Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 25 Online
» 1435 Today
» 4397 Yesterday
» 19238 Week
» 72254 Month
» 191781 Year
» 3218634 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1946) 1125 on 06/02/1947
British Railways 61125   09/11/1948

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder North British Locomotive Company, Glasgow
Order Number L958
Works Number 25881
Fittings (as built)
Engine Brakes Steam
To Service Sat 06/02/1947 to Doncaster (DON)
Withdrawal Sat 28/12/1963 off Doncaster (36A)
Service Life 16 yrs, 10 mths , 22 dys

Disposal
Scrapping Wed 08/01/1964 at Locomotive Works (Doncaster)

Notes
Notes 8/1/64 into Doncaster for cutting up

Allocations
Code Subsequent Codes Name From Date
DON   Doncaster (New) on 06/02/1947
36E   Retford Thrumpton (G.C.) on 08/06/1950
36A   Doncaster on 16/07/1950
     Withdrawn on 28/12/1963

SLS Allocations*
Type Code Name From Date
NEW DON Doncaster on 06/02/1947
ALLOC 36E Retford Thrumpton (G.C.) on 08/06/1950
ALLOC 36A Doncaster w/e 16/07/1950
WDN   on 28/12/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/02/1947 Diagram 100A boiler fitted (number 9713)
09/11/1948 Diagram 100A boiler fitted (number 9712)
13/12/1950 Diagram 100A boiler fitted (number 28119)
29/08/1952 Diagram 100A boiler fitted (number 28801)
13/05/1954 Diagram 100A boiler fitted (number 28423)
09/06/1956 Diagram 100A boiler fitted (number 28522)
05/09/1958 Diagram 100A boiler fitted (number 28956)
14/12/1960 Diagram 100A boiler fitted (number 28193)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 03/10/1948 09/11/1948 38 days General Boiler number 9712 (Diagram 100A)
Renumbered to BR 61125
 
Doncaster Works 28/03/1949 29/03/1949 2 days Weighing    
Doncaster Works 13/11/1950 13/12/1950 31 days General Boiler number 28119 (Diagram 100A)
 
Doncaster Works 05/08/1952 29/08/1952 25 days General Boiler number 28801 (Diagram 100A)
 
Darlington Works 13/04/1954 13/05/1954 31 days General Boiler number 28423 (Diagram 100A)
 
Doncaster Works 27/09/1955 05/10/1955 9 days Light Casual    
Doncaster Works 08/05/1956 09/06/1956 33 days General Boiler number 28522 (Diagram 100A)
 
Doncaster Works 02/01/1957 09/01/1957 8 days Unclassified    
Doncaster Works 06/08/1958 05/09/1958 31 days General Boiler number 28956 (Diagram 100A)
 
Doncaster Works 15/11/1960 14/12/1960 30 days General Boiler number 28193 (Diagram 100A)
 
Doncaster Works 22/07/1963 08/08/1963 18 days Unclassified    

Mentions ...
Report Date Title Report Source
28/02/1947 Queens Park Works During January ten new Class 'B.1' engines appeared ex Q.P. Works, Nos. 1114-1123 inclusive; whilst during February a further ten appeared, viz., Nos. 1124-1133 inclusive. Works Nos. checked are as follows:, 1114-1118 (25870-4/46), 1120-1123 (25876-9/46), 1125-1133 (25881-9/46). SLS/194705

Summary
Date Event Details Source See Also
06/02/1947 To Service To service as London and North Eastern Railway Number 1125
Built at North British Locomotive Company, Glasgow, Works Number 25881
Allocated to Doncaster (DON)
Diagram 100A boiler fitted
   
03/10/1948 Works Visit Works Visit - Doncaster Works (General) - Arr: 03/10/1948. Dep: 09/11/1948.
Work undertaken:
Boiler number 9712 (Diagram 100A)
Renumbered to BR 61125
   
28/03/1949 Works Visit Works Visit - Doncaster Works (Weighing) - Arr: 28/03/1949. Dep: 29/03/1949.    
08/06/1950 Allocation Reallocated to Retford Thrumpton (G.C.) (36E)    
16/07/1950 Allocation Reallocated to Doncaster (36A)    
13/11/1950 Works Visit Works Visit - Doncaster Works (General) - Arr: 13/11/1950. Dep: 13/12/1950.
Work undertaken:
Boiler number 28119 (Diagram 100A)
   
05/08/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 05/08/1952. Dep: 29/08/1952.
Work undertaken:
Boiler number 28801 (Diagram 100A)
   
13/04/1954 Works Visit Works Visit - Darlington Works (General) - Arr: 13/04/1954. Dep: 13/05/1954.
Work undertaken:
Boiler number 28423 (Diagram 100A)
   
27/09/1955 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 27/09/1955. Dep: 05/10/1955.    
08/05/1956 Works Visit Works Visit - Doncaster Works (General) - Arr: 08/05/1956. Dep: 09/06/1956.
Work undertaken:
Boiler number 28522 (Diagram 100A)
   
02/01/1957 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 02/01/1957. Dep: 09/01/1957.    
06/08/1958 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/08/1958. Dep: 05/09/1958.
Work undertaken:
Boiler number 28956 (Diagram 100A)
   
15/11/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 15/11/1960. Dep: 14/12/1960.
Work undertaken:
Boiler number 28193 (Diagram 100A)
   
22/07/1963 Works Visit Works Visit - Doncaster Works (Unclassified) - Arr: 22/07/1963. Dep: 08/08/1963.    
28/12/1963 Withdrawn Condemned as 61125 from Doncaster (36A)    
08/01/1964 Scrapped Broken up by Locomotive Works: Doncaster    

prev prev