Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 22 Online
» 1703 Today
» 4397 Yesterday
» 19506 Week
» 72522 Month
» 192049 Year
» 3218902 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Pre TOPS (Pre Tops) D345 17/05/1961  
TOPS (Tops) 40145 26/01/1974  

Locomotive Specifics
Class as Built 40
Subclass/Rebuild History
ClassFrom
4017/05/1961
Wheels 1Co-Co1
Builder English Electric Vulcan Foundry
Works Number 3091/D641
Fittings (as built)
Train Brakes Vacuum Brakes fitted
Steam Boiler Stone OK4625
Multiple Fitting Blue Star
Other Details Central Headcode Box
To Service 17/05/1961 to Neville Hill (55H)
Withdrawn 10/06/1983
Time in Service 22 yrs , 24 dys
Information Derailment damage
Status Preserved

Liveries Carried - WIP
Code Colour Date From
GNP All over Green including front of cab 17/05/1961

Allocations - WIP
Code Subsequent Codes Name From Date
55H   Neville Hill (New) on 17/05/1961
50A   York (North) w/e 12/01/1963
56B   Healey Mills 4w/e 28/01/1967
52A   Gateshead w/e 11/10/1969
HM   Healey Mills w/e 29/02/1976
HA   Haymarket on 05/03/1978
     Withdrawn on 10/06/1983

Modifications - WIP
Date Modified Order Number Modification Status Charged to Capital Charged to Revenue Total Cost
24/09/1969   Air Brakes fitted        
by 06/1974   Steam heat boiler isolated        
12/10/1976   Steam heat boiler reinstated        
09/1978   Steam heat boiler isolated        

Configuration - WIP
Date Configuration Description Additional Diagram Source
17/05/1961 vb Vacuum brakes, Steam heat      
24/09/1969 xb Dual brakes, Steam heat      
by 06/1974 xi Dual brakes, Isolated boiler      
12/10/1976 xb Dual brakes, Steam heat      
09/1978 xi Dual brakes, Isolated boiler      

Preservation
Current Status Unknown


Summary
Start Event Details Source See Also
17/05/1961 To Service To service as British Railways number D345
Built at English Electric Vulcan Foundry, Works Number 3091
Allocated to Neville Hill (55H)
Livery applied: All over Green including front of cab
   
12/01/1963 Allocation Reallocated to York (North) (50A)    
28/01/1967 Allocation Reallocated to Healey Mills (56B)    
24/09/1969 Modification Modification: Air Brakes fitted    
11/10/1969 Allocation Reallocated to Gateshead (52A)    
26/01/1974 Renumbered Renumbered to 40145    
06/1974 Modification Modification: Steam heat boiler isolated    
29/02/1976 Allocation Reallocated to Healey Mills (HM)    
12/10/1976 Modification Modification: Steam heat boiler reinstated    
03/1978 Allocation Reallocated to Haymarket (HA)    
09/1978 Modification Modification: Steam heat boiler isolated    
10/06/1983 Withdrawn Condemned as 40145    

prev prev