Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 1419 Today
» 5610 Yesterday
» 28598 Week
» 19654 Month
» 366078 Year
» 3392931 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
London, Midland & Scottish Railway 2416 on 15/11/1933
British Railways 42416 w/e 03/07/1948

Locomotive Specifics
Designer H. Fowler
Class 4P
Company History LMS
Wheels 2-6-4T
Builder Derby Works
To Service Sat 15/11/1933
Withdrawal Sat 27/06/1964
Service Life 30 yrs, 7 mths , 12 dys

Disposal
Scrapping During 09/1964

Allocations
Code Subsequent Codes Name From Date
    (New) on 15/11/1933
27B   Greenock Ladyburn on 01/01/1948 (Snapshot)
6H   Bangor 4w/e 24/04/1954
6A   Chester (MR) 4w/e 10/08/1957
1A   Willesden 4w/e 30/11/1957
9A   Longsight 4w/e 14/06/1958
5B   Crewe South w/e 09/01/1960
6H   Bangor w/e 18/06/1960
21A   Saltley w/e 20/08/1960
5C   Stafford w/e 16/05/1964
2E   Saltley w/e 20/06/1964
     Withdrawn on 27/06/1964

SLS Allocations*
Type Code Name From Date
ALLOC 6H Bangor 4w/e 17/04/1954
ALLOC 6A Chester (MR) 4w/e 13/07/1957
ALLOC IA   4w/e 02/11/1957
LOAN 5D Stoke 4w/e 22/02/1958
EXLOAN 5D Stoke 4w/e 22/02/1958
ALLOC 9A Longsight 4w/e 14/06/1958
ALLOC 5B Crewe South 4w/e 30/01/1960
ALLOC 6H Bangor 5w/e 02/07/1960
ALLOC 21A Saltley 4w/e 27/08/1960
ALLOC 5C Stafford 5w/e 06/06/1964
WDN   w/e 27/06/1964
ALLOC 2E Saltley 5w/e 11/07/1964

