Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 621 Today
» 4868 Yesterday
» 19532 Week
» 84486 Month
» 287150 Year
» 3314003 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D3915 02/12/1960  
TOPS (Tops) 08747 03/1974  

Locomotive Specifics
Class as Built 08
Subclass/Rebuild History
ClassFrom
0802/12/1960
Wheels 0-6-0
Builder Crewe Works
To Service 02/12/1960 to Polmadie (66A)
Withdrawn 11/07/1990 off Gateshead (GD)
Time in Service 29 yrs, 7 mths , 9 dys
Cut Up on 05/11/1993
Cut At Gwent Demolition (Margam)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
66A   Polmadie (New) on 02/12/1960
52A   Gateshead 4w/e 22/06/1968
51L   Thornaby 4w/e 20/07/1968
52A   Gateshead w/e 07/09/1968
     Withdrawn on 11/07/1990

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
08/1968   Air Brakes fitted        

Configuration - WIP
Date Configuration Description Additional Diagram Source
02/12/1960 v Vacuum brakes      
08/1968 x Dual brakes      


Summary
Start Event Details Source See Also
02/12/1960 To Service To service as British Railways number D3915
Built at Crewe Works
Allocated to Polmadie (66A)
   
22/06/1968 Allocation Reallocated to Gateshead (52A)    
20/07/1968 Allocation Reallocated to Thornaby (51L)    
08/1968 Modification Modification: Air Brakes fitted    
07/09/1968 Allocation Reallocated to Gateshead (52A)    
03/1974 Renumbered Renumbered to 08747    
11/07/1990 Withdrawn Condemned as 08747 from Gateshead (GD)    
05/11/1993 Scrapped Broken up by Gwent Demolition: Margam    

prev prev