Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 25 Online
» 2433 Today
» 4616 Yesterday
» 33083 Week
» 131728 Month
» 334392 Year
» 3361245 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D379 21/02/1962  
TOPS (Tops) 40179 02/1974  

Locomotive Specifics
Class as Built 40
Subclass/Rebuild History
ClassFrom
4021/02/1962
Wheel Arrangement 1Co-Co1
Builder English Electric Vulcan Foundry
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Stone OK4625
Multiple Fitting Blue Star
Other Details Central Headcode Box
To Service 21/02/1962 to Camden (1B)
Withdrawn 01/02/1981
Time in Service 18 yrs, 11 mths , 11 dys
Cut Up m/e 03/1982
Cut At Locomotive Works (Swindon)
Status Scrapped

Liveries Carried - WIP
Code Colour Date From
GSYP Green bodywork with small yellow warning panel 21/02/1962
BFYE BR Blue bodywork, full yellow cab front by 04/1978

Allocations - WIP
Code Subsequent Codes Name From Date
1B   Camden (New) on 21/02/1962
2F   Bescot w/e 03/01/1966
WL   Western Lines (LMR) on 18/04/1966
9A   Longsight w/e 15/06/1968
D09   Manchester Division on 17/06/1968
D08   Liverpool Division w/e 09/05/1970
KD   Carlisle Kingmoor 3w/e 08/05/1976
SP   Springs Branch (Wigan) m/e 01/1977
KD   Carlisle Kingmoor m/e 04/1977
     Withdrawn on 01/02/1981

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
by 06/01/1970   Steam heat boiler isolated        
by 30/08/1970   Steam heat boiler isolated        
by 11/1977   Modified headcode box (black blinds with 2 marker lights)        

Configuration - WIP
Date Configuration Description Additional Diagram Source
21/02/1962 vb Vacuum brakes, Steam heat      
by 06/01/1970 vi Vacuum brakes, Isolated boiler      
by 30/08/1970 vi Vacuum brakes, Isolated boiler      


Summary
Start Event Details Source See Also
21/02/1962 To Service To service as British Railways number D379
Built at English Electric Vulcan Foundry
Allocated to Camden (1B)
Livery applied: Green bodywork with small yellow warning panel
   
03/01/1966 Allocation Reallocated to Bescot (2F)    
18/04/1966 Allocation Reallocated to Western Lines (LMR) (WL)    
15/06/1968 Allocation Reallocated to Longsight (9A)    
17/06/1968 Allocation Reallocated to Manchester Division (D09)    
06/01/1970 Modification Modification: Steam heat boiler isolated    
09/05/1970 Allocation Reallocated to Liverpool Division (D08)    
30/08/1970 Modification Modification: Steam heat boiler isolated    
02/1974 Renumbered Renumbered to 40179    
08/05/1976 Allocation Reallocated to Carlisle Kingmoor (KD)    
01/1977 Allocation Reallocated to Springs Branch (Wigan) (SP)    
04/1977 Allocation Reallocated to Carlisle Kingmoor (KD)    
11/1977 Modification Modification: Modified headcode box (black blinds with 2 marker lights)    
04/1978 Livery Change of livery to BR Blue bodywork, full yellow cab front    
01/02/1981 Withdrawn Condemned as 40179    
03/1982 Scrapped Broken up by Locomotive Works: Swindon    

prev prev