* Stephenson Locomotive Society data - raw and not yet cross-referenced

Mentions ...
Report Date Title Report Source
09/07/1949 St. Rollox Works Locomotives entering Works 6/6 to 9/7: These included Nos. 40187, 575, 614, 40670, 40914, 1138, 42416/18, 42751, 42830, 2875, 42912/14, 4011, 4198, 44234, 4881/86/99, 44900/31/77, 45008, 45120/55/60/65/66/70/92, 45423, 5432, 45452/61/89, 45577/84, 45643, 15141/89, 15211/37, 55356, 16162, 16247/75/95, 56359, 17282, 17411, 17554, 57619, 17625/67. During June, locomotives were still being turned out lettered 'British Railways' from this Works. SLS/194908
15/05/1954 Bangor MPD Much to the shed-master's chagrin, no L.N.W.R. 'old stagers' remain. The 'coal tank' has gone to Monument Lane, the 'Cauliflower' to Stoke-on-Trent, and the 2-4-2 tank to Crewe. The Amlwch branch is entirely worked by Ivatt 2-6-2 tanks, of which Bangor has Nos. 41200, 41212, 41223, an 41233. Periodic loads of iron pyrites are worked over the branch to the Associated Ethyl Corporation Works at Amlwch Port. The load for the 2-6-2 tanks was scheduled for 20 loaded wagons, but has had to be reduced to 16. A number of Fairburn and Stanier 2-6-4 tanks, which have been at Bangor for some time, have recently departed to Greenock, and from the latter shed two of the parallel boiler Fowler type have been received in exchange, Nos. 42415/6. The present L.Y.R. contingent, employed on shunting at Menai Bridge Sidings, local trips and on the Bangor Harbour branch, comprised Nos. 52219, 52269/70. The only L.N.W.R. locomotive seen at Bangor was No. 49416 of 8D, which had arrived the previous day with a load of sleepers. The other 'visitors' were No. 45595 of 9A and one of the inevitable 'Austerity' 2-8-0's from Mold Junction. SLS/195407
31/10/1959 Chester Northgate MPD Chester Northgate (6D) now has an allocation of 10 2-car diesel sets. The final steam allocation was 41215/323, 42303/17/416/7, 75030/52, 84001. Some freight turns are now being worked by Northwich whilst Chester 6A has acquired 46472 (ex N.E.R.) to cover a Northgate turn. SLS/196003
15/12/1961 Derby Works (Erecting Shop) Diesel Erecting Shop: D85, D92, D2220, D2504, D2908/9, D5091, D8037, 11118/55. Former Paint Shop: D77, D107, D2506. Test House: D88, D98, D146/7/50, D5019, 10202, 12068. Shunter Test House: 12082. New Building: D152-D161. Finishing Shop: D149/51, D2503, D5016, D8016. Erecting Shop: 12088, 12101, 42416, 42588, 43929, 44043, 44202/11/44, 44401, 44539, 47307/22, 47435/64, 47649, 48005/50/61, 48334, 73044, 73133, 75031/60. Paint Shop: D148, MR 1000 (sheeted), 42366, 58850 (bearing cast iron plate mounted in the centre of each side tank with the number 2650 and the words L.&-N.W.R. BOW WORKS 1880). Works Sidings: ED3, 12000/62, 13169, 41168, 42236, 42328/30/2/63/95, 42404/12, 42448, 42510/21/4/34, 43295, 43368, 43826/32, 47161, 47218, 47444, 47664, 48079, 48392, 48495, 58174/5, 73142. SLS/196201
04/01/1962 Derby Works (Erecting Shop) Diesel Erecting Shop: D85, D122, D2220, D2502/4, D2904/9, D5015/6/9, D8016/37, 11155, 44211 (for painting). New Building: D154/5 (engines in), D156-61 (bodywork complete), D162-4 (Body shells only). Finishing Shop: D74, D99, D152/3, D2503. Erecting Shop: 12062/88, 12101, 13169/74, 42236, 42313, 42416, 41826, 43925/63/71, 44156, 44200, 44411, 47161, 47257/79, 47349, 47587, 47664/71, 48117. 48293, 48392, 48495. 73133. 75019/31. New Paint Shop: D151, M R. 1000 (sheeted), 44043, 47307/22. 48061. Works Sidings: D72, D98, D101, D111, D126, ED3, 12000, 41168, 42078, 42328/30/2/55/63/95, 42404/12/48, 42510/21/4/34/88, 43295, 43368, 43658, 43832, 47218, 47444, 48775, 58174/5. LNW 2650. Shunters : D2377/81/83. 47000. SLS/196202
16/01/1962 Derby Works (Paint Shop) Diesel Erecting Shop: D74, D85, D122, D126, D2220, D2504, D2904, D5019, D8037, 11155. Test House: D151/2, D5077. New Building: D156-D165. Finishing Shop: D101, D154/5, D2503, D5016/75, D8016. Erecting Shop: D3022, 12062, 12101, 13169/74, 13292, 42236, 42313, 42400, 43658, 43832 (being cut-up), 43925/63/94, 44179, 44605, 47161, 47257/79, 47343/9/75, 47664/71/80, 48008, 48117, 48293, 48775 (66A), 58174 (for cut up), 75019. Paint Shop: D153, MR 1000 (sheeted), 42416, 44156. Outside: L. & N.W. 2650 (repainted black with red buffer beams, the number 2650 being hand painted on the smokebox door). Works Sidings: ED3, D2, D119, D123, D5018, 12000, 41168, 42078, 42306/28/30/63/95, 42402/4/9/48, 43295, 43368, 43679, 43971, 44166, 44224, 47003, 47218, 47444, 47543, 47675, 58175. SLS/196202
04/12/1963 Saltley MPD Of the Fowler 2-6-4Ts, 42419 was condemned 4th December, 42417 is waiting works (?) leaving 42400/16/21 in traffic, although Drivers complain they have inadequate brake power on goods trains. 46505/26/9 have arrived, the latter two green; some Class 4Fs are to come out of store, probably for Bescot in lieu of LNW Super Ds. SLS/196401

Summary
Date Event Details Source See Also
15/11/1933 To Service To service as London, Midland & Scottish Railway Number 2416
Built at Derby Works
   
01/01/1948 Allocation Allocation Snapshot - Greenock Ladyburn (27B)    
03/07/1948 Renumbered Renumbered to 42416    
24/04/1954 Allocation Reallocated to Bangor (6H)    
10/08/1957 Allocation Reallocated to Chester (MR) (6A)    
30/11/1957 Allocation Reallocated to Willesden (1A)    
14/06/1958 Allocation Reallocated to Longsight (9A)    
09/01/1960 Allocation Reallocated to Crewe South (5B)    
18/06/1960 Allocation Reallocated to Bangor (6H)    
20/08/1960 Allocation Reallocated to Saltley (21A)    
16/05/1964 Allocation Reallocated to Stafford (5C)    
20/06/1964 Allocation Reallocated to Saltley (2E)    
27/06/1964 Withdrawn Condemned as 42416    
09/1964 Scrapped Scrapped    

prev prev