Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 17 Online
» 856 Today
» 4397 Yesterday
» 18659 Week
» 71675 Month
» 191202 Year
» 3218055 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1946) 1104 on 06/12/1946
British Railways 61104   18/12/1948

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder North British Locomotive Company, Glasgow
Order Number L958
Works Number 25864
Fittings (as built)
Engine Brakes Steam
To Service Sat 06/12/1946 to Stratford (STR)
Withdrawal Sat 18/04/1964 off Canklow (41D)
Service Life 17 yrs, 4 mths , 12 dys

Disposal
Scrapping During 06/1964 at W.E.Smiths (Ecclesfield)

Notes
Notes Sold for scrap 6/64 to W F Smith, Ecclesfeld

Allocations
Code Subsequent Codes Name From Date
STR   Stratford (New) on 06/12/1946
PKS   Parkeston Quay on 07/09/1947
STR   Stratford on 01/02/1948
STR   Stratford w/e 07/02/1948
31A   Cambridge on 08/02/1959
41A   Sheffield Darnall on 03/05/1959
41F   Mexborough on 29/11/1959
41A   Sheffield Darnall on 10/01/1960
41F   Mexborough on 09/09/1962
41D   Canklow on 09/12/1962
     Withdrawn on 18/04/1964

SLS Allocations*
Type Code Name From Date
NEW STR Stratford on 06/12/1946
ALLOC PKS Parkeston Quay w/e 13/09/1947
ALLOC STR Stratford w/e 07/02/1948
ALLOC 31A Cambridge 4w/e 21/02/1959
ALLOC 41A Sheffield Darnall 4w/e 16/05/1959
ALLOC 41F Mexborough 4w/e 26/12/1959
ALLOC 41A Sheffield Darnall 4w/e 23/01/1960
ALLOC 41F Mexborough 4w/e 06/10/1962
ALLOC 41D Canklow 2w/e 15/12/1962
WDN   on 18/04/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
06/12/1946 Diagram 100A boiler fitted (number 9693)
21/12/1948 Diagram 100A boiler fitted (number 3625)
09/09/1950 Diagram 100A boiler fitted (number 28500)
26/07/1952 Diagram 100A boiler fitted (number 28556)
18/05/1954 Diagram 100A boiler fitted (number 28595)
29/05/1956 Diagram 100A boiler fitted (number 28410)
05/09/1958 Modified bogie springs fitted
05/09/1958 Diagram 100A boiler fitted (number 28166)
06/12/1960 Diagram 100A boiler fitted (number 28517)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Stratford Works 11/02/1948 20/03/1948 39 days Heavy    
Stratford Works 02/11/1948 21/12/1948 50 days General Boiler number 3625 (Diagram 100A)
Renumbered to BR 61104
 
Stratford Works 08/08/1950 09/09/1950 33 days General Boiler number 28500 (Diagram 100A)
 
Stratford Works 03/06/1952 26/07/1952 54 days General Boiler number 28556 (Diagram 100A)
 
Stratford Works 30/03/1954 18/05/1954 50 days General Boiler number 10834 (Diagram 100A)
 
Stratford Works 11/04/1956 29/05/1956 49 days General Boiler number 28410 (Diagram 100A)
 
Stratford Works 24/07/1958 05/09/1958 44 days General Boiler number 28166 (Diagram 100A)
Modified bogie springs fitted
 
Doncaster Works 04/11/1960 06/12/1960 33 days General Boiler number 28517 (Diagram 100A)
 

