Menu

Quick Search

Enter locomotive number in the box below and press 'Go'!

Content is coming here as you probably can see. Content is coming here as you probably can see.


?

In Touch

Donations

Counter

Ad Visitor Statistics
» 15 Online
» 678 Today
» 4616 Yesterday
» 31328 Week
» 129973 Month
» 332637 Year
» 3359490 Total
Record: 10235 (26/09/2023)
(Free MySQL Counter)
prev prev
Numbers Carried
Company Number Date From
Great Western Railway (Orig) 3293 m/e 04/1898
Great Western Railway (1912) 4101 m/e 12/1912

Names Carried
Date From Name
04/1898 BARRINGTON

Locomotive Specifics
Designer W. Dean
Class Badminton
Company History GWR
Wheels 4-4-0
Builder Swindon Works
Order Number 109
Works Number 1593
To Service During 04/1898
Withdrawal During 04/1930
Service Life 32 yrs

Disposal

Allocations
Code Subsequent Codes Name From Date
    (New) m/e 04/1898
     Withdrawn m/e 04/1930

Modifications
Date Modified Modification
02/1904 Diagram BR0 boiler fitted (Belpaire firebox)
03/1910 Diagram D3 boiler fitted
07/1911 Superheated boiler fitted
07/1911 Diagram D3 boiler fitted
01/1915 Rebuilt with Piston Valves


Summary
Date Event Details Source See Also
04/1898 To Service To service as Great Western Railway Number 3293, name: BARRINGTON
Built at Swindon Works, Works Number 1593
Diagram BR4 boiler fitted
   
02/1904 Modification Diagram BR0 boiler fitted    
03/1910 Modification Diagram D3 boiler fitted    
07/1911 Modification Diagram D3 boiler fitted    
07/1911 Modification Modification: Superheated boiler fitted    
12/1912 Renumbered Renumbered to 4101    
01/1915 Modification Modification: Rebuilt with Piston Valves    
04/1930 Withdrawn Condemned as 4101    

prev prev