Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 24 Online
» 1274 Today
» 5784 Yesterday
» 7058 Week
» 28447 Month
» 147974 Year
» 3174827 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D5301 12/09/1958  
TOPS (Tops) 26001 04/1974  

Locomotive Specifics
Class as Built 26
Subclass/Rebuild History
ClassFrom
26/012/09/1958
Wheels Bo-Bo
Builder Birmingham Railway Carriage & Wagon Company
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Multiple Fitting Blue Star
To Service 12/09/1958 to Hornsey (34B)
Withdrawn 04/10/1993
Time in Service 35 yrs , 22 dys
Status Preserved

Liveries Carried - WIP
Code Colour Date From
GNP Green with white cab window surrounds and white waistline band on bodyside 12/09/1958

Allocations - WIP
Code Subsequent Codes Name From Date
34B   Hornsey (New) on 12/09/1958
64B   Haymarket w/e 23/04/1960
ED   Eastfield on 15/05/1988
     Withdrawn on 04/10/1993

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
by 12/1966   Slow Speed Control fitted        
by 12/1966   Steam heat boiler removed        

Configuration - WIP
Date Configuration Description Additional Diagram Source
12/09/1958 vb Vacuum brakes, Steam heat      
by 12/1966 vos Vacuum brakes, No heat, Slow Speed Control      

Fires
Date of Fire Severity Damage Source of Fire Material Details Location
03/06/1964 Severe   Brake block sparks Oil impregnated dirt or waste    


Summary
Start Event Details Source See Also
12/09/1958 To Service To service as British Railways number D5301
Built at Birmingham Railway Carriage & Wagon Company
Allocated to Hornsey (34B)
Livery applied: Green with white cab window surrounds and white waistline band on bodyside
   
23/04/1960 Allocation Reallocated to Haymarket (64B)    
12/1966 Modification Modification: Slow Speed Control fitted    
12/1966 Modification Modification: Steam heat boiler removed    
04/1974 Renumbered Renumbered to 26001    
15/05/1988 Allocation Reallocated to Eastfield (ED)    
04/10/1993 Withdrawn Condemned as 26001    

prev prev