Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 17 Online
» 2940 Today
» 4163 Yesterday
» 16346 Week
» 69362 Month
» 188889 Year
» 3215742 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London and North Eastern Railway (1946) 1093 on 04/11/1946
British Railways 61093   01/03/1949

Locomotive Specifics
Designer E. Thompson
Class B1
Company History LNER
Wheels 4-6-0
Builder North British Locomotive Company, Glasgow
Order Number L958
Works Number 25849
Fittings (as built)
Engine Brakes Steam
To Service Sun 04/11/1946 to Doncaster (DON)
Withdrawal Sun 25/07/1965 off Langwith Junction (41J)
Service Life 18 yrs, 8 mths , 21 dys

Disposal
Scrapping During 09/1965 at Cohens (Ickles)

Notes
Notes Sold for scrap 9/65 to G Cohen, Sheffield

Allocations
Code Subsequent Codes Name From Date
DON   Doncaster (New) on 04/11/1946
41F   Mexborough on 14/06/1959
41D   Canklow on 31/12/1961
36A   Doncaster on 28/03/1965
41J   Langwith Junction on 11/07/1965
     Withdrawn on 25/07/1965

SLS Allocations*
Type Code Name From Date
NEW DON Doncaster w/e 09/11/1946
ALLOC HITL Hitchin (GNR) on 20/11/1946
ALLOC 41F Mexborough 4w/e 11/07/1959
ALLOC 41C Sheffield Millhouses 4w/e 05/08/1961
ALLOC 41D Canklow on 01/01/1962
ALLOC 36A Doncaster 5w/e 03/04/1965
ALLOC 41J Langwith Junction 4w/e 24/07/1965
WDN   w/e 25/07/1965

* Stephenson Locomotive Society data - raw and not yet cross-referenced
Modifications
Date Modified Modification
04/11/1946 Diagram 100A boiler fitted (number 9686)
01/03/1949 Diagram 100A boiler fitted (number 9755)
06/02/1951 Diagram 100A boiler fitted (number 28127)
16/01/1953 Diagram 100A boiler fitted (number 28300)
08/12/1956 Diagram 100A boiler fitted (number 28344)
08/07/1958 Diagram 100A boiler fitted (number 28814)
26/01/1961 Diagram 100A boiler fitted (number 28413)


Works Visits
Works Stopped Entry Departure Duration Level of Work Actual Mileage
Doncaster Works 26/01/1949 01/03/1949 35 days General Boiler number 9755 (Diagram 100A)
Renumbered to BR 61093
 
Doncaster Works 20/07/1949 18/08/1949 30 days Light Casual    
Doncaster Works 16/01/1951 06/02/1951 22 days General Boiler number 28127 (Diagram 100A)
 
Doncaster Works 17/12/1952 16/01/1953 31 days General Boiler number 28300 (Diagram 100A)
 
Doncaster Works 04/10/1954 03/11/1954 31 days General    
Doncaster Works 25/01/1955 01/02/1955 8 days Light Casual    
Doncaster Works 06/11/1956 08/12/1956 33 days General Boiler number 28344 (Diagram 100A)
 
Doncaster Works 29/05/1958 08/07/1958 41 days General Boiler number 28814 (Diagram 100A)
 
Doncaster Works 29/12/1960 26/01/1961 29 days General Boiler number 28413 (Diagram 100A)
 

Mentions ...
Report Date Title Report Source
31/12/1946 General New 'B.1' 4-6-0's, Nos. 1089-99, etc. (from 1094 they are green), are much in evidence on outer suburban, Hitchin' etc., workings at King's Cross. Scottish visitors seen there before Christmas were: Blue 'A.4' 4, William Whitelaw, and 'V.2' 834 (late 4805), both of Haymarket. Gateshead or Heaton 'Pacifics' and 'Green Arrows' often get through to London. N.E., G.C., and G.E. locos. still appear from time to time on G.N. freight, parcel or similar trains. The G.E. principal express workings to Liverpool Street (including the East Anglian) from Norwich are regularly operated by the new standard 2-cyl. 4-6-0's, with drivers keeping their own loco. as far as possible. These excellent engines are on other G.E. as well as G.C. fast passenger turns also. SLS/194702
31/12/1961 Millhouses closure Millhouses M.P.D. (41C) was closed as from 31/12/61 and its allocation of locomotives distributed as follows : 41209/45/6, 43037, 45570/6/90/4, 45602/7/27/54/6/64/83/725, 45536, 46131/47/8/51/4, 46450, 61083/93, 61820/2, 73016/65/155 all to Canklow (41D); 78022/3/4/5 to Doncaster (36A). SLS/196203

Summary
Date Event Details Source See Also
04/11/1946 To Service To service as London and North Eastern Railway Number 1093
Built at North British Locomotive Company, Glasgow, Works Number 25849
Allocated to Doncaster (DON)
Diagram 100A boiler fitted
   
26/01/1949 Works Visit Works Visit - Doncaster Works (General) - Arr: 26/01/1949. Dep: 01/03/1949.
Work undertaken:
Boiler number 9755 (Diagram 100A)
Renumbered to BR 61093
   
20/07/1949 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 20/07/1949. Dep: 18/08/1949.    
16/01/1951 Works Visit Works Visit - Doncaster Works (General) - Arr: 16/01/1951. Dep: 06/02/1951.
Work undertaken:
Boiler number 28127 (Diagram 100A)
   
17/12/1952 Works Visit Works Visit - Doncaster Works (General) - Arr: 17/12/1952. Dep: 16/01/1953.
Work undertaken:
Boiler number 28300 (Diagram 100A)
   
04/10/1954 Works Visit Works Visit - Doncaster Works (General) - Arr: 04/10/1954. Dep: 03/11/1954.    
25/01/1955 Works Visit Works Visit - Doncaster Works (Light Casual) - Arr: 25/01/1955. Dep: 01/02/1955.    
06/11/1956 Works Visit Works Visit - Doncaster Works (General) - Arr: 06/11/1956. Dep: 08/12/1956.
Work undertaken:
Boiler number 28344 (Diagram 100A)
   
29/05/1958 Works Visit Works Visit - Doncaster Works (General) - Arr: 29/05/1958. Dep: 08/07/1958.
Work undertaken:
Boiler number 28814 (Diagram 100A)
   
14/06/1959 Allocation Reallocated to Mexborough (41F)    
29/12/1960 Works Visit Works Visit - Doncaster Works (General) - Arr: 29/12/1960. Dep: 26/01/1961.
Work undertaken:
Boiler number 28413 (Diagram 100A)
   
31/12/1961 Allocation Reallocated to Canklow (41D)    
28/03/1965 Allocation Reallocated to Doncaster (36A)    
11/07/1965 Allocation Reallocated to Langwith Junction (41J)    
25/07/1965 Withdrawn Condemned as 61093 from Langwith Junction (41J)    
09/1965 Scrapped Broken up by Cohens: Ickles    

prev prev