Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 13 Online
» 759 Today
» 4463 Yesterday
» 26641 Week
» 49612 Month
» 396036 Year
» 3422889 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D376 05/02/1962  
TOPS (Tops) 40176 02/1974  

Locomotive Specifics
Class as Built 40
Subclass/Rebuild History
ClassFrom
4005/02/1962
Wheel Arrangement 1Co-Co1
Builder English Electric Vulcan Foundry
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Stone OK4625
Multiple Fitting Blue Star
Other Details Central Headcode Box
To Service 05/02/1962 to Camden (1B)
Withdrawn 23/08/1981 off Healey Mills (HM)
Time in Service 19 yrs, 6 mths , 18 dys
Cut Up m/e 12/1985
Cut At Locomotive Works (Swindon)
Information Main generator
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
1B   Camden (New) on 05/02/1962
2F   Bescot w/e 03/01/1966
WL   Western Lines (LMR) on 18/04/1966
9A   Longsight w/e 15/06/1968
D09   Manchester Division on 17/06/1968
GD   Gateshead w/e 11/05/1974
HM   Healey Mills w/e 29/02/1976
     Withdrawn on 23/08/1981

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
by 06/01/1970   Steam heat boiler isolated        
by 30/08/1970   Steam heat boiler isolated        
14/06/1975   Air Brakes fitted        
by 12/1978   Modified headcode box (black blinds with 2 marker lights)        

Configuration - WIP
Date Configuration Description Additional Diagram Source
05/02/1962 vb Vacuum brakes, Steam heat      
by 06/01/1970 vi Vacuum brakes, Isolated boiler      
by 30/08/1970 vi Vacuum brakes, Isolated boiler      
14/06/1975 xi Dual brakes, Isolated boiler      


Summary
Start Event Details Source See Also
05/02/1962 To Service To service as British Railways number D376
Built at English Electric Vulcan Foundry
Allocated to Camden (1B)
   
03/01/1966 Allocation Reallocated to Bescot (2F)    
18/04/1966 Allocation Reallocated to Western Lines (LMR) (WL)    
15/06/1968 Allocation Reallocated to Longsight (9A)    
17/06/1968 Allocation Reallocated to Manchester Division (D09)    
06/01/1970 Modification Modification: Steam heat boiler isolated    
30/08/1970 Modification Modification: Steam heat boiler isolated    
02/1974 Renumbered Renumbered to 40176    
11/05/1974 Allocation Reallocated to Gateshead (GD)    
14/06/1975 Modification Modification: Air Brakes fitted    
29/02/1976 Allocation Reallocated to Healey Mills (HM)    
12/1978 Modification Modification: Modified headcode box (black blinds with 2 marker lights)    
23/08/1981 Withdrawn Condemned as 40176 from Healey Mills (HM)    
12/1985 Scrapped Broken up by Locomotive Works: Swindon    

prev prev