Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 31 Online
» 4215 Today
» 4616 Yesterday
» 34865 Week
» 133510 Month
» 336174 Year
» 3363027 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D5103 06/08/1960  
TOPS (Tops) 24103 02/1974  

Locomotive Specifics
Class as Built 24
Subclass/Rebuild History
ClassFrom
24/106/08/1960
Wheel Arrangement Bo-Bo
Builder Darlington Works
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Stone OK4610
Multiple Fitting Blue Star
Other Details Disc Route Indicators
To Service 06/08/1960 to Gateshead (52A)
Withdrawn 01/12/1976
Time in Service 16 yrs, 3 mths , 25 dys
Cut Up on 19/07/1977*
*Official list from Doncaster Works
Cut At Locomotive Works (Doncaster)
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GNP Green all over with a narrow white band around the bottom of the bodywork 06/08/1960
GFYE Green with full yellow cab front or nose by 07/1971

Allocations - WIP
Code Subsequent Codes Name From Date
52A   Gateshead (New) on 06/08/1960
IS   Inverness w/e 11/05/1974
     Stored 4w/e 25/10/1975
HA   Haymarket 5w/e 01/05/1976
     Stored 6w/e 04/09/1976
     Withdrawn on 01/12/1976

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
by 06/1967   Air compressor fitted        
by 06/1967   High level air pipe fitted        
by 06/1967   Water tanks removed        
by 06/1967   Steam heat boiler removed        
by 30/10/1970   EQ Brakes Added        
by 05/12/1970   EQ Brakes Added        

Configuration - WIP
Date Configuration Description Additional Diagram Source
06/08/1960 vb Vacuum brakes, Steam heat      
by 06/1967 vo Vacuum brakes, No heat      
by 30/10/1970 vo Vacuum brakes, No heat EQ Brakes    
by 05/12/1970 vo Vacuum brakes, No heat Modified Triple Valve & EQ Brakes    

Components
Fitted Component Details Removed Reason Removed
06/08/1960 Power Unit VA346    


Summary
Start Event Details Source See Also
06/08/1960 To Service To service as British Railways number D5103
Built at Darlington Works
Allocated to Gateshead (52A)
Livery applied: Green all over with a narrow white band around the bottom of the bodywork
   
06/1967 Modification Modification: Air compressor fitted    
06/1967 Modification Modification: High level air pipe fitted    
06/1967 Modification Modification: Steam heat boiler removed    
06/1967 Modification Modification: Water tanks removed    
30/10/1970 Modification Modification: EQ Brakes Added    
05/12/1970 Modification Modification: EQ Brakes Added    
07/1971 Livery Change of livery to Green with full yellow cab front or nose    
02/1974 Renumbered Renumbered to 24103    
11/05/1974 Allocation Reallocated to Inverness (IS)    
25/10/1975 To Store To Store    
01/05/1976 Allocation Reallocated to Haymarket (HA)    
04/09/1976 To Store To Store    
01/12/1976 Withdrawn Condemned as 24103    
07/1977 Scrapped Broken up by Locomotive Works: Doncaster    

prev prev