: D3452/85, 60010/23/92, 60118/36/40, 60529, 61950, 63943, 64878/85, 68943, 76032. Erecting Shop: D2233, D2402, D3165, D3575, D3630, D8210, 43081, 60030/1/68, 60103/10/29/39, 60521, 61138, 61254, 61313/8, 61807, 61901/13/61, 62032/50, 63926/86, 73001. Outside Erecting Shop: 60021/41, 61150, 61234, 61926, 63964, 73096. Crimpsall: 60133, 62039. Paint Shop: D318/33, D5686/7, D6708/9, D8046, 43152, 60514/34, 61096, 70054. Outside Paint Shop: 60124, 60522, 61165, 61954. Works Shunters: DEPT10 (ex-68911), DEPT11 (ex-68914), 68977. SLS/196104

Summary
Date Event Details Source See Also
29/04/1947 To Service To service as London and North Eastern Railway Number 1150
Built at Vulcan Foundry, Works Number 5508
Allocated to Gorton (GOR)
Diagram 100A boiler fitted
   
01/06/1947 Allocation Reallocated to Sheffield Darnall (SHF)    
01/08/1948 Works Visit Works Visit - Gorton Works (General) - Arr: 01/08/1948. Dep: 18/09/1948.
Work undertaken:
Boiler number 9841 (Diagram 100A)
Renumbered to BR 61150
   
04/02/1949 Works Visit Works Visit - Gorton Works (Light Casual) - Arr: 04/02/1949. Dep: 12/02/1949.
Work undertaken:
Stub axle to repair
   
02/08/1950 Works Visit Works Visit - Gorton Works (General) - Arr: 02/08/1950. Dep: 30/09/1950.
Work undertaken:
Boiler number 28260 (Diagram 100A)
   
06/10/1950 Works Visit Works Visit - Gorton Works (Unclassified) - Arr: 06/10/1950. Dep: 07/10/1950.    
26/02/1952 Works Visit Works Visit - Darlington Works (General) - Arr: 26/02/1952. Dep: 20/03/1952.
Work undertaken:
Boiler number 28423 (Diagram 100A)
   
29/05/1953 Works Visit Works Visit - Darlington Works (Light Casual) - Arr: 29/05/1953. Dep: 08/07/1953.    
05/12/1953 Works Visit Works Visit - Gorton Works (General) - Arr: 05/12/1953. Dep: 16/01/1954.
Work undertaken:
Boiler number 28168 (Diagram 100A)
   
19/01/1954 Works Visit Works Visit - Gorton Works (Unclassified) - Arr: 19/01/1954. Dep: 06/02/1954.    
17/02/1954 Works Visit Works Visit - Gorton Works (Unclassified) - Arr: 17/02/1954. Dep: 05/03/1954.    
15/10/1955 Works Visit Works Visit - Darlington Works (General) - Arr: 15/10/1955. Dep: 17/11/1955.
Work undertaken:
Boiler number 28151 (Diagram 100A)
   
21/09/1957 Works Visit Works Visit - Darlington Works (General) - Arr: 21/09/1957. Dep: 24/10/1957.
Work undertaken:
Boiler number 28820 (Diagram 100A)
   
27/10/1957 Works Visit Works Visit - Gateshead Works (Unclassified) - Arr: 27/10/1957. Dep: 05/11/1957.    
08/12/1959 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/12/1959. Dep: 02/01/1960.
Work undertaken:
Boiler number 28580 (Diagram 100A)
   
04/02/1961 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 04/02/1961. Dep: 02/03/1961.    
16/09/1962 Withdrawn Condemned as 61150 from Sheffield Darnall (41A)    
03/1963 Scrapped Broken up by Cashmore's: Great Bridge    

prev prev