Mentions ...
Report Date Title Report Source
31/12/1946 Queens Park Works During December twelve new Class 'B1' engines appeared ex Q.P. Works, Nos. 1102-1113 inclusive (74 in 8&nfrac12; months), No. 1111 being the N.B. Loco. Co.'s 'Christmas present' to the L.N.E.R.-it was ex Works on 25.12.46! No. 1112 was ex Works 27.12.46, and 1113 on either Mon-day 30th or Tuesday 31st, before the Works closed down for the New Year holidays. 1111 ran trials on 28/12, and on 4/1/47 was observed working the 2.25 p.m. Glasgow-Edinburgh train. Works Nos. checked are as follows: 1106 (25859/46), 1107 (26861/46), 1109 (25865/46), 1110 (25866/46), 1111 (25867/46), 1112 (25868/46). It will be noted there is further confusion. On 23/12 1114 was noted in Q.P. Works Erecting Shop with Works plates 25870/46, although 1113 had no plates fitted. The Maker's plates are not usually fitted until the engine is in the Paint Shop. On the above date up to 1116 (which only lacked wheels), were noted in the Works. 1111 and 1112 were in the Paint Shop. No. 6399 'D.11' 'Allan-Bane' was noted at Eastfleld on 2/1/47 still un-Renumbered. This must be one of the very few not yet renumbered in Scotland. The last one noted was 'J6' 9668 in Cowlairs Works Yard on 7/12/46, and 'V.2' 4819 on the same day. 9668 has since appeared as 5240. SLS/194702
03/05/1964 Doncaster Works (Waiting Works) Near Erecting Shop: E3101-4 bodies. Works Yard: D1562 damaged, 68925, DEP100, D5513, D5593, D5815, D5816, D6734, D6737, D6757, D8234. Inside Erecting Shop: 12103, D1695, D2212, D2216, D2572, D3631, D4061, D5052, D5526, D5575, D5582, D5601, D5688, D5693, D5814, D5820, D5831, D5838, D6720, D6744, D8211, D8239, D8400, D9015. Side of Stripping Shop: D3446. Side of Erecting Shop: 63601. Waiting Cutting Up: 90263. Stripping Shop: D1508, D3484, D5564, D5603, D9008. Outside Weigh Shop: D380 ex works, D2013 ex works, D1509, D4031, D5573, D5631. Inside Paint Shop: LNER 4771, E1217, D2563, D6898. Waiting Works: 61104, 63594, 63645, 63836, 90717. Ex Works: D5528. Stored: 61080, 90111, 90165, 90583, 92169, 92170, 92175. SLS/196406
07/06/1964 Doncaster Shed (Waiting Works) Waiting Works: D2233, 61104, 63594, 63645/7, 63836, 90717 SLS/196407

Summary
Date Event Details Source See Also
06/12/1946 To Service To service as London and North Eastern Railway Number 1104
Built at North British Locomotive Company, Glasgow, Works Number 25864
Allocated to Stratford (STR)
Diagram 100A boiler fitted
   
07/09/1947 Allocation Reallocated to Parkeston Quay (PKS)    
01/02/1948 Allocation Reallocated to Stratford (STR)    
07/02/1948 Allocation Reallocated to Stratford (STR)    
11/02/1948 Works Visit Works Visit - Stratford Works (Heavy) - Arr: 11/02/1948. Dep: 20/03/1948.    
02/11/1948 Works Visit Works Visit - Stratford Works (General) - Arr: 02/11/1948. Dep: 21/12/1948.
Work undertaken:
Boiler number 3625 (Diagram 100A)
Renumbered to BR 61104
   
08/08/1950 Works Visit Works Visit - Stratford Works (General) - Arr: 08/08/1950. Dep: 09/09/1950.
Work undertaken:
Boiler number 28500 (Diagram 100A)
   
03/06/1952 Works Visit Works Visit - Stratford Works (General) - Arr: 03/06/1952. Dep: 26/07/1952.
Work undertaken:
Boiler number 28556 (Diagram 100A)
   
30/03/1954 Works Visit Works Visit - Stratford Works (General) - Arr: 30/03/1954. Dep: 18/05/1954.
Work undertaken:
Boiler number 10834 (Diagram 100A)
   
11/04/1956 Works Visit Works Visit - Stratford Works (General) - Arr: 11/04/1956. Dep: 29/05/1956.
Work undertaken:
Boiler number 28410 (Diagram 100A)
   
24/07/1958 Works Visit Works Visit - Stratford Works (General) - Arr: 24/07/1958. Dep: 05/09/1958.
Work undertaken:
Boiler number 28166 (Diagram 100A)
Modified bogie springs fitted
   
08/02/1959 Allocation Reallocated to Cambridge (31A)    
03/05/1959 Allocation Reallocated to Sheffield Darnall (41A)    
29/11/1959 Allocation Reallocated to Mexborough (41F)    
10/01/1960 Allocation Reallocated to Sheffield Darnall (41A)    
04/11/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 04/11/1960. Dep: 06/12/1960.
Work undertaken:
Boiler number 28517 (Diagram 100A)
   
09/09/1962 Allocation Reallocated to Mexborough (41F)    
09/12/1962 Allocation Reallocated to Canklow (41D)    
18/04/1964 Withdrawn Condemned as 61104 from Canklow (41D)    
06/1964 Scrapped Broken up by W.E.Smiths: Ecclesfield    

prev prev