Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 21 Online
» 1888 Today
» 4397 Yesterday
» 19691 Week
» 72707 Month
» 192234 Year
» 3219087 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Type Number Date From Notes
Post 1948 (1955 Num) 13324 19/11/1956  
Pre TOPS (Pre Tops) D3324 17/03/1960  
TOPS (Tops) 08254 02/1974  

Locomotive Specifics
Class as Built 08
Subclass/Rebuild History
ClassFrom
0819/11/1956
Wheels 0-6-0
Builder Darlington Works
To Service 19/11/1956 to Percy Main (52E)
Withdrawn 02/11/1986 off Gateshead (GD)
Time in Service 29 yrs, 11 mths , 14 dys
Cut Up 13/05/1994
Cut At C F Booth (Rotherham)
Status Scrapped

Allocations - WIP
Code Subsequent Codes Name From Date
52E   Percy Main (New) on 19/11/1956
52B   Heaton w/e 13/12/1958
52A   Gateshead w/e 20/06/1959
52E   Percy Main w/e 08/06/1963
     Withdrawn on 02/11/1986

Configuration - WIP
Date Configuration Description Additional Diagram Source
19/11/1956 v Vacuum brakes      

Components
Fitted Component Details Removed Reason Removed
19/11/1956 Power Unit IH3518    


Summary
Start Event Details Source See Also
19/11/1956 To Service To service as British Railways number 13324
Built at Darlington Works
Allocated to Percy Main (52E)
   
13/12/1958 Allocation Reallocated to Heaton (52B)    
20/06/1959 Allocation Reallocated to Gateshead (52A)    
17/03/1960 Renumbered Renumbered to 3324    
08/06/1963 Allocation Reallocated to Percy Main (52E)    
02/1974 Renumbered Renumbered to 08254    
02/11/1986 Withdrawn Condemned as 08254 from Gateshead (GD)    
13/05/1994 Scrapped Broken up by C F Booth: Rotherham    

prev prev